MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20217J6401999-10-0606 October 1999 Revised Pages to McGuire Nuclear Station Selected Licensee Commitments Manual ML20212E7851999-09-16016 September 1999 Proposed Tech Specs Pages,Modifying Surveillance Requirements 3.8.4.8,3.8.4.9 & 3.8.4.8 Bases to Allow Testing of DC Channel Batteries with Units on Line ML20216E6601999-09-13013 September 1999 Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable ML20211G6711999-08-27027 August 1999 Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210R0131999-08-10010 August 1999 Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage ML20210N3151999-08-0404 August 1999 Proposed Tech Specs Changing TSs 3.3.2, ESFAS Instrumentation, 3.3.3, Post Accident Monitoring Instrumentation, 3.4.14, RCS Loops - Test & 5.3, Unit Staff Qualifications ML20210N9641999-07-26026 July 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20211C3731999-07-26026 July 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual & List of Effective Pages ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20210A5911999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20216D4061999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitment Manual, List of Effective Pages ML20195F2941999-06-10010 June 1999 Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20212A2701999-05-28028 May 1999 Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valves Inservice Testing Program ML20211C3751999-05-19019 May 1999 5 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program. Page 1 of 15 in Section 4.1 of Incoming Submittal Not Included ML20195B4181999-05-18018 May 1999 Revised Pages to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206T0571999-05-0505 May 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual. with List of Effective Pages ML20206Q9311999-05-0404 May 1999 Rev 29 to List of Effective Pages for Chapter 16 & Page 16.11-66 to McGuire Selected Licensee Commitment Manual. with ML20206S9401999-04-30030 April 1999 Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. with List of Effective Pages ML20206K3621999-04-30030 April 1999 Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual ML20206J4531999-04-22022 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206Q8741999-04-22022 April 1999 Revs to CNS Selected Licensee Commitments Manual,Including Page 5 of List of Effective Pages & Pages 1-11 to Chapter 16.9-13.With ML20206B1271999-04-15015 April 1999 CNS Selected Licensee Commitments Manual, List of Effective Pages ML20206C0391999-04-15015 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206B0761999-04-0606 April 1999 Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 ML20205L2251999-04-0505 April 1999 Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements ML20205L2431999-04-0505 April 1999 SFP Soluble Boron Credit Dilution Analysis (Summary of Applicable Portions) ML20205L2531999-04-0505 April 1999 Boraflex Degradation Analysis ML20205C6901999-03-25025 March 1999 Proposed TS Facilitating Treatment of RTS Instrumentation, ESFAS Instrumentation,Lop DG Start Instrumentation,Cp & Exhaust Isolation Instrumentation & LTOP PORV TS Trip Setpoints as Nominal Values ML20205B6231999-03-23023 March 1999 Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal ML20204F6761999-03-18018 March 1999 Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals ML20204G2541999-03-16016 March 1999 Revised Pages to Catawba Nuclear Station Licensee Commitments Manual ML20204E5281999-03-15015 March 1999 Proposed Tech Specs Deleting TS for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation & Adding Note to TS for Cravs Re Chlorine Protection Function ML20204F6931999-03-11011 March 1999 Proposed Tech Specs 3.3.7 & 3.3.8 Re CR Area Ventilation Sys & Auxiliary Bldg Filtered Ventilation,Exhaust Sys Actuation Instrumentation ML20205B1341999-03-11011 March 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20204E7271999-03-0808 March 1999 Chapter 16.5-2,page 1-3 to CNS Selected Licensee Commitments Manual. with List of Effective Pages ML20207C6921999-02-22022 February 1999 Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20203A3331999-01-28028 January 1999 Proposed Tech Specs Modifying Flowrate Specified for SR 3.7.13.4 from Value Representative of One Filter Unit/Fan to Value Representative of Entire Fhves Train ML20199H4061999-01-16016 January 1999 Revised CNS Selected Licensee Commitments Manual ML20198A4691998-12-0909 December 1998 Rev 14 to DPC McGuire Nuclear Station