_
' R5av50 tid Arizona Public Service Company P O e OA 2*666 + PHOENIX. ARl2CNA 85036 E3 JA.! 12 AM ii: 2^
.i January 11, 1984 zg;;; jy :
ANPP-28597-JAR /BSK U. S. Nuclear Regulatory Connaission "I
Region V Creekside Oaks Office Park ii 1450 Maria Lane - Suite 210
.j Walnut Creek, CA 94596-5368
- I a
Attention: Mr. John B.~ Martin Regional Administrator
- i
Subject:
Notice of Deviation
'l NRC's Special Construction Appraisal Inspection i
File: 844)19-026; D.4.33.2
Reference:
NRC's letter to Mr. T. G. Woods, Jr. from Mr. J. B. Martin, dated December 12, 1983 j
l i
Dear Sir:
This letter refers to the Construction Appraisal Inspection referenced above. Our response to the Notice of Deviation is enclosed in i
Attachment A.
l' Very truly yours,
(
C', C L
C.
Cle_t._
aA E. E. Van Brunt, Jr.
t APS Vice President, Nuclear ANPP Project Director t
l EEVB/BSK:ru
'i Attachment ec: See Page Two f
8401300225 840125 PDR ADOCK 05000528 e
._,~
s.
cc:
K. L. Turley i ;,-
T. G. Woods, Jr.
- i J. A. Roedel l
D. B. Fasnacht A. C. Rogers I
B. S. Kaplan
.1 W. E. Ide I
J. Vorees
'I J. R. Bynum D. D. Green II P. P. Klute A. C. Gehr i
1; W. J. Stubblefield j' j W. G. Bingham i
R. L. Patterson
- 1' R. W. Welcher H. Foster
- i D. R. Hawkinson j
L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self
- j j
D.'Canadv 1
j-i t
t
(
4 1
,f i.
t 7.m g,,,._
p 4__.,.,
,, __.._ _, _q_,_,.g,
., - -,,,.-w-,.7-99
f
[
.+.6 l
ATTACHMENT A y
NOTICE OF DEVEIATION j
l Arizona Public Service Company Docket No. 50-528 Palo Verde N clear Generating Station Construction Permit No. CPPR-141 u
1 Unit No. 1 EA 83-30 l
EA 83-130 As a result of the inspection conducted between September 6-16, 26-30, October 31, and N vember 1, 1983, and in accordance with the NRC o
Enforcement Policy, 10 CFR 2, Appendix C, the following deviation was identified:
FSAR Section 3.8.1.6.6, Structural and Miscellaneous Steel, states:
'I l
" Welding is done is accordance with AWS D1.1-72, Revision 1, 4
1973, Structural Welding Code. The acceptance criteria for l
visual inspection of welding is done in accordance with AWS
- l D1.72, Revision 1, 1973."
'l q
Contrary to this commitment, Appendix A, Visual Inspection 1
Criteria, for Structural Steel and Miscellaneous' Metal i
Welding to Meet Design Requirements, to Specification 1
13-CM-320, Erection of Structural and Miscellaneous Steel, permits acceptance of undercut, incomplete fusion (rollover or overlap), and underfilled weld craters in amounts or circumstances not allowed by AWS Code as described in NRC Inspection Report No. 50-528/83-34, pages VII-5 and 6.
RESPONSE TO NOTICE OF DEVIATION Corrective Steps Taken And Corrective Steps That Are Planned The structural and miscellaneous steel welding requirements as contained in Specification 13-CM-320 are being revised for clarification and ease l'
of interpretation by Field Change Requests (FCR) 72,146-C,71-023-C, and Specification Change Notice (SCN) 3568. Areas specifically addressed l ';
were weld undersize, oversize, and undercut; additionally, the changes covered both welding requirements and inspection accept / reject criteria.
lj An additional review is being performed to assure that all deviations to l
l AWS Dl.1 meet project design requirements.
'i The FSAR will be revised by SAR Change Notice 1123 which will incorporate the specific welding requirements currently contained in Specification 13-CM-320. The exceptions taken to AWS Dl.1-72, Revision 1, 1973, and the justification for the exceptions, will be incorporated into the FSAR. This change clarifies the licensing document to incorporate the flexibility permitted by the Code. The change also provides consistency between the implemented practice reflected in the construction specification, as allowed by the Code, and the licensing document.
~
.*.,J<.
ATTACHMENT A Page Two X
A re-review by Bechtel Engineering 1.o provide additional assurance of consistency between the licensing documents and the other currently implemented construction specificatons is currently being conducted and will be documented by the final report issued for Deficiency Evaluatioa 5
Report 83-72, scheduled for January 27, 1984.
Completion Of Corrective Steps:
A draft revision to FSAR Sections 3.8.1.6.6 and 3A.10 will be submitted for NRC review by March 31, 1984 and incorporated into amendment 13 to l
the FSAR.
.i 9
9 it
.s a
6 1:o i
if o
'I:;
if llu l
I i
4-
-+~
y y -
wp y
,y-e w
w-
-v,--
y v-
+- 4 wawas-<-v w
+
e,e---
.e--
-a--v-w ee
.-W w
g--
9.---- -- -
s--
i 1
i j
STATE OF ARIZONA )
) ss.
COUNTY OF MARICOPA)
't I, Edwin E. Van Brunt, Jr., represent that I am Vice President, i
Nuclear Projects of Arizona Public Service Company, that the foregoing 1
document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements
~'
made therein are true.
k 1
'i W
A3 t L.
RR,%
Edwin E. Van Brunt, Jr.
L
.i Sworn to before me this
//
day of b e w.4 M
- 1984*
f a
vbo(h4ac
'i
/NotaryPublic My Commission Expires:
1 vy em m m e e e n w e. =