Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079N492 + (04:01:06, 15 December 2024)
- 05000259/LER-1984-001, :on 840103,RHR Pump 1D Started W/O Receiving Automatic Signal or Manual Start Signal from Control Room. Caused by Laborers Performing Decontamination Work.Laborers Cautioned + (04:01:11, 15 December 2024)
- ML20079N471 + (04:01:12, 15 December 2024)
- ML20079N461 + (04:01:13, 15 December 2024)
- ML20079N467 + (04:01:13, 15 December 2024)
- ML20079N452 + (04:01:14, 15 December 2024)
- ML20079N456 + (04:01:14, 15 December 2024)
- ML20079N451 + (04:01:15, 15 December 2024)
- ML20079N447 + (04:01:16, 15 December 2024)
- ML20079N446 + (04:01:16, 15 December 2024)
- ML20079N442 + (04:01:17, 15 December 2024)
- 05000416/LER-1983-192-03, /03L-0:on 831223,first Shift Failed to Adequately Perform 12 H Channel Check of Tech Spec 4.3.7.1-1.7.Caused by Personnel Error.Daily Operating Log Being Revised + (04:01:24, 15 December 2024)
- ML20079N429 + (04:01:25, 15 December 2024)
- ML20079N427 + (04:01:25, 15 December 2024)
- ML20079N423 + (04:01:26, 15 December 2024)
- ML20079N421 + (04:01:27, 15 December 2024)
- ML20079N419 + (04:01:28, 15 December 2024)
- ML20079N416 + (04:01:28, 15 December 2024)
- ML20079N413 + (04:01:29, 15 December 2024)
- ML20079N412 + (04:01:30, 15 December 2024)
- ML20079N410 + (04:01:31, 15 December 2024)
- ML20079N411 + (04:01:31, 15 December 2024)
- ML20079N408 + (04:01:32, 15 December 2024)
- ML20079N404 + (04:01:33, 15 December 2024)
- ML20079N401 + (04:01:34, 15 December 2024)
- ML20079N397 + (04:01:37, 15 December 2024)
- ML20079N396 + (04:01:38, 15 December 2024)
- ML20079N395 + (04:01:39, 15 December 2024)
- 05000331/LER-1982-080-03, River Water Supply Sys Traveling Screen Wash Pump 1P-112B Found W/Discharge Head Below Tech Spec Requirement for Traveling Screen 1F-36B. Caused by Unaligned Pump & Motor.Pump/Motor Realigned + (04:01:45, 15 December 2024)
- ML20079N391 + (04:01:46, 15 December 2024)
- 05000331/LER-1982-080, Forwards Updated LER 82-080/03X-1 + (04:01:47, 15 December 2024)
- ML20079N388 + (04:01:47, 15 December 2024)
- ML20079N385 + (04:01:48, 15 December 2024)
- ML20079N380 + (04:01:49, 15 December 2024)
- ML20079N382 + (04:01:49, 15 December 2024)
- 05000316/LER-1983-081, Updated LER 83-081/03X-1:on 830822 & 25,during Normal Operation,Reactor Trips Occurred as Result of Failures of 120-volt Ac Vital Bus Inverter.Caused by Operating Temps Above Rated Design Temps.Forced Air Cooling Installed + (04:01:50, 15 December 2024)
- ML20079N379 + (04:01:50, 15 December 2024)
- ML20079N376 + (04:01:51, 15 December 2024)
- ML20079N375 + (04:01:52, 15 December 2024)
- ML20079N374 + (04:01:53, 15 December 2024)
- 05000316/LER-1983-052-03, During Normal Operation, Reactor Trip Occurred as Result of Failure in 120-volt Ac Vital Bus Inverter.Caused by Capacitor C-2 Failure Due to High Operating Temps.Capacitor & Fuse Replaced + (04:01:59, 15 December 2024)
- ML20079N372 + (04:02:01, 15 December 2024)
- ML20079N371 + (04:02:02, 15 December 2024)
- ML20079N370 + (04:02:02, 15 December 2024)
- ML20079N369 + (04:02:03, 15 December 2024)
- ML20079N365 + (04:02:03, 15 December 2024)
- ML20079N364 + (04:02:04, 15 December 2024)
- ML20079N363 + (04:02:05, 15 December 2024)
- ML20079N362 + (04:02:05, 15 December 2024)
- ML20079N360 + (04:02:06, 15 December 2024)
- ML20079N361 + (04:02:06, 15 December 2024)