Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078L495 + (05:26:32, 15 December 2024)
- ML20078L487 + (05:26:33, 15 December 2024)
- ML20078L478 + (05:26:37, 15 December 2024)
- 05000282/LER-1994-009-01, :on 941029,design Basis Reconstitution Effort Uncovered Design Deficiency in Containment Isolation Function.Caused by Oversight During Original Plant Design. Procedures Revised + (05:26:38, 15 December 2024)
- ML20078L470 + (05:26:39, 15 December 2024)
- ML20078L466 + (05:26:40, 15 December 2024)
- ML20078L456 + (05:26:40, 15 December 2024)
- ML20078L454 + (05:26:41, 15 December 2024)
- NRC-94-0124, Comments on NRC SE of Fermi 2 Restart Action Plan Issues Closeout Per Confirmatory Action Ltr on 931225 Turbine Event + (05:26:41, 15 December 2024)
- NRC-94-0122, Provides Addl Info Re Confirmatory Action Ltr on 931225 Turbine Event.List of Areas Covered by Turbine Sys Plant Walkdown Encl + (05:26:42, 15 December 2024)
- ML20078L448 + (05:26:43, 15 December 2024)
- 05000237/LER-1983-066-03, /03L-0:on 830918,MSIV 2D 2.5 Closure Time Exceeded Tech Spec Requirement of 3 to 5 S.Caused by Timing Mechanism Out of Adjustment.Mechanism Adjusted + (05:26:44, 15 December 2024)
- NG-94-4196, Confirms Completion of Operator Training in Response to Generic Ltr 94-02 + (05:26:45, 15 December 2024)
- ML20078L432 + (05:26:46, 15 December 2024)
- ML20078L438 + (05:26:46, 15 December 2024)
- BSEP-95-0014, Requests NRC Concurrence W/Cp&L Plans for Future Insps of FW Spargers for Bsep,Units 1 & 2.As Described in Encl,Cp&L Plans to Perform Visual Exam of FW Spargers in Lieu of Liquid Penetrant Testing Reqired by NRC + (05:26:47, 15 December 2024)
- PY-CEI-NRR-1907, Forwards Color Transparencies from Aerial Remote Sensing Programs Conducted at Plant in 1987,1988,1990 & 1992 Per Section 4.2.2.1 of Environ Protection Plan,App B to License NPF-58 + (05:26:48, 15 December 2024)
- ML20078L415 + (05:26:48, 15 December 2024)
- ML20078L386 + (05:26:49, 15 December 2024)
- ML20078L394 + (05:26:49, 15 December 2024)
- ML20078L385 + (05:26:51, 15 December 2024)
- ML20078L379 + (05:26:52, 15 December 2024)
- ML20078L380 + (05:26:52, 15 December 2024)
- ML20078L343 + (05:26:54, 15 December 2024)
- ML20078L369 + (05:26:54, 15 December 2024)
- ML20078L340 + (05:26:55, 15 December 2024)
- ML20078L337 + (05:26:57, 15 December 2024)
- ML20078L336 + (05:26:58, 15 December 2024)
- ML20078L329 + (05:27:00, 15 December 2024)
- ML20078L328 + (05:27:00, 15 December 2024)
- ML20078L325 + (05:27:01, 15 December 2024)
- ML20078L308 + (05:27:02, 15 December 2024)
- ML20078L303 + (05:27:02, 15 December 2024)
- ML20078L295 + (05:27:04, 15 December 2024)
- ML20078L281 + (05:27:05, 15 December 2024)
- ML20078L276 + (05:27:06, 15 December 2024)
- BVY-94-116, Forwards Annual Cashflow Statements for Plant & Nine Sponsor Companies for Yr 1994 + (05:27:07, 15 December 2024)
- ML20078L263 + (05:27:08, 15 December 2024)
- ML20078L262 + (05:27:10, 15 December 2024)
- ML20078L245 + (05:27:11, 15 December 2024)
- ML20078L235 + (05:27:12, 15 December 2024)
- 05000318/LER-1983-048-03, /03L-0:on 830901,hydrogen Recombiner 21 Found Inoperable.Caused by Loose Hex Nut Allowing Terminals on Back of Potentiometer to Be Twisted & Pulled.Potentiometer Replaced + (05:27:13, 15 December 2024)
- ML20078L215 + (05:27:14, 15 December 2024)
- TXX-4060, Forwards Affidavit of Svc of Amend 44 to FSAR + (05:27:15, 15 December 2024)
- 05000458/LER-1994-028, :on 941028,manual Reactor Scram Occurred Due to Turbine Vibration.Caused by Temp Sensitive Rotor.Expanded Limitations Which MSRs Can Be Placed in or Removed from Svc to Allow Decrease in Temp Step Changes + (05:27:16, 15 December 2024)
- ML20078L204 + (05:27:21, 15 December 2024)
- ML20078L202 + (05:27:22, 15 December 2024)
- WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations + (05:27:22, 15 December 2024)
- ML20078L198 + (05:27:23, 15 December 2024)
- 05000278/LER-1983-009-01, /01T-0:on 830908,during Surveillance Testing W/One Diesel Generator Inoperable,Breaker Between Diesel Generator E-1 & Emergency Bus E-13 Failed to Close Manually.Cause Unknown.Breaker Tested Successfully + (05:27:25, 15 December 2024)
- 05000333/LER-1983-029-03, /03L-0:on 830829,hydraulic Snubber H12-94 (12-1-S-20) Failed to Lockup in Compression When Tested. Caused by Poppet Spring Lodged Between Compression Poppet & Seat.Modified Valve Assembly Installed + (05:27:27, 15 December 2024)