l PROCEDURE QA-121 PAGE CS-1 l lHEV!SION 6

~ '

NUCLEAR REGULATORY COMMISSION REPORTING DUKE POWER COMPANY REQUIREMENTS QUALITY ASSURANCE DEPARTMENT

= -%

DATE /c 5/g t QUALITY ASSURANCE PROGRAM co eaare ouaur, any.ca ma=aen LIST oF PAGES VALID FoR THIS REVISloN*

PAGES REVISloN

  • Page CS-1 6 Page 1 2 Page 2 5 Page 3 3
  • Form 290.1 3 Enclosure 6.1 1 Enclosure 6.2 2 Enclosure 6.3 3
  • Indicates pages affected by this revision.

s' 8401240302 840113 PDR ADOCK 05000369 S PDR

~.

QA qAM

' Paga L Pr:c: dura QA-121 'R:; vision 2

Title:

NUCLEAR REGULATORY COMMISSION REPORTING REQUIREMENTS

Purpose:

To establish the procedure for determining the reportability of and subsequent-reporting of significant items to the Nuclear Regulatory Commission (NRC) as required by the following regulations:

a. 10CFR21
b. 10CFR50, Section 50.55(e)

Scope:

This procedure applies to identified during the design, construction, and operation of a nuclear p ant which are required to be evaluated for reportability to the NRC.

Definitions:

Reportable items - Those significant items which have been evaluated pursuant to this procedure and the applicable regulations and are determined to be reportable to the Nuclear Regulatory Commission.

e_

Potentially Reportable items - Those items which are of such significance that a complete ana l ys i s may find them reportable.

1. RESPONSIBILITY 1.1 The Corporate Quality Assurance Manager is responsible for problem evaluation and initial reporting to the Nuclear Regulatory Commission.

(STEAM PRODUCTION WILL REPORT TO NRC ON OPERATING LICENSED UNITS.)

1.2 Persons detecting items or events which they believe to be reportable shall be responsible to see that such items are reported to management under the provisions of this procedure.

2. PROCEDURE 2.1 The attached flow charts outline items or events which are potentially reportable to the Nuclear Regulatory Commission in accordance with applicable regulations.

2.2 When a deficiency is identified that may be reportable, the following step:, musibY followedf within the indicated time frames:

Entire Page Revised O

QA QAM Paga 2 Procedure QA-121 Revision 5 O

2.2.1 The individual detecting "he item or event shall cause a Nonconforming item (NCl) to be generated if this has not already been done. The initiation of the NCl estab11shes

" Time Zero".

2.2.2 Within five (5) calendar days, the Corporate QA Manager should be notified of any potentially reportable items by the in-dividual assigned responsibility for evaluation of the NCl.

Notification should be accomplished by completing the " state-ment of problem" section of Form 290.1 and sending it to the Corporate QA Manager with copies to the cognizant QA manager.

2.2.3 Upon receipt of the Form 290.(, the Corporate QA Manager shall review the information provided and with reference to the applicable regulations, use the technical expertise at his disposal to evaluate the problem for reportability and document his evaluation in the space provided.

2.2.3.1 If evaluated as not recortable, the Corporate QA Manager shall sign the form and return a copy to the originator.

~

2.2 3.2 If evaluated as reportable, the Corporate QA Manager shall, witten-24 hours of comoletion of the evalu-O tie . exe - '#iti i teiease e reaert te t*e a c-lear Regulatory Commission, Region 11. This tele- l phone report shall give brief description of the item or event and a summary of any corrective action taken or to be taken. A copy of the completed 290.1 shall be returned to the originator. The determina-tion of reportability must be made by the Corporate QA Manager. This cannot be delegated. Once the 290.1 has been signed by the Corporate QA l Manager, the telephone report can be made by anyone designated by the Corporate QA Manager. The QA Manager, Technical Services, is hereby delegated to make these calls. Others may be delegated by the Corporate QA Manager to make these calls.

