Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20081K691 + (12:44:46, 14 December 2024)
- ML20081K680 + (12:44:46, 14 December 2024)
- ML20081K672 + (12:44:47, 14 December 2024)
- ML20081K669 + (12:44:48, 14 December 2024)
- B15157, Responds to NRC Re Deviation & Violation Noted in Insp Repts 50-336/95-03 & 50-423/95-03 Respectively. Corrective Actions:Calculation 188E Will Be Revised,Station MP SP3712NB Being Revised & FSAR Will Be Revised + (12:44:49, 14 December 2024)
- ML20081K653 + (12:44:49, 14 December 2024)
- ML20081K649 + (12:44:50, 14 December 2024)
- ML20081K647 + (12:44:51, 14 December 2024)
- ML20081K642 + (12:44:51, 14 December 2024)
- ML20081K629 + (12:44:52, 14 December 2024)
- ML20081K636 + (12:44:52, 14 December 2024)
- ML20081K623 + (12:44:53, 14 December 2024)
- ML20081K618 + (12:44:53, 14 December 2024)
- ML20081K608 + (12:44:54, 14 December 2024)
- ML20081K610 + (12:44:54, 14 December 2024)
- 05000336/LER-1995-008, :on 950221,determined That Vital DC Switchgear Rooms Vital Chillers Could Fail During Periods of Low SW Temp.Caused by Inadequate Design.Isolated Flow Control Valves & Using Bypass Valves to Control Flow + (12:44:56, 14 December 2024)
- ML20081K601 + (12:44:57, 14 December 2024)
- ML20081K594 + (12:44:58, 14 December 2024)
- TXX-4071, Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Station Procedure EGT-706 Will Be Revised to Include Checking Indications of Breaker Operability + (12:44:58, 14 December 2024)
- PY-CEI-NRR-1926, Forwards Response to Followup RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers + (12:44:59, 14 December 2024)
- ML20081K582 + (12:45:00, 14 December 2024)
- ML20081K581 + (12:45:00, 14 December 2024)
- ML20081K579 + (12:45:01, 14 December 2024)
- ML20081K572 + (12:45:02, 14 December 2024)
- ML20081K555 + (12:45:03, 14 December 2024)
- 05000361/LER-1983-131-03, /03L-0:on 831001,DNBR Margin Noted Not within Tech Spec Limits.Caused by Inherent Conservatism in Procedure SO23-3-3.b Causing DNBR to Be Outside Limits During Small Power Changes.No Corrective Actions Planned + (12:45:05, 14 December 2024)
- ML20081K549 + (12:45:06, 14 December 2024)
- ML20081K544 + (12:45:07, 14 December 2024)
- ML20081K542 + (12:45:08, 14 December 2024)
- ML20081K533 + (12:45:09, 14 December 2024)
- ML20081K539 + (12:45:09, 14 December 2024)
- 05000275/LER-1983-014, Updated LER 83-014/01T-1:on 830526,torque Switch Binding Observed During Maint on Limitorque Operator.Caused by Excessive Size of Mounting Screw Heads.Screws Replaced + (12:45:10, 14 December 2024)
- ML20081K530 + (12:45:11, 14 December 2024)
- 05000362/LER-1983-084-03, /03L-0:on 830928,during Monthly Surveillance, Auxiliary Feedwater Flow Rate Channel Declared Inoperable. Caused by Indication 3FI-4720-2 Out of Calibr Due to Instrument Drift.Indicator Recalibr + (12:45:12, 14 December 2024)
- ML20081K526 + (12:45:14, 14 December 2024)
- ML20081K520 + (12:45:15, 14 December 2024)
- ML20081K523 + (12:45:15, 14 December 2024)
- B10945, Forwards Response to 831007 Request for Addl Info.Remaining Responses Will Be Submitted by 831130.Responses & Associated Revised FSAR & Environ Rept Pages Will Appear in Amend 6 of Both Documents + (12:45:16, 14 December 2024)
- ML20081K513 + (12:45:18, 14 December 2024)
- ML20081K517 + (12:45:18, 14 December 2024)
- ML20081K504 + (12:45:20, 14 December 2024)
- ML20081K508 + (12:45:20, 14 December 2024)
- 3F0395-22, Forwards Rev 6-6 to Physical Security Plan.Encl Withheld + (12:45:21, 14 December 2024)
- ML20081K496 + (12:45:22, 14 December 2024)
- ML20081K495 + (12:45:22, 14 December 2024)
- ML20081K491 + (12:45:23, 14 December 2024)
- ML20081K484 + (12:45:24, 14 December 2024)
- 05000382/LER-1991-010-01, :on 910526,automatic Reactor Trip Occurred Due to Plant Protection Sys Actuation During Annunciator Ground Isolation.Annunciator Cabinets Caution Tagged + (12:45:26, 14 December 2024)
- 05000361/LER-1983-125-01, During Reactor Trip Breaker Surveillance,Breakers 4,5 & 6 Demonstrated Anomalous Behavior When Undervoltage Devices Tested.Cause Under Investigation + (12:45:28, 14 December 2024)
- 3F0395-10, Responds to NRC Re Violations Noted in Insp Rept 50-302/95-02.Corrective Actions:Performance of Surveillance to Ensure That All Channels in Tolerance & Systems Engineering Supervisor Counselled Responsible Engineer + (12:45:29, 14 December 2024)
- L-91-173, Forwards Rev 31 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) + (12:45:30, 14 December 2024)