Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079A268 + (05:02:25, 15 December 2024)
- ML20079A244 + (05:02:37, 15 December 2024)
- ML20079A235 + (05:02:43, 15 December 2024)
- ML20079A230 + (05:02:44, 15 December 2024)
- ML20079A229 + (05:02:44, 15 December 2024)
- ML20079A214 + (05:02:45, 15 December 2024)
- ML20079A223 + (05:02:45, 15 December 2024)
- BECO-90-115, Responds to Generic Ltr 90-03 Re Vendor Interface for safety-related Components,Per 840427 & s.Vendor Program Based on Vendor Equipment Technical Info Program,Per Nuclear Util Task Action Committee Rept INPO 80-010 + (05:02:46, 15 December 2024)
- ML20079A193 + (05:02:46, 15 December 2024)
- ML20079A185 + (05:02:47, 15 December 2024)
- AECM-90-0179, Responds to NRC Re Violations Noted in Insp Rept 50-416/90-15.Corrective Actions:Procedure 02-S-01-5 Changed to Require Control Power Fuses & Fuse Replacements Be Recorded in Log Book + (05:02:48, 15 December 2024)
- BECO-90-116, Submits Commitment to Change Procedure 1.2.1, Operations Review Committee, Per 900809 Proposed Amend to Tech Spec Section 6 + (05:02:48, 15 December 2024)
- ML20079A163 + (05:03:01, 15 December 2024)
- RC-95-0046, Requests Discontinuation of Seismic Monitoring Network Around Plant,On Basis That Min Requirements of OL Condition 2.C (24) Have Been Satisfied + (05:03:01, 15 December 2024)
- ML20079A138 + (05:03:19, 15 December 2024)
- ML20079A134 + (05:03:25, 15 December 2024)
- ML20079A126 + (05:03:28, 15 December 2024)
- ML20079A128 + (05:03:28, 15 December 2024)
- ML20079A099 + (05:03:49, 15 December 2024)
- ML20079A059 + (05:04:08, 15 December 2024)
- ML20079A054 + (05:04:09, 15 December 2024)
- ML20079A039 + (05:04:15, 15 December 2024)
- ML20078T064 + (05:04:23, 15 December 2024)
- ML20079A020 + (05:04:23, 15 December 2024)
- BSEP-94-0520, Forwards NUREG-0619 FW Nozzle & Safe End Exam Results & Engineering Evaluation Rept 94-0182, Unit 2 FW Sparger Evaluation Following Iviv Exams + (05:04:24, 15 December 2024)
- ML20078T047 + (05:04:25, 15 December 2024)
- GO2-94-282, Forwards Rev 27 to Nuclear Plant 2 License NPF-21 WNP-2 Physical Security Plan.W/O Encl (Ref 10CFR73.21) + (05:04:26, 15 December 2024)
- NG-94-4691, Forwards Correction to Notary Signature Date on Licensee Ltr to WT Russell on 941212 (NG-94-4452).Notary Dtd Incorrectly & Rectified on Attached Sheet + (05:04:35, 15 December 2024)
- NG-94-4690, Forwards Correction to Notary Signature Date on Licensee Ltr to WT Russell on 941213 (NG-94-4401).Notary Dtd Incorrectly & Rectified on Attached Sheet + (05:04:36, 15 December 2024)
- ML20078S968 + (05:04:43, 15 December 2024)
- ML20078S961 + (05:04:44, 15 December 2024)
- ML20078S957 + (05:04:45, 15 December 2024)
- ML20078S950 + (05:04:46, 15 December 2024)
- ML20078S939 + (05:04:47, 15 December 2024)
- RBG-41123, Forwards Response to NRC follow-up to RAI Re GL 92-08, Requesting Addl Info for Section Ii.B, Important Barrier Parameters & Section Iii.B, Thermo-Lag Fire Barriers Outside Scope of NUMARC Program + (05:04:47, 15 December 2024)
- ML20078S903 + (05:04:55, 15 December 2024)
- ML20078S892 + (05:05:02, 15 December 2024)
- ML20078S889 + (05:05:02, 15 December 2024)
- ML20078S838 + (05:05:56, 15 December 2024)
- ML20078S835 + (05:06:03, 15 December 2024)
- ML20078S833 + (05:06:04, 15 December 2024)
- ML20078S826 + (05:06:14, 15 December 2024)
- ML20078S830 + (05:06:14, 15 December 2024)
- 05000333/LER-1994-010-01, :on 941202,shutdown Cooling Isolation Occurred Due to Personnel Error & Poor Work Practices.Responsible Individual Counseled by Operations Dept Mgt + (05:06:18, 15 December 2024)
- 0CAN129404, Forwards Rev 31 to ANO Isp.Rev Adds Light Fixture HPS04, to Figure 4D + (05:06:33, 15 December 2024)
- ML20078S821 + (05:06:33, 15 December 2024)
- ML20078S814 + (05:06:36, 15 December 2024)
- ML20078S799 + (05:06:37, 15 December 2024)
- ML20078S796 + (05:06:39, 15 December 2024)
- 05000327/LER-1994-014, :on 941129,turbine Tripped Followed by Reactor Trip as Result of Loss of Both Turbine 48-volt EHC Power Supplies.Caused by Electrical Spike on Power Supply Output. CR Personnel Took Prescribed Action + (05:06:43, 15 December 2024)
- ML20078S790 + (05:06:46, 15 December 2024)