Process Control Program ML20198B9671998-12-0909 December 1998 Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable ML20197G8991998-12-0707 December 1998 Proposed ITS 3.8.3,modifying Inventory Requirements for DG Lube Oil Sys ML20196G6891998-11-23023 November 1998 Rev 26 to Selected Licensee Commitments (SLC) Manual ML20196C9211998-11-14014 November 1998 Rev 26 to Selected Licensee Commitments Manual. with Update Instructions ML20195D6481998-11-11011 November 1998 Proposed Tech Specs,Modifying Details of SRs 3.6.11.6 & 3.6.11.7 to Be Consistent with Design of Containment Pressure Control Sys at Plant ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y1821998-09-15015 September 1998 Proposed Improved TSs Providing Changes Necessary to Resolve Items Identified by Util During Review 1999-09-16
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217J6401999-10-0606 October 1999 Revised Pages to McGuire Nuclear Station Selected Licensee Commitments Manual ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20211C3731999-07-26026 July 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual & List of Effective Pages ML20210N9641999-07-26026 July 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20216D4061999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitment Manual, List of Effective Pages ML20210A5911999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20212A2701999-05-28028 May 1999 Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valves Inservice Testing Program ML20211C3751999-05-19019 May 1999 5 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program. Page 1 of 15 in Section 4.1 of Incoming Submittal Not Included ML20195B4181999-05-18018 May 1999 Revised Pages to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206T0571999-05-0505 May 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual. with List of Effective Pages ML20206Q9311999-05-0404 May 1999 Rev 29 to List of Effective Pages for Chapter 16 & Page 16.11-66 to McGuire Selected Licensee Commitment Manual. with ML20206K3621999-04-30030 April 1999 Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual ML20206S9401999-04-30030 April 1999 Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. with List of Effective Pages ML20206Q8741999-04-22022 April 1999 Revs to CNS Selected Licensee Commitments Manual,Including Page 5 of List of Effective Pages & Pages 1-11 to Chapter 16.9-13.With ML20206J4531999-04-22022 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206C0391999-04-15015 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206B1271999-04-15015 April 1999 CNS Selected Licensee Commitments Manual, List of Effective Pages ML20204G2541999-03-16016 March 1999 Revised Pages to Catawba Nuclear Station Licensee Commitments Manual ML20205B1341999-03-11011 March 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20204E7271999-03-0808 March 1999 Chapter 16.5-2,page 1-3 to CNS Selected Licensee Commitments Manual. with List of Effective Pages ML20199H4061999-01-16016 January 1999 Revised CNS Selected Licensee Commitments Manual ML20198A4691998-12-0909 December 1998 Rev 14 to DPC McGuire Nuclear Station Process Control Program ML20196G6891998-11-23023 November 1998 Rev 26 to Selected Licensee Commitments (SLC) Manual ML20196C9211998-11-14014 November 1998 Rev 26 to Selected Licensee Commitments Manual. with Update Instructions ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Z7751998-09-0808 September 1998 Rev 25 to McGuire Selected Licensee Commitment Manual, Consisting of Revised Pages 16.7-9 & 16.7-10 ML20236P8671998-07-0606 July 1998 Updated Pages to Catawba Nuclear Station Selected License Commitments Manual ML20249B6221998-06-11011 June 1998 Revised Table of Contents for Chapter 16 of Selected License Commitments Manual ML20249C2081998-06-0909 June 1998 Rev 24 to Selected License Commitments (SLC) Manual & SLC 16.10.1,dtd June 1998 ML20247Q9871998-05-11011 May 1998 Revised Chapter 16 to Selected License Commitment Manual ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20203J9391998-02-19019 February 1998 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20203E1911997-12-0101 December 1997 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20216A8691997-09-0101 September 1997 Rev 0 to QAM-2.0, Order Entry ML20141F1521997-06-25025 June 1997 Rev 4 to Nuclear Security Training & Qualification Plan ML20141D2721997-05-29029 May 1997 Chapter 16.8 to Electrical Power Sys, Chapter 16.10.1 to Steam Vent to Atmosphere & Revised Table of Contents