CCNPP3eRAIPEm Resource From: Arora, Surinder Sent: Wednesday, December 22, 2010 3:54 PM To: 'Poche, Robert'; 'cc3project@constellation.com' Cc: CCNPP3eRAIPEm Resource; Wheeler, Larry; Colaccino, Joseph; Hearn, Peter; Wilson, Anthony; Vrahoretis, Susan; Lee, Samuel

Subject:

Final RAI 283 SBPA 5285 Attachments: FINAL RAI 283 SBPA 5285.doc

Rob, Attached please find the subject request for additional information (RAI). The draft of this RAI was sent to you on December 15, 2010. In a phone call on December 20, 2010, you informed us that UniStar does not need a clarification phone call for this RAI and the RAI can be issued final.

The schedule we have established for review of your application assumes technically correct and complete responses within 30 days of receipt of RAIs. For any RAIs that cannot be answered within 30 days, it is expected that a schedule date for submitting your technically correct and complete response will be provided to the staff within the 30 day period so that the staff can assess how this information will impact the review schedule. However, due to the holidays and considering reduced resources during this time of the year, the response period for this specific request for additional information will be extended to 45 days.

Your response letter should also include a statement confirming that the response does or does not contain any sensitive or proprietary information.

Thanks.

SURINDER ARORA, PE PROJECT MANAGER, Office of New Reactors US Nuclear Regulatory Commission Phone: 301 4151421 FAX: 301 4156406 Email: Surinder.Arora@nrc.gov 1

Hearing Identifier: CalvertCliffs_Unit3Col_RAI Email Number: 67 Mail Envelope Properties (B46615B367D1144982B324704E3BCEED4510FAC172)

Subject:

Final RAI 283 SBPA 5285 Sent Date: 12/22/2010 3:54:11 PM Received Date: 12/22/2010 3:54:12 PM From: Arora, Surinder Created By: Surinder.Arora@nrc.gov Recipients:

"CCNPP3eRAIPEm Resource" <CCNPP3eRAIPEm.Resource@nrc.gov>

Tracking Status: None "Wheeler, Larry" <Larry.Wheeler@nrc.gov>

Tracking Status: None "Colaccino, Joseph" <Joseph.Colaccino@nrc.gov>

Tracking Status: None "Hearn, Peter" <Peter.Hearn@nrc.gov>

Tracking Status: None "Wilson, Anthony" <Anthony.Wilson@nrc.gov>

Tracking Status: None "Vrahoretis, Susan" <Susan.Vrahoretis@nrc.gov>

Tracking Status: None "Lee, Samuel" <Samuel.Lee@nrc.gov>

Tracking Status: None

"'Poche, Robert'" <Robert.Poche@constellation.com>

Tracking Status: None

"'cc3project@constellation.com'" <cc3project@constellation.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1298 12/22/2010 3:54:12 PM FINAL RAI 283 SBPA 5285.doc 29690 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Request for Additional Information No. 283 (eRAI 5285) 12/22/2010 Calvert Cliffs Unit 3 UniStar Docket No.52-016 SRP Section: 09.02.02 - Reactor Auxiliary Cooling Water Systems Application Section: 9.2.10 QUESTIONS for Balance of Plant Branch 1 (SBPA) 09.02.02-1 EPR RAI 375 Supplement 4 response for Q9.2.2-105 added Tier 2 FSAR Section 9.2.10, Turbine Building Closed Cooling Water System, which will be incorporated into Revision 3 of the EPR FSAR.

The COL applicant should address this new section in their COL application.