Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080N973 + (13:54:10, 14 December 2024)
- BSEP-83-3248, RO Re HPCI Sys,Reported on 830909.Condition Determined Not Reportable + (13:54:11, 14 December 2024)
- ML20080N962 + (13:54:13, 14 December 2024)
- RBG-17-006, Interim Deficiency Rept DR-160 Re Transformer Cable Lead Lugs Supplied by Gould Brown-Boveri.Investigation Continuing.Next Rept Will Be Provided by 840423 + (13:54:13, 14 December 2024)
- ML20080N949 + (13:54:14, 14 December 2024)
- 05000373/LER-1983-108-03, /03L-0:on 830901,during LOS-RH-Q3,RHR a Min Flow Bypass Valve 1E12-F064A Failed to Close.Caused by Broken Tripper Fingers Holding Motor Operator in Handwheel Operation.New Fingers Installed + (13:54:15, 14 December 2024)
- ML20080N945 + (13:54:16, 14 December 2024)
- ML20080N937 + (13:54:17, 14 December 2024)
- 05000397/LER-1984-003, :on 840120,during Initial Low Power Physics Testing,Intermediate Range Monitors A,B & D Did Not Respond to Increasing Neutron Flux,Causing Reactor to Be Shut Down. Caused by Personnel Error + (13:54:19, 14 December 2024)
- ML20080N931 + (13:54:20, 14 December 2024)
- ML20080N924 + (13:54:21, 14 December 2024)
- ML20080N927 + (13:54:21, 14 December 2024)
- ML20080N923 + (13:54:22, 14 December 2024)
- 05000373/LER-1983-107-03, /03L-0:on 830901,w/unit Shutdown for Planned Outage,Determined That Valve Leakage Rate Limits Exceeded.In All Cases at Least One Isolation Valve in Piping Line W/Acceptable Leakage Rate + (13:54:23, 14 December 2024)
- ML20080N910 + (13:54:24, 14 December 2024)
- ML20080N908 + (13:54:25, 14 December 2024)
- ML20080N902 + (13:54:26, 14 December 2024)
- ML20080N899 + (13:54:26, 14 December 2024)
- ML20080N897 + (13:54:27, 14 December 2024)
- ML20080N891 + (13:54:27, 14 December 2024)
- ML20080N890 + (13:54:28, 14 December 2024)
- ML20080N889 + (13:54:29, 14 December 2024)
- ML20080N888 + (13:54:29, 14 December 2024)
- ML20080N877 + (13:54:30, 14 December 2024)
- ML20080N872 + (13:54:30, 14 December 2024)
- ML20080N855 + (13:54:31, 14 December 2024)
- ML20080N840 + (13:54:32, 14 December 2024)
- ML20080N844 + (13:54:32, 14 December 2024)
- ML20080N839 + (13:54:33, 14 December 2024)
- ML20080N831 + (13:54:34, 14 December 2024)
- ML20080N830 + (13:54:34, 14 December 2024)
- ML20080N829 + (13:54:35, 14 December 2024)
- ML20080N819 + (13:54:35, 14 December 2024)
- 05000287/LER-1984-001, :on 840105,discovered 3TE Switchgear Load Shed Source B Fuse Block Not Installed.Cause Unknown.Fuse Block Reinstalled & Station Mod to Install Fuse Blocks & Add Computer Alarms Will Be Completed + (13:54:37, 14 December 2024)
- ML20080N815 + (13:54:38, 14 December 2024)
- ML20080N802 + (13:54:39, 14 December 2024)
- ML20080N812 + (13:54:39, 14 December 2024)
- ML20080N801 + (13:54:40, 14 December 2024)
- ML20080N799 + (13:54:41, 14 December 2024)
- 05000416/LER-1983-134-03, /03L-0:on 830829,output of RPS Reactor Water Level Channel B Loop Discovered Out of Tolerance.Caused by Instrument Drift.Instrument Loop Recalibr + (13:54:43, 14 December 2024)
- ML20080N779 + (13:54:44, 14 December 2024)
- ML20080N774 + (13:54:44, 14 December 2024)
- 05000327/LER-1983-113-03, /03L-0:on 830901,steam Generator Blowdown Effluent Line Radiation Monitor (1-RM-90-120/121) Declared Inoperable.Caused by Loss of Effluent Flow During Steam Generator Flushing Process + (13:54:48, 14 December 2024)
- 05000324/LER-1983-084-03, /03L-0:on 830902,rod Worth Minimizer Went to Control Rod Group 4 While Last Two Control Rods of Group 3 Still Fully Inserted.Cause to Be Determined During Future Reactor Startup + (13:54:50, 14 December 2024)
- RBG-16-030, Interim Deficiency Rept DR-125.Investigation Not Completed. Interim or Final Status Rept Will Be Provided by 831109 + (13:54:51, 14 December 2024)
- ML20080N748 + (13:54:55, 14 December 2024)
- 05000302/LER-1984-001, :on 840113,during Refueling Outage,End Cap in Reactor Containment Bldg Incorrectly Cut Off.Caused by Personnel Failing to Follow Engineering Procedures. Engineering Evaluation to Be Performed + (13:54:57, 14 December 2024)
- ML20080N742 + (13:55:04, 14 December 2024)
- ML20080N743 + (13:55:04, 14 December 2024)
- ML20080N741 + (13:55:05, 14 December 2024)
- ML20080N739 + (13:55:06, 14 December 2024)