2.2.3.3 in any case, within thirty (30) calendar days of l

- " Time Zero", a decision must be made on reportability or the deficiency must be reported to the NRC as a Potentially Reportable item. This telephone report must be made no later than the thirty-first day by the Corporate QA Manager or individual designated by l the Corporate QA Manager. Form 290.1 will be used to record NRC contact for potentially reportable and reportable items. This form will be serialized and distributed by QA Manager, Technical Services. Po-tentially Reportable items which are later determined not reportable may be cancelled by a telephone call ,

to NRC.

. QA QAM Paga 3 Proccdura QA-121 Ravision 3 O

u 2.2.3.4 For reportable items, tha Corporate QA Manager shell have a written report prepared and sent to the Nuclear Regulatory Cownission within thirty (30) days for 10CFR50.55(e) or five (5) days for 10CFR21 of reporting the item to the NRC In accord nce with the regulations. The report shall contain Informa-tion required by 10CFR21, Paragraph 21.21(3) even though the repcrt is made as a 50.55(e) event.

Official correspondence and reports to the Nuclear )

Regulatory Commission shall be ser.t through the  :

L* censing Group.

2.3 NCis Generated At A Plant Unit with An Operating License For the above NCis which are assigned to Quality Assurance for resolution, review and handling of potentially reportable items shall be handled the same as described in section 2.2 with the following exceptions:

1) All phone contacts with the NRC will be made Jointly by the Steam Production Department and QA Manager, Technical Services after receipt of Form 290.1 which will be serialized by the QA Manager, Technical Services.
2) The written report on reportable items will be prepared and sub-r.iltted by the Steam Production Department in lieu of the Cor-porate QA Manager. p_

The notice shown in Enclosure 6.1- to this procedure shall be posted in a conspicuous position on any premise activities subject to the regulation are conducted. In addition, the following must be available for any per-son desiring to see them, and the posted notice shall say where they are available.

3.1 The regulation in 10CFR Part 21.

3.2 The procedure adopted pursuant to the regulation in 10CFR21 (i.e.,

this procedure).

4.0 RECORDS 4.1 Reports received by the Corporate QA Manager shall be serialized by project name, year, and sequential number. Records indicating the disposition of each potentially reportable item and of each reported item will be maintained by the Corporate QA Manager.

5.0 FORMS 5.1 290.1 6.0 ENCLOSURES 6.1 Posted Notice 6.2 Flow Chart for 50.55(e) reportability 6.3 Flow Chart for Part 21 reportability

. ~

Procedure QA-121

=-

ENERGY REORGANIZATION ACT OF 1974 Act of October 11, 1974 (Public Law 93-438)

[isur.6.i p ..,..

Section 206 NONCOMPLIANCE  !

(a) Any individual director, or responsible officer o'f a firm construct-ing, owning, operating, or supplying the components of any facility or activity which is licensed or otherwise regulated pursuant to the Atomic Energy Act of 1954 as amended, or pursuant to this Act, who obtains information reasonably indicating that such facility or activity or basic components supplied to such facility or activity--

(1) fails to comply with the Atomic Energy Act of 1954 as amended, or any applicable rule, regulation, order, or license of the Comission relating to substantial safety hazards, or (2) contains a defect which would create a substantial safety hazard, as defined by regulations which the Comission shall promulgate.

shall imediately notify the Comission of such failure to comply, or of such defect, unless such person has actual knowledge that the Commission has been adequately informed of such defect or failure to comply.

~

(b) Any person who knowing'ly and consciously fails to provide the notice required by subsection (a) of this section shall be subject to a civil penalty O in an amount equal to the amount provided by section 234 of the Atomic Energy Act of 1954, as amended.

(c) The requirements of this Nction shall be prominently posted on the premises of any facility licensed or otherwise regulated pursuant to the Atomic Energy Comission Act of 1954, as amended.

(d) The comission is authorized to conduct such reasonable inspections and other enforcement activities as needed to insure compliance with the pro-visions of this section.

Regulations establishing procedures and requirements for the implementation of Section 206 of the Energy Reorganization Act of 1974 have been promulgated by the Nuclear Regulatory Comission in Title 10 Code of Federal Regulations.

