ML20078L860

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review for Braidwood/Byron Application to Revise TS 5.6.5, Core Operating Limits Report
ML20078L860
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 03/18/2020
From: Joel Wiebe
Plant Licensing Branch III
To: Zurawski L
Exelon Generation Co
References
Download: ML20078L860 (2)


Text

From:

Wiebe, Joel Sent:

Wednesday, March 18, 2020 10:22 AM To:

Lisa Zurawski (Lisa.Zurawski@exeloncorp.com)

Subject:

Acceptance Review for Braidwood/Byron Application to Revise TS 5.6.5, "Core Operating Limits Report" Hi Lisa, By letter dated February 28, 2020 (Agencywide Documents Access and Management System Accession No. ML20063A400), Exelon Generation Company, LLC submitted a license amendment request to revise technical specification 5.6.5, Core Operating Limits Report (COLR), at Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this proposed alternative. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 260 hours0.00301 days <br />0.0722 hours <br />4.298942e-4 weeks <br />9.893e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is February 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me at (301) 415-6606.

Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier:

NRR_DRMA Email Number:

483 Mail Envelope Properties (MN2PR09MB521048278CFF7AEBE3E2CEFC8BF70)

Subject:

Acceptance Review for Braidwood/Byron Application to Revise TS 5.6.5, "Core Operating Limits Report" Sent Date:

3/18/2020 10:21:39 AM Received Date:

3/18/2020 10:21:00 AM From:

Wiebe, Joel Created By:

Joel.Wiebe@nrc.gov Recipients:

"Lisa Zurawski (Lisa.Zurawski@exeloncorp.com)" <Lisa.Zurawski@exeloncorp.com>

Tracking Status: None Post Office:

MN2PR09MB5210.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2448 3/18/2020 10:21:00 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: