Category:REPORTS-TOPICAL (BY MANUFACTURERS-VENDORS ETC)
MONTHYEARML20198R2331997-04-30030 April 1997 Rev 2 to Quad Cities Unit 2 Cycle 145 Reload Analysis ML20198T3251997-04-18018 April 1997 Non-proprietary Rev 1 to EMF-96-180, Quad Cities Unit 2 Cycle 15 Plant Transient Analysis ML20078E5171995-01-25025 January 1995 Correction to Encl 3, Equivalent Margin Analysis Plant Applicability Verification Form of Topical Rept NEDO-32205-A,Rev 1 ML20078D8611995-01-0505 January 1995 Shroud Repair Seismic Analysis ML20078A7451994-06-30030 June 1994 Evaluation of Indications Found at H5 Weld Location in Quad Cities Unit 1 Shroud ML20065Q8531990-11-30030 November 1990 Rev 0 to, Comm Ed Topical Benchmark of BWR Nuclear Design Methods ML19332E4071989-10-16016 October 1989 Errata & Addendum 1 to, Safety Evaluation to Justify Operation W/Loss of Jet Pump Flow Indication for Quad Cities 1 & 2 ML19325C9131989-03-31031 March 1989 Safety Evaluation to Justify Operation W/Loss of Jet Pump Flow Indication for Quad Cities,Units 1 & 2 ML20235C4871987-07-31031 July 1987 Extended Operating Domain & Equipment Out-of-Svc for Quad Cities Nuclear Power Station Units 1 & 2. B Wolfe Affidavit Also Encl ML20235C4331987-06-30030 June 1987 Rev 0 to Suppl Reload Licensing Submittal for Quad Cities Nuclear Power Station Unit 1,Reload 9 ML20205F2711985-08-31031 August 1985 Errata & Addenda Sheet 14,replacing Pages v/vi,3-2,4-3,4-10, 4-15 & 4-16 to, LOCA Analysis Rept for Dresden Units 2,3 & Quad Cities 1,2 Nuclear Power Stations ML20106A6481985-01-31031 January 1985 Errata & Addenda Sheet 13,replacing Pages v/vi,3-2,4-3, 4-15 & 4-16 to, LOCA Anaysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations ML20245F2901984-06-30030 June 1984 Hpci/Rcic Room Leak Detection,Phase II & III ML20245F2711984-01-31031 January 1984 Hpci/Rcic Room Leak Detection,Phase I Rept ML20106A6051983-04-30030 April 1983 Errata & Addenda Sheet 10,replacing Page 4-11 to, LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations ML20069J5541982-09-30030 September 1982 Errata & Addenda Sheet 8,replacing Page 4-10 to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations ML20063C4871982-07-31031 July 1982 Errata & Addenda Sheet 7,replacing Pages 4-11 & 4-14 to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations ML20065L8711982-07-31031 July 1982 GE BWR Extended Load Line Limit Analysis for Quad Cities Nuclear Power Station,Unit 1,Cycle 7 & Unit 2,Cycle 6 ML17194A0651981-07-31031 July 1981 Errata & Addenda Sheet 6,replacing Pages V/VI,3-1,3-2,4-3 & 4-14,to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations. ML20037D4741981-06-29029 June 1981 Mark I Plant Containment Mod Status Summary ML17194A0631981-05-31031 May 1981 Errata & Addenda Sheet 5,replacing Pages V/VI,3-1/3-2,4-10, 4-12,4-13 & 4-14 to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations. ML19343C3751981-02-28028 February 1981 Generic Info for Barrier Fuel Demonstration Bundle Licensing, Approved Version ML19351G2261981-01-0202 January 1981 5 to QA Program for Facilities ML19343A9901980-11-13013 November 1980 Revised Page 4-8 to LOCA Analysis Rept. Supplemental Discussion of NEDO-24855 Encl ML19343A9831980-08-31031 August 1980 Plant:Extended Burnup Fuel Program ML19250B9991978-12-31031 December 1978 Load Line Limit Analysis License Amend Submittal. 1997-04-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000254/LER-1999-004-03, :on 990910,CREVS Air Filtration Unit Was Declared Inoperable.Caused by Airflow Rate in Excess of TS Allowable.Airflow Was Adjusted During Performance of Surveillance Procedure Qcos 5750-021999-10-12012 October 1999
- on 990910,CREVS Air Filtration Unit Was Declared Inoperable.Caused by Airflow Rate in Excess of TS Allowable.Airflow Was Adjusted During Performance of Surveillance Procedure Qcos 5750-02
05000254/LER-1999-003-05, :on 990907,noted That HPCI Was Inoperable Due to Manual Closure of HPCI Steam Supply Isolation Valve.Cause Indeterminate.Suppl LER Will Be Issued Upon Determination of Root Cause of Control Switch Failure1999-10-0707 October 1999
- on 990907,noted That HPCI Was Inoperable Due to Manual Closure of HPCI Steam Supply Isolation Valve.Cause Indeterminate.Suppl LER Will Be Issued Upon Determination of Root Cause of Control Switch Failure
SVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20216H8481999-09-23023 September 1999 Safety Evaluation Supporting Amends 190 & 187 to Licenses DPR-29 & DPR-30,respectively ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212J0501999-09-21021 September 1999 Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20210U7831999-08-0404 August 1999 Safety Evaluation Supporting Amends 189 & 186 to Licenses DPR-29 & DPR-30,respectively ML20210L8661999-08-0202 August 1999 Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With 05000265/LER-1999-002-04, :on 990527,station Personnel Discovered Unsealed One Inch Diameter Pipe Penetrating Secondary Containment.Caused by Lack of Proper Work Control.Util Will Permanently Cap Spare Subject Pipe by 9907151999-06-25025 June 1999
