Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML103560867 + (05:55:52, 14 January 2025)
- ML103570012 + (05:55:52, 14 January 2025)
- IR 05000528/2010301 + (05:55:53, 14 January 2025)
- ML103560841 + (05:55:54, 14 January 2025)
- ML103560838 + (05:55:54, 14 January 2025)
- 3F1210-05, License Amendment Request 310, Revision 0, Departure from a Method of Evaluation for Auxiliary Building Overhead Crane and Revisions to Associated Commitments + (05:55:55, 14 January 2025)
- ML103560832 + (05:55:57, 14 January 2025)
- ML103560810 + (05:55:58, 14 January 2025)
- Press Release-10-224, NRC, Dept. of Energy and Nuclear Energy Institute Sponsor February Workshop on Extended Life for Nuclear Power Plants + (05:55:58, 14 January 2025)
- ML103560792 + (05:55:59, 14 January 2025)
- ML103560782 + (05:56:00, 14 January 2025)
- ML103560758 + (05:56:00, 14 January 2025)
- ML103560752 + (05:56:01, 14 January 2025)
- ML103560745 + (05:56:02, 14 January 2025)
- ML103560707 + (05:56:02, 14 January 2025)
- ML103560681 + (05:56:03, 14 January 2025)
- IR 05000249/2010010 + (05:56:27, 14 January 2025)
- RS-10-212, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate + (05:56:28, 14 January 2025)
- ML103560662 + (05:56:29, 14 January 2025)
- ML103560661 + (05:56:30, 14 January 2025)
- 05000373/LER-2010-003, Regarding Standby Liquid Control Test Tank Seismic Analysis + (05:56:34, 14 January 2025)
- ML103560656 + (05:56:35, 14 January 2025)
- L-10-339, Submittal of November 2010 NPDES Discharge Monitoring Report + (05:56:36, 14 January 2025)
- NL-10-136, Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval + (05:56:36, 14 January 2025)
- CP-201001545, Relief Request No. B-10 for the Unit 1 Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (05:56:37, 14 January 2025)
- CP-201001546, Relief Request No. B-11 for the Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (05:56:38, 14 January 2025)
- CP-201001544, Relief Request No. C-9 for the Second 10 Year Interval from 10 CFR 50.55a Inspection Requirements Due to Hardship (Second Interval Start Date: August 13, 2000) + (05:56:39, 14 January 2025)
- CP-201000890, Relief Request No. C-7 for the Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (05:56:39, 14 January 2025)
- CP-201000889, Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (05:56:40, 14 January 2025)
- ML103560592 + (05:56:41, 14 January 2025)
- Press Release-10-223, NRC Accepts Toshiba Application to Renew Certification for Advanced Boiling Water Reactor Design + (05:56:42, 14 January 2025)
- ML103560569 + (05:56:42, 14 January 2025)
- ML103560561 + (05:56:44, 14 January 2025)
- IR 05000324/2010010 + (05:56:45, 14 January 2025)
- Press Release-10-222, NRC Advisory Committee on Reactor Safeguards to Meet Jan 13-15 in Rockville, Md., Posts 2011 Schedule + (05:56:45, 14 January 2025)
- ML103560551 + (05:56:46, 14 January 2025)
- IR 07200039/2010001 + (05:56:47, 14 January 2025)
- ML103560548 + (05:56:47, 14 January 2025)
- ML103560531 + (05:56:48, 14 January 2025)
- L-2010-259, Extended Power Uprate Licensing Report, Attachment 5; Appendix G, WCAP-17197-NP, Revision 0, RCS Pressure and Temperature Limits and Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years + (05:56:49, 14 January 2025)
- ML103560456 + (05:56:51, 14 January 2025)
- ML103560453 + (05:57:13, 14 January 2025)
- ML103560452 + (05:57:14, 14 January 2025)
- ML103560451 + (05:57:23, 14 January 2025)
- ML103560450 + (05:57:24, 14 January 2025)
- ML103560449 + (05:57:28, 14 January 2025)
- ML103560448 + (05:57:29, 14 January 2025)
- ML103560443 + (05:57:29, 14 January 2025)
- ML103560442 + (05:57:30, 14 January 2025)
- ML103560441 + (05:57:31, 14 January 2025)
- ML103560435 + (05:57:31, 14 January 2025)