ML20140D1361997-05-27027 May 1997 Rev 21 to McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20148G0251997-05-13013 May 1997 Revised Pages to Selected License Commitments Manual, Chapters 16.10.1 & 16.10.2 Re Steam Vent to Atmosphere & Condenser Circulating Water Sys,Respectively ML20148D5041997-05-0909 May 1997 Rev 19 to Selected Licensee Commitment Manual 16.5-4 ML20141B1371997-04-30030 April 1997 Chapter 16 to Table of Contents & Chapter 16.10.1 to Steam & Power Conversion Sys of Selected License Commitment Manual ML20137Q8351997-03-31031 March 1997 Revised Selected Licensee Commitments Manual ML20135A8581997-01-15015 January 1997 Revised Selected License Commitment Manual ML20133F9041996-12-26026 December 1996 Selected Licensee Commitments Manual, Rev 18 ML20134F8651996-10-21021 October 1996 Rev to Selected Licensee Commitments Manual ML20117K2851996-08-22022 August 1996 Rev 16 to Selected Licensee Commitments Manual ML20117M5901996-08-15015 August 1996 Loss of Electrical Power ML20115C9971996-06-25025 June 1996 Revised McGuire Nuclear Station Selected Licensee Commitiments Manual ML20115E8871996-06-18018 June 1996 Revised Pages to Selected Licensee Commitments Manual ML20112B7651996-05-13013 May 1996 Rev to Selected Licensee Commitments Manual ML20111B7401996-05-0202 May 1996 Revised Selected License Commitment Manual, New Selected License Commitment 1999-08-18
[Table view] |
Text
. - .. _
.- )
l PROCEDURE QA-121 PAGE CS-1 l lHEV!SION 6
~ '
NUCLEAR REGULATORY COMMISSION REPORTING DUKE POWER COMPANY REQUIREMENTS QUALITY ASSURANCE DEPARTMENT
= -%
DATE /c 5/g t QUALITY ASSURANCE PROGRAM co eaare ouaur, any.ca ma=aen LIST oF PAGES VALID FoR THIS REVISloN*
PAGES REVISloN
- Page CS-1 6 Page 1 2 Page 2 5 Page 3 3
- Form 290.1 3 Enclosure 6.1 1 Enclosure 6.2 2 Enclosure 6.3 3
- Indicates pages affected by this revision.
s' 8401240302 840113 PDR ADOCK 05000369 S PDR
~.
QA qAM
' Paga L Pr:c: dura QA-121 'R:; vision 2
Title:
NUCLEAR REGULATORY COMMISSION REPORTING REQUIREMENTS
Purpose:
To establish the procedure for determining the reportability of and subsequent-reporting of significant items to the Nuclear Regulatory Commission (NRC) as required by the following regulations:
- a. 10CFR21
- b. 10CFR50, Section 50.55(e)
Scope:
This procedure applies to identified during the design, construction, and operation of a nuclear p ant which are required to be evaluated for reportability to the NRC.
Definitions:
Reportable items - Those significant items which have been evaluated pursuant to this procedure and the applicable regulations and are determined to be reportable to the Nuclear Regulatory Commission.
e_
Potentially Reportable items - Those items which are of such significance that a complete ana l ys i s may find them reportable.
- 1. RESPONSIBILITY 1.1 The Corporate Quality Assurance Manager is responsible for problem evaluation and initial reporting to the Nuclear Regulatory Commission.
(STEAM PRODUCTION WILL REPORT TO NRC ON OPERATING LICENSED UNITS.)
1.2 Persons detecting items or events which they believe to be reportable shall be responsible to see that such items are reported to management under the provisions of this procedure.
- 2. PROCEDURE 2.1 The attached flow charts outline items or events which are potentially reportable to the Nuclear Regulatory Commission in accordance with applicable regulations.
2.2 When a deficiency is identified that may be reportable, the following step:, musibY followedf within the indicated time frames:
Entire Page Revised O
QA QAM Paga 2 Procedure QA-121 Revision 5 O
2.2.1 The individual detecting "he item or event shall cause a Nonconforming item (NCl) to be generated if this has not already been done. The initiation of the NCl estab11shes
" Time Zero".
2.2.2 Within five (5) calendar days, the Corporate QA Manager should be notified of any potentially reportable items by the in-dividual assigned responsibility for evaluation of the NCl.
Notification should be accomplished by completing the " state-ment of problem" section of Form 290.1 and sending it to the Corporate QA Manager with copies to the cognizant QA manager.
2.2.3 Upon receipt of the Form 290.(, the Corporate QA Manager shall review the information provided and with reference to the applicable regulations, use the technical expertise at his disposal to evaluate the problem for reportability and document his evaluation in the space provided.
2.2.3.1 If evaluated as not recortable, the Corporate QA Manager shall sign the form and return a copy to the originator.
