Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML091040011 + (17:25:58, 14 January 2025)
- LIC-09-0024, 2009-03-Post Exam Comments-Analysis + (17:25:59, 14 January 2025)
- ML091030741 + (17:25:59, 14 January 2025)
- ML091030682 + (17:26:00, 14 January 2025)
- ML091030679 + (17:26:01, 14 January 2025)
- ML091030664 + (17:26:03, 14 January 2025)
- LR-N09-0071, 2009 Annual Report - Guarantees of Payment of Deferred Premiums + (17:26:04, 14 January 2025)
- TAC:MD8703 + (17:26:05, 14 January 2025)
- ML091030655 + (17:26:05, 14 January 2025)
- ML091030639 + (17:26:10, 14 January 2025)
- ML091030629 + (17:26:10, 14 January 2025)
- ML091030612 + (17:26:11, 14 January 2025)
- ML091030601 + (17:26:12, 14 January 2025)
- ML091030550 + (17:26:12, 14 January 2025)
- ML091030544 + (17:26:13, 14 January 2025)
- RIS 2009-07, Status Update for Implementation of NRC Regulatory Authority for Certain Naturally Occurring and Accelerator-Produced Radioactive Material + (17:26:14, 14 January 2025)
- ML091030520 + (17:26:14, 14 January 2025)
- ML091030490 + (17:26:15, 14 January 2025)
- ML091030488 + (17:26:16, 14 January 2025)
- NRC 2009-0044, American Transmission Company - Interconnection System Impact Study Report, 106 MW Nuclear Generation Increase (53 MW Each at Point Beach Generators 1 and 2), Revision 3 + (17:26:17, 14 January 2025)
- ML091030469 + (17:26:18, 14 January 2025)
- ML091030465 + (17:26:18, 14 January 2025)
- ML091030459 + (17:26:19, 14 January 2025)
- ML091030458 + (17:26:19, 14 January 2025)
- ML091030446 + (17:26:20, 14 January 2025)
- RS-09-050, Requests for Relief for Alternate Examination Frequency - Attachments 1 Through 4 + (17:26:21, 14 January 2025)
- ML091030444 + (17:26:24, 14 January 2025)
- ML091030418 + (17:26:25, 14 January 2025)
- ML091030404 + (17:26:26, 14 January 2025)
- CP-200900492, License Amendment Request (LAR) 09-005, Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation + (17:26:27, 14 January 2025)
- ML091030378 + (17:26:28, 14 January 2025)
- ML091030364 + (17:26:40, 14 January 2025)
- IR 05000266/2009008 + (17:26:41, 14 January 2025)
- ML091030314 + (17:26:41, 14 January 2025)
- TAC:3019 + (17:26:42, 14 January 2025)
- ML091030296 + (17:26:43, 14 January 2025)
- ML091030246 + (17:26:44, 14 January 2025)
- ML091030243 + (17:26:45, 14 January 2025)
- ML091030221 + (17:26:45, 14 January 2025)
- 05000327/LER-2009-002, Regarding Lower Containment Gaseous Radiation Monitor Channel Inoperable, a Resultant of Leakage Detection Capabilities + (17:26:48, 14 January 2025)
- ML091030192 + (17:26:49, 14 January 2025)
- ML091030193 + (17:26:49, 14 January 2025)
- ML091030187 + (17:26:51, 14 January 2025)
- ML091030185 + (17:26:51, 14 January 2025)
- ML091030173 + (17:26:52, 14 January 2025)
- ML091030172 + (17:26:53, 14 January 2025)
- 3F0409-04, Attachment B Through E - Crystal River, Unit 3 - License Amendment Request 303, Revision 1, Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis + (17:26:54, 14 January 2025)
- ML091030167 + (17:27:00, 14 January 2025)
- TAC:MD9814 + (17:27:03, 14 January 2025)
- GO2-09-051, Initial License Written Examination Documentation + (17:27:05, 14 January 2025)
- ML091030165 + (17:27:05, 14 January 2025)