ML20079J397

From kanterella
Jump to navigation Jump to search
Proposed Changes to Tech Spec Table 3.3-9 Re Measurement Range Changes to Remote Shutdown Monitoring Instrumentation
ML20079J397
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 12/23/1982
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20079J385 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.2, TASK-TM NUDOCS 8212280202
Download: ML20079J397 (1)


Text

s nom EI y

cm o

00 Q

TABLE 3.3-9 h

hm REMOTE SHUTDOWN MONITORING INSTRUMENTATION OU on ANEj MINIMUM vu mm ~

READOUT MEASUREMENT CHANNELS INSTRUMENT LOCATION RANGE OPERABLE G

! 1.

Wide Range Neutron Flux 0.1 cps-150%

1 l

ro 2.

Reactor Trip Breaker Cable Spreading OPEN-CLOSE

.1/ trip breaker Indication Room 3.

Reactor Coolant Cold Leg l

Temperature 2C43 212-705 F 1

W 4.

Pressurizer Pressure 2C43 0-1600 psia 1

x-Y 5.

Pressurizer Level 2C43 0-360 inches 1

6.

Steam Generator Pressure 2C43 0-1200 psig 1/ steam generator 7.

Steam Generator Level 2C43

-401 to +63.5 inches 1/ steam generator

s kn

,5

  • Wide Range Neutron Flux monitors are located in the instrumentation cabinets located in the Auxiliary Feedwater pump room.

-