~
2.2 3.2 If evaluated as reportable, the Corporate QA Manager shall, witten-24 hours of comoletion of the evalu-O tie . exe - '#iti i teiease e reaert te t*e a c-lear Regulatory Commission, Region 11. This tele- l phone report shall give brief description of the item or event and a summary of any corrective action taken or to be taken. A copy of the completed 290.1 shall be returned to the originator. The determina-tion of reportability must be made by the Corporate QA Manager. This cannot be delegated. Once the 290.1 has been signed by the Corporate QA l Manager, the telephone report can be made by anyone designated by the Corporate QA Manager. The QA Manager, Technical Services, is hereby delegated to make these calls. Others may be delegated by the Corporate QA Manager to make these calls.
2.2.3.3 in any case, within thirty (30) calendar days of l
- " Time Zero", a decision must be made on reportability or the deficiency must be reported to the NRC as a Potentially Reportable item. This telephone report must be made no later than the thirty-first day by the Corporate QA Manager or individual designated by l the Corporate QA Manager. Form 290.1 will be used to record NRC contact for potentially reportable and reportable items. This form will be serialized and distributed by QA Manager, Technical Services. Po-tentially Reportable items which are later determined not reportable may be cancelled by a telephone call ,
to NRC.
. QA QAM Paga 3 Proccdura QA-121 Ravision 3 O
u 2.2.3.4 For reportable items, tha Corporate QA Manager shell have a written report prepared and sent to the Nuclear Regulatory Cownission within thirty (30) days for 10CFR50.55(e) or five (5) days for 10CFR21 of reporting the item to the NRC In accord nce with the regulations. The report shall contain Informa-tion required by 10CFR21, Paragraph 21.21(3) even though the repcrt is made as a 50.55(e) event.
Official correspondence and reports to the Nuclear )
Regulatory Commission shall be ser.t through the :
L* censing Group.
2.3 NCis Generated At A Plant Unit with An Operating License For the above NCis which are assigned to Quality Assurance for resolution, review and handling of potentially reportable items shall be handled the same as described in section 2.2 with the following exceptions:
- 1) All phone contacts with the NRC will be made Jointly by the Steam Production Department and QA Manager, Technical Services after receipt of Form 290.1 which will be serialized by the QA Manager, Technical Services.
- 2) The written report on reportable items will be prepared and sub-r.iltted by the Steam Production Department in lieu of the Cor-porate QA Manager. p_
The notice shown in Enclosure 6.1- to this procedure shall be posted in a conspicuous position on any premise activities subject to the regulation are conducted. In addition, the following must be available for any per-son desiring to see them, and the posted notice shall say where they are available.
3.1 The regulation in 10CFR Part 21.
3.2 The procedure adopted pursuant to the regulation in 10CFR21 (i.e.,
this procedure).
4.0 RECORDS 4.1 Reports received by the Corporate QA Manager shall be serialized by project name, year, and sequential number. Records indicating the disposition of each potentially reportable item and of each reported item will be maintained by the Corporate QA Manager.
5.0 FORMS 5.1 290.1 6.0 ENCLOSURES 6.1 Posted Notice 6.2 Flow Chart for 50.55(e) reportability 6.3 Flow Chart for Part 21 reportability
. ~
Procedure QA-121
=-
ENERGY REORGANIZATION ACT OF 1974 Act of October 11, 1974 (Public Law 93-438)
[isur.6.i p ..,..
Section 206 NONCOMPLIANCE !
(a) Any individual director, or responsible officer o'f a firm construct-ing, owning, operating, or supplying the components of any facility or activity which is licensed or otherwise regulated pursuant to the Atomic Energy Act of 1954 as amended, or pursuant to this Act, who obtains information reasonably indicating that such facility or activity or basic components supplied to such facility or activity--
(1) fails to comply with the Atomic Energy Act of 1954 as amended, or any applicable rule, regulation, order, or license of the Comission relating to substantial safety hazards, or (2) contains a defect which would create a substantial safety hazard, as defined by regulations which the Comission shall promulgate.
shall imediately notify the Comission of such failure to comply, or of such defect, unless such person has actual knowledge that the Commission has been adequately informed of such defect or failure to comply.
~
(b) Any person who knowing'ly and consciously fails to provide the notice required by subsection (a) of this section shall be subject to a civil penalty O in an amount equal to the amount provided by section 234 of the Atomic Energy Act of 1954, as amended.
