Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083K530 + (10:36:42, 14 December 2024)
- 05000333/LER-1978-112, Forwards LER 78-112/03L-0 + (10:36:43, 14 December 2024)
- ML20083K525 + (10:36:43, 14 December 2024)
- ML20083K522 + (10:36:46, 14 December 2024)
- 05000368/LER-1978-026-03, /03L-0 on 781216:during Normal Testing 2CV-1039-2 Failed to Operate from Control Room,Rendering Emergency Feedwater Pump 2P7A Inoperable.Failure Located in Solid State Relay Actuating 2CV-1039-2 + (10:36:47, 14 December 2024)
- 05000321/LER-1979-001-03, /03L-0 on 790109:during Steady State Power at 2400 Mwt,Plant Personnel Inadvertently Opened Both Doors of Reactor Bldg 130-ft Airlock R106.For Reasons Unknown,Switch Which Allows Defeat of Interlock Was Operated + (10:36:49, 14 December 2024)
- ML20083K515 + (10:36:50, 14 December 2024)
- 05000368/LER-1978-025-03, /03L-0 on 781214:during Low Power Physics Testing, Ceac 1 Rendered Inoperable.Caused by Accidental Shorting of Leads to Common During Calibr of digitial-to-analog Converters in Core Protection Computer Channel B + (10:36:52, 14 December 2024)
- ML20083K509 + (10:36:53, 14 December 2024)
- ML20083K512 + (10:36:53, 14 December 2024)
- 05000321/LER-1979-001, Forwards LER 79-001/03L-0 + (10:36:54, 14 December 2024)
- 05000368/LER-1978-024-03, /03L-0 on 781214:barrel Test on Emergency Escape Hatch 2C4 & Personnel Hatch 2C2 Not Performed as Scheduled. Caused by Scheduling Error Due to Responsibility Change of Supervisors.Test Completed on 781215 + (10:36:55, 14 December 2024)
- ML20083K502 + (10:36:56, 14 December 2024)
- 05000368/LER-1978-024, Forwards LER 78-024/03L-0,78-025/03L-0 & 78-026/03L-0 + (10:36:57, 14 December 2024)
- ML20083K495 + (10:36:57, 14 December 2024)
- ML20083K486 + (10:36:58, 14 December 2024)
- ML20083K488 + (10:36:58, 14 December 2024)
- ML20083K484 + (10:36:59, 14 December 2024)
- TXX-2939, Forwards Revised Chapter 17.1 of Fsar,Amend 4 + (10:37:00, 14 December 2024)
- ML20083K477 + (10:37:00, 14 December 2024)
- ML20083K470 + (10:37:01, 14 December 2024)
- ML20083K476 + (10:37:01, 14 December 2024)
- ML20083K463 + (10:37:02, 14 December 2024)
- ML20083K448 + (10:37:03, 14 December 2024)
- ML20083K450 + (10:37:03, 14 December 2024)
- ML20083K443 + (10:37:04, 14 December 2024)
- ML20083K435 + (10:37:05, 14 December 2024)
- NG-84-1302, Responds to NRC Re Violations Noted in IE Insp Rept 50-331/84-02.Corrective Actions:Instrument Technician Informed of Gravity of Error in Test Procedures & Instructed to Exercise More Caution in Future + (10:37:05, 14 December 2024)
- ML20083K432 + (10:37:06, 14 December 2024)
- IR 05000324/1978032 + (10:37:07, 14 December 2024)
- ML20083K425 + (10:37:08, 14 December 2024)
- ML20083K419 + (10:37:09, 14 December 2024)
- ML20083K393 + (10:37:10, 14 December 2024)
- ML20083K409 + (10:37:10, 14 December 2024)
- ML20083K388 + (10:37:11, 14 December 2024)
- NLS8400101, Forwards Rev 2 to Emergency Plan & Rev 3 to Emergency Plan Implementing Procedure EPIP 5.7.21, Emergency Equipment Inventory + (10:37:11, 14 December 2024)
- ML20083K387 + (10:37:12, 14 December 2024)
- ML20083K376 + (10:37:12, 14 December 2024)
- IR 05000338/1978029 + (10:37:21, 14 December 2024)
- ML20083K373 + (10:37:22, 14 December 2024)
- ML20083K370 + (10:37:24, 14 December 2024)
- ML20083K368 + (10:37:24, 14 December 2024)
- PLA-2166, Part 21 Rept Re Failure of Crosby IMF-2 Solenoids Supplied by Ge.Initially Reported on 840403.Licensee & GE Jointly Developed Test Procedures to Bench Test Spares & Solenoids on Both Units.Testing Complete on Unit 1 + (10:37:25, 14 December 2024)
- ML20083K365 + (10:37:26, 14 December 2024)
- ML20083K361 + (10:37:27, 14 December 2024)
- ML20083K357 + (10:37:28, 14 December 2024)
- BSEP-95-0193, Requests Concurrence W/Change to CP&L re-inspection Schedule for Two 28-inch Reactor Recirculation Sys Suction piping-to-elbow Welds for BSEP Unit 1 + (10:37:29, 14 December 2024)
- ML20083K356 + (10:37:29, 14 December 2024)
- ML20083K347 + (10:37:30, 14 December 2024)
- ML20083K344 + (10:37:30, 14 December 2024)
- ML20083K342 + (10:37:31, 14 December 2024)