Interim Deficiency Rept Re Valves Not Torquing Out in Closed Position.Initially Reported on 780822.Valves Equipped W/Limitorque Size SMB-000 Operators.Caused by Improper Factory Adjustment.Limitorque Contacted for Commitment
ML20079N967
Person / Time
Site: Zimmer
Issue date: 12/05/1978
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: Hieshman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-1053, NUDOCS 8303040486
Download: ML20079N967 (2)


Text

..

mg7w emr-~

d THE CINCINNATI GAS & ELECTRIC COMPANY en N N c m e m san o m o.sroi C. A B O RG M APd N

" " " * ~

DESIGNATED ORIGINAL crt:21c3 Dygh. lxdn >

r V

December 5,1978 QA-1053

\\

1 l

U. S. Nuclear Regulatory Commission j

l Region III

{

l 799 Roosevelt Road j

Glen Ellyn, Illinois 60137 Attention:

Mr. R. F. Heishman, Chief Reactor Construction & Engineering Support Branch RE:

WM. H. ZIMMER NUCLEAR POWER STATION - UNIT I 10CFR50.55(e) J CONSTRUCTION PERMIT CPPR-88, DOCKET NO._50-358, W.0. *57300-957, JOB E-5590 Gentlemen:

Please accept this letter as an interim report concerning a 10CFR50.55(e) event which was reported to your office on August 22, 1978.

During operational testing of motor-operated valves, it was noted that certain valves would not torque out in the closed position.

To date, approximately 25 valves having this condition have been identified.

All are equipped with Limitorque size SMB,-000 operators.

We have determined, with the assistance of Limitorque service personnel, that readjustment of the Belleville springs in the torquing device resolves the problem.- We have concluded that these springs were improperly adjusted at the Limitorque factory.

We have contacted Limitorque for a corrective action commitment, and will D'C 11197B B303040486 781205 pm ADOCK 05000358 G

VW y} }

p:};; xy

.e-U. S!' Nuclear R:gulatory Comissicn ~

Region III-December 5.1978 ' -- QA-1053

'Page 2 supplement this' report upon receipt.

We trust that this letter' fulfills the repo ting requirements of 10CFR50.55(e).

Very truly yours.

THE CINCINNATI GAS &' ELECTRIC COMPANY

/W S, n

E. A. BORGMANN-Vice President, Engineering Services l