(c) The requirements of this Nction shall be prominently posted on the premises of any facility licensed or otherwise regulated pursuant to the Atomic Energy Comission Act of 1954, as amended.
(d) The comission is authorized to conduct such reasonable inspections and other enforcement activities as needed to insure compliance with the pro-visions of this section.
Regulations establishing procedures and requirements for the implementation of Section 206 of the Energy Reorganization Act of 1974 have been promulgated by the Nuclear Regulatory Comission in Title 10 Code of Federal Regulations.
Part 21 - Reporting of Defects and Noncompliance. Pursuant to 10CFR Part 21, implementing procedures for ,
have been established as follows:
A copy of 10CFR Part 21 and the above listed procedures may be examined and reports of defects and noncompliance may be made by contacting:
at .
) ........................................
Form 290.1 Devision 3 20155 108-82)
POTENTIALLY REPORTA8LE ITEM QA Serial No.
Source Document (s)
Station / Project Serial No. (Optional) .
VN No. l
, NCINo. Unit 1 DNC No.
Other Date identified:
Statement of Problem
~
3 8
E Ei H
Z w-2 "w
Date:
, By:
OVP O Corporate CA Manager cc:
OSRAL Olvision Head O Orn.c Evaluation:
i Z
I 9
E,.
l Applicable To: 050.55(e) OPart 21 O Botn
Conclusion:
Reoortable O Yes O No
- ' Potentfally Recortable (Evaluation incomplete)O l Date:
Evaluated By:
l
' Potentially Reportable item Later Determined Not Reportable OCances Date; Evaluated By:
Cancellation Made To:
^
H Initial Telecon Report Made To: Formal Report Que:
(Ostel tj N l Z Assigned To: By:
o By:
Submit Report To: Date:
M Oste:
t Z
l
{_ _ - - . . __.__ __. _ _ _ - _ _ . _ _ _ _ _ _ ,
Procedura QA-121
, Enclosure 6.2 Revision 2 FLOW CHART FOR REPORTABILITY OF ITEMS / EVENTS UNDER 10CFR50.55(e)
Problem . TIME Identified O day-NCINN/DNC is wrliten & clock starts and possibly represents e a a a e Breakdown Deficiency Deficienc/ Deviation 5 calender days rneximum to report in in in from M problem lo menagement OA Program O' rinat Design " Construction " Performance Specs SS(e)(I)(1) 55(e) (t) (ii) , 55(e) (1) (iii) 55(e)(t)(iv)
! 5 .,
1r 5 days* -
and Evoluelion by Division Head.
i' is i t At any 6 W M 30 days Ne problem is deemed reportable,
'-- the NRC must be notNied within and il notcorrected >',- 24 hrs. N efter 30 calender days
- ' lurther evolustion is needed, the W uM adversely NRC must be nopfied within 24 hrs.
1P 55e) 30 days-Evaluation Not Complete ! 24 .h_r_s.
I 1P neporI to NRC 30 days to propere formel report 31 days 50.55(e) for NRC. N during this period e
]
30 ym '
l f "PolenNor is evolueled as "Not Reportable *, e ce4 to NRC concels g 5 e) l
- u Pi "' '*P 'i' " 9'*t H**'
I '
i i j i ;
O O
o
Procedura QA-121 FLOW CHART Enclosure 6.3 Repor1 ability Linder 10CFR-PT-21 Revision 3 Defect identified in M occepted basic couponent 0 days design or service _
NCWMDNC le written & clock starts I
and could aflect 5 colonder days marknum to report
> problem to management.
Capability to pg g, Integrity of shutdown reactor Reactor Cootant Doundary or and rnalntain in or F occiden 1f 213 shutdown condition 213 ~
=
213 Sp I Evoluellon by Divlelon Head, and woro it not correctal k .
M enyWrne during thle 30 deys tie problem le deemed reportable, l
5 the NRC muel be notNied within 24 hrs. N eller 30 casender days lurthat eyeluellon le needed. the Evaluation shown NRC must be noillied within 24 hre.
detoct could have of a *Polonnel Wetable item".
Evaluation Not Complete or created a substantial safety hazard 213 (Ic) 1f 30 dad Report to NRC 31 (Tolocord -
5 days Ic propero formal esport to NIE N durbg this period a
> "I%4entist"le evolueled se "Not
", a coil to NRC concele 5 day Formal Report 21.21 (b) M 1r 36 days-
~
O _
O O