Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079J402 + (04:25:01, 15 December 2024)
- ML20079J401 + (04:25:02, 15 December 2024)
- IR 05000412/1983016 + (04:25:03, 15 December 2024)
- ML20079J394 + (04:25:04, 15 December 2024)
- ML20079J397 + (04:25:04, 15 December 2024)
- ML20079J382 + (04:25:05, 15 December 2024)
- 05000416/LER-1982-123-99, /99X-1:on 821102,fire Barrier Penetrations to Cabinets in Control Bldg Broken to Complete Planned Maint Activity.Fire Watch Established.Penetrations Resealed. Limiting Conditions for Operation Cleared + (04:25:06, 15 December 2024)
- ML20079J378 + (04:25:07, 15 December 2024)
- RBG-13-985, Interim Deficiency Rept DR-79 Re Failure to Follow Weld Procedures on Field Weld.Initially Reported on 821123. Investigation Continuing.Next Rept Expected by 830228 + (04:25:08, 15 December 2024)
- ML20079J372 + (04:25:09, 15 December 2024)
- ML20079J370 + (04:25:09, 15 December 2024)
- 05000373/LER-1982-158, Forwards LER 82-158/03L-0 + (04:25:10, 15 December 2024)
- ML20079J363 + (04:25:10, 15 December 2024)
- ML20079J359 + (04:25:11, 15 December 2024)
- ML20079J357 + (04:25:12, 15 December 2024)
- ML20079J354 + (04:25:12, 15 December 2024)
- 05000416/LER-1982-139-03, /03L-0:on 821118,smoke Detector in Control Cabinet Room Alarmed & Would Not Reset.No Smoke or Fumes Present in Area.Caused by Defective Detector.Fire Watch Established & Detector Replaced + (04:25:14, 15 December 2024)
- ML20079J349 + (04:25:15, 15 December 2024)
- ML20079J346 + (04:25:16, 15 December 2024)
- 05000416/LER-1982-139, Forwards LER 82-139/03L-0 + (04:25:17, 15 December 2024)
- ML20079J345 + (04:25:17, 15 December 2024)
- ML20079J339 + (04:25:18, 15 December 2024)
- 05000250/LER-1982-016-03, /03L-0:on 821119,during Insp of Fire Protection Sys,Fire Barrier Penetration (Laundry Room West Doors) Found Nonfunctional.New Doors/Parts Ordered & Will Be Installed Upon Receipt + (04:25:19, 15 December 2024)
- ML20079J335 + (04:25:20, 15 December 2024)
- ML20079J326 + (04:25:21, 15 December 2024)
- ML20079J325 + (04:25:21, 15 December 2024)
- 05000250/LER-1982-016, Forwards LER 82-016/03L-0 + (04:25:22, 15 December 2024)
- ML20079J321 + (04:25:22, 15 December 2024)
- IR 05000327/2020011 + (04:25:36, 15 December 2024)
- 05000250/LER-1982-017-03, /03L-0:on 821119,during Control Room Mods,Two Fire Barrier Penetrations Disabled Intentionally for Longer than 7 Days.Action Taken to Implement Approved Design Mods to Control Room + (04:25:41, 15 December 2024)
- ML20079J312 + (04:25:42, 15 December 2024)
- ML20079J311 + (04:25:42, 15 December 2024)
- ML20079J310 + (04:25:43, 15 December 2024)
- 05000370/LER-1983-084-03, /03L-0:on 831206,during Performance of Chemical & Vol Control Sys Valve Stroke Timing Test,Valve 2NV-842A,C Failed to Close within Required Closure Time.Caused by Failed Electrical Contact + (04:25:44, 15 December 2024)
- 05000250/LER-1982-017, Forwards LER 82-017/03L-0 + (04:25:45, 15 December 2024)
- ML20079J298 + (04:25:46, 15 December 2024)
- 05000266/LER-1982-025-03, /03L-0:on 821117,while Reviewing Test Data,Two 480-volt Safeguards Undervoltage Relays Found Not Meeting 0 Volt Time Delay Spec.Relays Adjusted to within Spec & Returned to Svc + (04:25:47, 15 December 2024)
- ML20079J295 + (04:25:52, 15 December 2024)
- 05000366/LER-1982-122-03, /03L-0:on 821123,during Mode 1 at 2,417 Mwt,Fire Detector Surveillance safety-related Areas Procedure Not Completed by Latest Possible Date (821123).Caused by Personnel Oversight.Personnel Counselled + (04:25:53, 15 December 2024)
- 05000366/LER-1982-122, Forwards LER 82-122/03L-0 + (04:25:54, 15 December 2024)
- 05000266/LER-1982-025, Forwards LER 82-025/03L-0 + (04:25:55, 15 December 2024)
- ML20079J278 + (04:25:56, 15 December 2024)
- ML20079J273 + (04:25:56, 15 December 2024)
- 05000416/LER-1982-138, Interim LER 82-138/99X-0:on 821112,during Shutdown,Several Duct Covers Could Not Be Installed Due to Cables Extending Through Ducts.Caused by Faulty Design Document.Engineering Evaluation Underway + (04:25:57, 15 December 2024)
- 05000259/LER-1982-096-01, /01T-0:on 821206,during Startup,Control Rod 18-51 Double Notched from 08 to 12,resulting in Large Reactivity Insertion & Causing Reactor to Scram.Cause Attributed to Normal Degradation of Control Rod Drive Seals + (04:26:02, 15 December 2024)
- 05000280/LER-1982-117-03, /03L-0:on 821129,specific Activity Samples of RCS Indicated Dose Equivalent I-131 Level Greater than Tech Spec Limit.Caused by Fuel Element Defect in Reactor Core. Accelerated Sampling Frequency Implemented + (04:26:04, 15 December 2024)
- ML20079J250 + (04:26:05, 15 December 2024)
- ML20079J248 + (04:26:05, 15 December 2024)
- 05000259/LER-1982-096, Forwards LER 82-096/01T-0 + (04:26:06, 15 December 2024)
- ML20079J247 + (04:26:06, 15 December 2024)
- 05000348/LER-1983-089-03, /03L-0:on 831215,radiation Monitor R-11 Declared Inoperable Due to Improper Valve Lineup.Caused by Personnel Error.Valve Lineup Corrected + (04:26:08, 15 December 2024)
- ML20079J233 + (04:26:11, 15 December 2024)