Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078L956 + (05:24:20, 15 December 2024)
- ML20078L958 + (05:24:20, 15 December 2024)
- ML20078L952 + (05:24:21, 15 December 2024)
- 05000318/LER-1994-006-01, :on 941027,Unit 2 Tripped on Receipt of Reactor Protective Sys Loss of Load Signal.Caused by Failure to Adequately Address Potential Risks of Work Newly Assumed by Electrical Maint Group.New Links Installed + (05:24:23, 15 December 2024)
- ML20078L947 + (05:24:24, 15 December 2024)
- 05000336/LER-1994-032, :on 941028,post Incident Recirculation Fan Flow Below Design Occurred.Cause Unknown.Work Scheduled to Adjust Fan Blades as Necessary to Achieve Required Air Flow Rate.W/ + (05:24:26, 15 December 2024)
- ML20078L938 + (05:24:27, 15 December 2024)
- ML20078L928 + (05:24:28, 15 December 2024)
- ML20078L916 + (05:24:30, 15 December 2024)
- ML20078L905 + (05:24:30, 15 December 2024)
- ML20078L902 + (05:24:32, 15 December 2024)
- ML20078L900 + (05:24:33, 15 December 2024)
- U-602372, Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 + (05:24:33, 15 December 2024)
- ML20078L896 + (05:24:34, 15 December 2024)
- ML20078L885 + (05:24:34, 15 December 2024)
- ML20078L883 + (05:24:35, 15 December 2024)
- 05000219/LER-1994-019, :on 941019,SBO Power Supply Failed to Start During Functional Test Due to Inadequate Design Mod Due to Inadequate Administrative Control.Ups Installed to Power Gas Leak for CT-1 + (05:24:36, 15 December 2024)
- ML20078L871 + (05:24:38, 15 December 2024)
- ML20078L867 + (05:24:39, 15 December 2024)
- ML20078L860 + (05:24:39, 15 December 2024)
- ML20078L859 + (05:24:40, 15 December 2024)
- ML20078L844 + (05:24:41, 15 December 2024)
- ML20078L855 + (05:24:41, 15 December 2024)
- PY-CEI-NRR-1906, Forwards Copies of Three Oh EPA Approvals for Use of Cooling Water Sys Additives at Perry Nuclear Power Plant Received Since Apr 1992 for Info + (05:24:42, 15 December 2024)
- ML20078L821 + (05:24:43, 15 December 2024)
- ML20078L817 + (05:24:44, 15 December 2024)
- ML20078L811 + (05:24:45, 15 December 2024)
- ML20078L814 + (05:24:45, 15 December 2024)
- ML20078L809 + (05:24:46, 15 December 2024)
- ML20078L807 + (05:24:47, 15 December 2024)
- ML20078L800 + (05:24:48, 15 December 2024)
- ML20078L793 + (05:24:49, 15 December 2024)
- ML20078L799 + (05:24:49, 15 December 2024)
- ML20078L787 + (05:24:50, 15 December 2024)
- ML20078L790 + (05:24:50, 15 December 2024)
- ML20078L785 + (05:24:51, 15 December 2024)
- ML20078L783 + (05:24:52, 15 December 2024)
- ML20078L782 + (05:24:52, 15 December 2024)
- HL-4784, Monthly Operating Repts for Jan 1995 for Ei Hatch Nuclear Plant + (05:24:53, 15 December 2024)
- ML20078L779 + (05:24:53, 15 December 2024)
- ML20078L773 + (05:24:55, 15 December 2024)
- ML20078L770 + (05:24:56, 15 December 2024)
- ML20078L764 + (05:24:57, 15 December 2024)
- ML20078L763 + (05:24:57, 15 December 2024)
- ML20078L761 + (05:24:58, 15 December 2024)
- ML20078L754 + (05:24:59, 15 December 2024)
- ML20078L757 + (05:24:59, 15 December 2024)
- ML20078L752 + (05:25:00, 15 December 2024)
- DCL-95-013, Forwards Public Version of Revised Epips,Including Rev 11A to EP RB-11,rev 7A to EP RB-15:F,rev 4A to EP RB-15:G,rev 15A to EP EF-2 & Rev 14D to EP G-4.W/950208 Release Memo + (05:25:01, 15 December 2024)
- ML20078L748 + (05:25:02, 15 December 2024)
- 05000325/LER-1994-013, :on 941023,control Bldg Emergency Air Filtration Isolation Occurred.Caused by Personnel Error & Procedure Inadequacy.Chlorinator Sys Operating Procedure Revised + (05:25:07, 15 December 2024)