Part 21 - Reporting of Defects and Noncompliance. Pursuant to 10CFR Part 21, implementing procedures for ,

have been established as follows:

A copy of 10CFR Part 21 and the above listed procedures may be examined and reports of defects and noncompliance may be made by contacting:

at .

) ........................................

Form 290.1 Devision 3 20155 108-82)

POTENTIALLY REPORTA8LE ITEM QA Serial No.

Source Document (s)

Station / Project Serial No. (Optional) .

VN No. l

, NCINo. Unit 1 DNC No.

Other Date identified:

Statement of Problem

~

3 8

E Ei H

Z w-2 "w

Date:

, By:

OVP O Corporate CA Manager cc:

OSRAL Olvision Head O Orn.c Evaluation:

i Z

I 9

E,.

l Applicable To: 050.55(e) OPart 21 O Botn

Conclusion:

Reoortable O Yes O No

  • ' Potentfally Recortable (Evaluation incomplete)O l Date:

Evaluated By:

l

' Potentially Reportable item Later Determined Not Reportable OCances Date; Evaluated By:

Cancellation Made To:

^

H Initial Telecon Report Made To: Formal Report Que:

(Ostel tj N l Z Assigned To: By:

o By:

Submit Report To: Date:

M Oste:

t Z

l

{_ _ - - . . __.__ __. _ _ _ - _ _ . _ _ _ _ _ _ ,

Procedura QA-121

, Enclosure 6.2 Revision 2 FLOW CHART FOR REPORTABILITY OF ITEMS / EVENTS UNDER 10CFR50.55(e)

Problem . TIME Identified O day-NCINN/DNC is wrliten & clock starts and possibly represents e a a a e Breakdown Deficiency Deficienc/ Deviation 5 calender days rneximum to report in in in from M problem lo menagement OA Program O' rinat Design " Construction " Performance Specs SS(e)(I)(1) 55(e) (t) (ii) , 55(e) (1) (iii) 55(e)(t)(iv)

! 5 .,

1r 5 days* -

and Evoluelion by Division Head.

i' is i t At any 6 W M 30 days Ne problem is deemed reportable,

'-- the NRC must be notNied within and il notcorrected >',- 24 hrs. N efter 30 calender days

  • ' lurther evolustion is needed, the W uM adversely NRC must be nopfied within 24 hrs.

1P 55e) 30 days-Evaluation Not Complete  ! 24 .h_r_s.

I 1P neporI to NRC 30 days to propere formel report 31 days 50.55(e) for NRC. N during this period e

]

30 ym '

l f "PolenNor is evolueled as "Not Reportable *, e ce4 to NRC concels g 5 e) l

  • u Pi "' '*P 'i' " 9'*t H**'

I '

i i j i  ;

O O

o

Procedura QA-121 FLOW CHART Enclosure 6.3 Repor1 ability Linder 10CFR-PT-21 Revision 3 Defect identified in M occepted basic couponent 0 days design or service _

NCWMDNC le written & clock starts I

and could aflect 5 colonder days marknum to report

> problem to management.

Capability to pg g, Integrity of shutdown reactor Reactor Cootant Doundary or and rnalntain in or F occiden 1f 213 shutdown condition 213 ~

=

213 Sp I Evoluellon by Divlelon Head, and woro it not correctal k .

M enyWrne during thle 30 deys tie problem le deemed reportable, l

5 the NRC muel be notNied within 24 hrs. N eller 30 casender days lurthat eyeluellon le needed. the Evaluation shown NRC must be noillied within 24 hre.

detoct could have of a *Polonnel Wetable item".

Evaluation Not Complete or created a substantial safety hazard 213 (Ic) 1f 30 dad Report to NRC 31 (Tolocord -

5 days Ic propero formal esport to NIE N durbg this period a

> "I%4entist"le evolueled se "Not

", a coil to NRC concele 5 day Formal Report 21.21 (b) M 1r 36 days-

~

O _

O O