- on 990527,station Personnel Discovered Unsealed One Inch Diameter Pipe Penetrating Secondary Containment.Caused by Lack of Proper Work Control.Util Will Permanently Cap Spare Subject Pipe by 990715
ML20196F4261999-06-25025 June 1999 Safety Evaluation Supporting Amends 188 & 185 to Licenses DPR-29 & DPR-30,respectively 05000254/LER-1999-004-02, :on 990521,reactor Scram Occurred.Caused by Steam Intrusion Into Scram Discharge Volume.Procedure Qcop 12200-11, RWCU Sys Startup & Pump Operation, Revised1999-06-18018 June 1999
- on 990521,reactor Scram Occurred.Caused by Steam Intrusion Into Scram Discharge Volume.Procedure Qcop 12200-11, RWCU Sys Startup & Pump Operation, Revised
ML20195K1481999-06-16016 June 1999 Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20210H3501999-05-25025 May 1999 Rev 1 to Quad Cities Station IPEEE Submittal Rept ML20207E1621999-05-25025 May 1999 Rev 1 to Quad Cities IPEEE, Consisting of Revised Chapter 4.0 Re Internal Fire Analysis ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations 05000254/LER-1999-001-04, :on 970715,three Spare Valves Were Determined to Require Monthly Verification in Accordance with TS SR 4.7.A.2.Caused by Inadequate Review of Procedure Rev. Surveillance Revised to Ensure to Continued Compliance1999-05-12012 May 1999
- on 970715,three Spare Valves Were Determined to Require Monthly Verification in Accordance with TS SR 4.7.A.2.Caused by Inadequate Review of Procedure Rev. Surveillance Revised to Ensure to Continued Compliance
SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with1999-04-30030 April 1999 Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with ML20205Q5291999-04-16016 April 1999 SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205J6011999-04-0707 April 1999 Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2 ML20205F4791999-03-31031 March 1999 Safety Evaluation Supporting Amends 187 & 184 to Licenses DPR-29 & DPR-30,respectively SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20205D4171999-03-26026 March 1999 Safety Evaluation Supporting Amends 186 & 183 to Licenses DPR-29 & DPR-30,respectively ML20205C5671999-03-19019 March 1999 Simulator Four-Yr Certification Rept ML20204D9751999-03-17017 March 1999 Safety Evaluation Supporting Amends 185 & 182 to Licenses DPR-29 & DPR-30,respectively ML20207D2341999-03-0101 March 1999 Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205 ML20204B1571999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.With SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With1999-01-31031 January 1999 Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With ML20205D1311998-12-31031 December 1998 1998 Decommissioning Funding Status Rept for Yr Ending 981231 for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20198S6841998-12-22022 December 1998 Safety Evaluation Re Proposed Merger of Calenergy Co,Inc & Midamarican Energy Holdings Co.Nrc Should Approve Application with Listed Condition ML20196F8931998-12-0303 December 1998 Safety Evaluation Supporting Amend 182 to License DPR-29 ML20196G1241998-11-30030 November 1998 COLR for Quad Cities Unit 1 Cycle 16 SVP-98-364, Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196C8731998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-30-1, Fracture Mechanics Evaluation on Observed Indications at Two Welds in Recirculation Piping of Quad Cities,Unit 1 Station ML20196C8391998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1 ML20196D9651998-11-30030 November 1998 Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by Licensee ML20196A9761998-11-20020 November 1998 Safety Evaluation Re Licensee 180-day Response to GL 95-07, Thermal Binding of Safety-Related Power-operated Gate Valves ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB SVP-98-346, Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-98-358, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With1998-10-31031 October 1998 Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With 05000254/LER-1998-001-01, :on 980105,EDG Failed to Start When Received Inadvertent Start Signal.Caused by Degraded Fuse Clip in EDG Control Power Circuit.Corrective Actions Have Included Training,Counseling,Component Testing & Evaluation1998-10-27027 October 1998
- on 980105,EDG Failed to Start When Received Inadvertent Start Signal.Caused by Degraded Fuse Clip in EDG Control Power Circuit.Corrective Actions Have Included Training,Counseling,Component Testing & Evaluation
05000265/LER-1998-006-04, :on 980918,Unit 2 Entered 12 H LCO to Hot Shutdown,Due to HPCI & RCIC Being Declared Inoperable.Caused by Inadequate Procedure Rev.Revised Procedure Qcis 0200-061998-10-15015 October 1998
- on 980918,Unit 2 Entered 12 H LCO to Hot Shutdown,Due to HPCI & RCIC Being Declared Inoperable.Caused by Inadequate Procedure Rev.Revised Procedure Qcis 0200-06
1999-09-30
[Table view] |