Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000416/LER-1983-032, Forwards LER 83-032/03L-0 + (03:57:53, 15 December 2024)
- 05000259/LER-1983-005-03, /03L-0:on 830126,trouble Alarm Sounded for Control Bay Elevation 593 Fire Protection Panel 1-25-325,Zone 14. Caused by Power Loss to Some of 16 Smoke Detectors.Broken Nylon Insulating Screw Caused Detector to Short Circuit + (03:57:59, 15 December 2024)
- 05000316/LER-1983-124-03, /03L-0:on 831224,during Surveillance Test of Power Range Drawer,Control Power Fuse Blew.Cause Not Determined. Power Range Drawer Recalibr + (03:58:06, 15 December 2024)
- ML20079N989 + (03:58:08, 15 December 2024)
- B13956, Requests Relief from ASME Code Section XI Requirements Per 10CFR50.55(g)(6)(i),in Response to Generic Ltr 90-05 + (03:58:12, 15 December 2024)
- ML20079N981 + (03:58:12, 15 December 2024)
- B10702, Forwards Amend 1 to Environ Rept - OL Stage & Amend 1 to FSAR (Filed in PDR Category K) + (03:58:13, 15 December 2024)
- ML20079N967 + (03:58:13, 15 December 2024)
- ML20079N964 + (03:58:14, 15 December 2024)
- ML20079N961 + (03:58:14, 15 December 2024)
- ML20079N956 + (03:58:17, 15 December 2024)
- ML20079N954 + (03:58:18, 15 December 2024)
- ML20079N950 + (03:58:19, 15 December 2024)
- ML20079N947 + (03:58:19, 15 December 2024)
- 05000328/LER-1982-137-03, Four Upper Head Injection Switches Found Out of Tolerance & One Failed to Close.Caused by Instrument Drift & Broken Microswitch.Switch Repaired & Level Switches Adjusted.Pilot Valve Replaced + (03:58:21, 15 December 2024)
- B11003, Informs That Util QA-verified 831212 Reanalysis of Steam Generator Tube Rupture Event.Reported Results Remain Valid. Verification Completed Prior to Startup for Cycle 6 + (03:58:25, 15 December 2024)
- ML20079N936 + (03:58:25, 15 December 2024)
- ML20079N933 + (03:58:26, 15 December 2024)
- ML20079N932 + (03:58:27, 15 December 2024)
- ML20079N930 + (03:58:27, 15 December 2024)
- LD-83-017, Forwards Draft Mods to Sys 80 Fuel Design for CESSAR-F. Mods Include Completion of Seismic & LOCA Loading Analyses. Changes Will Be Formally Incorporated Into CESSAR-F in Next Amend + (03:58:28, 15 December 2024)
- ML20079N923 + (03:58:28, 15 December 2024)
- ML20079N916 + (03:58:29, 15 December 2024)
- ML20079N914 + (03:58:29, 15 December 2024)
- 05000328/LER-1982-137, Forwards Updated LER 82-137/03X-1 + (03:58:30, 15 December 2024)
- ML20079N908 + (03:58:30, 15 December 2024)
- ML20079N907 + (03:58:31, 15 December 2024)
- ML20079N898 + (03:58:31, 15 December 2024)
- ML20079N885 + (03:58:32, 15 December 2024)
- ML20079N895 + (03:58:32, 15 December 2024)
- ML20079N879 + (03:58:34, 15 December 2024)
- ML20079N874 + (03:58:35, 15 December 2024)
- ML20079N872 + (03:58:36, 15 December 2024)
- ML20079N870 + (03:58:37, 15 December 2024)
- ML20079N869 + (03:58:38, 15 December 2024)
- ML20079N868 + (03:58:38, 15 December 2024)
- ML20079N862 + (03:58:39, 15 December 2024)
- ML20079N858 + (03:58:40, 15 December 2024)
- ML20079N857 + (03:58:41, 15 December 2024)
- NLS8400040, Public Version of Rev 2 to Emergency Plan Implementing Procedure 5.7.2, General Emergency Implementing Procedure + (03:58:42, 15 December 2024)
- ML20079N856 + (03:58:42, 15 December 2024)
- ML20079N845 + (03:58:43, 15 December 2024)
- ML20079N852 + (03:58:43, 15 December 2024)
- ML20079N840 + (03:58:44, 15 December 2024)
- ML20079N837 + (03:58:45, 15 December 2024)
- ML20079N835 + (03:58:46, 15 December 2024)
- ML20079N832 + (03:58:46, 15 December 2024)
- ML20079N828 + (03:58:47, 15 December 2024)
- ML20079N827 + (03:58:48, 15 December 2024)
- ML20079N818 + (03:58:50, 15 December 2024)
- JAFP-83-0212, Forwards Effluent & Waste Disposal Semiannual Rept, Jul-Dec 1982 + (03:58:51, 15 December 2024)
- ML20079N812 + (03:58:52, 15 December 2024)