{{#Wiki_filter:-- .4 BALTIMORE GAS AND ELECTRIC CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 ' ARTHUR E. LUNDVALL,dR. Vice PntstotNT March 30,1984 SUPPLv U. S. Nuclear Regulatory Commission Region I _ _ 631 Park Avenue - . King of Prussia, PA 19406 - ATTENTION: ' Mr. Thomas E. Murley Regional Administrator
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No.1, Docket No.' 50-317 . Inspection of Threaded Fasteners in the Reactor Coolant Pressure Boundary of PWR Plants
REFERENCES:
_(a) lE Bulletin 82-02, " Degradation of Threaded Fasteners in the Reactor Coolant Pressure Boundary of PWR Plants". (b) - Letter to R. C. Haynes-from A.. E. Lundvall, Jr., dated July 30,1982. (c) Letter to R. C. DeYoung from A. E. Lundvall, Jr., dated ~ October 1,1982 ^ Gentlemen: IE. Bulletin 82-02 ' established requirements for -Implementation of -Maintenance ' Procedures, inspections and Reports of examination results concerning certain Reactor. Coolant Pressure. Boundary Threaded Fasteners. Threaded fasteners at Calvert Cliffs - which were addressed in the Bulletin included 'those in (1) Pressurizer and Steam Generator Primary Manway Closures, (2) Valve bonnets, and pump flange connections on lines,six inches or greater' nominal pipe size. Reference (c). stated our intent to implement the Regulatory Guide 1.65 exclusion allowance for reactor. vessel closure - studs contained in IE Bulletin 82-02. This letter's purpose is to complete Action item 4 of the.IE Bulletin 82-02 for those fasteners examined during Calvert Cliffs Unit 1 1983 - refueling outage. - As required by Action Item 1 Calvert Cliffs Administrative and Maintenance Procedures-have been reviewed and updated where necessary to insure training of proper bolting / stud practices, detensioning and retensioning practices and gasket installation and controls. 4 {W '~ O 7 . 1 _. _ P m m o b /y{
Mr. Thomas E. Murley March 30,1984 Page 2 Action Item 2 of Reference (a) requires that whenever those connections identified in the scope of the Bulletin are opened for inspection or maintenance the threaded fasteners shall be removed (unless " seized" or interference fit), cleaned, and inspected per IWA-2210 and IWA-2200 of ASME Code Section XI. The component connections examined per Action Item 2 for the Unit 1 Cycle 7 refueling outage included: 1) #11 and
- 12 steam generator primary manways; 2) nine safety injection check valve bearing covers (1-51-215,1-51-225,1-S1-235,1-SI-245,1-51-118,1-SI-128,1-51-138,1-SI-148, and 1-51-227).
The visual and surface examinations performed on the steam generator manway studs and the safety injection check valve bearing cover studs showed no signs of degradation. Complete descriptions of the examinations performed and the results are included in Enclosure (1). It is our understanding that this transmittal completes the required written response requested under all actions items associated with IEB 82-02. Should you have further questions regarding this report, please do not hesitate to contact us. Very truly yours (- est b ^-- , (' AEL/KMH/gla Enclosures cc:
- 3. A. Biddison, Esquire G. F. Trowbridge, Esquire D. H. Jaffe, NRC R. E. Architzel, NRC STATE OF MARYLAND :
TO WIT: CITY OF BALTIMORE : ~ Arthur E. Lundvall, Jr., being duly sworn states that he is Vice President of _ the LBaltimore Gas and Electric Company, a corporation of the State of Maryland; that he provides,the foregoing response for the purposes therein set forth; that the statements . made are true and correct to the best of his knowledge, informaticn, and belief; and that he was authorized to provide the response on behalf of said Corporation. m - WITNESS my Hand and Notarial Seali. ben 6 MM ( Notary < Public JMy Commission Expires: dt /, /9h (/ f
Mr. Thomas E. Murley - March 30,1983 Page 3 bec:
- 3. A. Tiernan R. M. Douglass L. B. Russell R. E. Denton R. C. L. Olson
. D. W. Latham S. M. Davis - M. 3.' Miernicki R. P. Sheranko
- 3. R. Lemons K. M. Hoffman
- K. M. Romney File 5 w m ',J n r / a m m
4 ENCLOSURE (1) REACTOR COOLANT PRESSURE BOUNDARY THREADED FASTENER EXAMINATION UNIT DATE COMPONENT Unit 1 October 1983 11 Steam Generator Manways Unit i October 1983 12 Steam Generator Manways TECHNICAL DATA Stud Dimensions: 1 1/2" - 8 UN x 101/2" Stud ~ Material: ASTM A-540 GR. B 24 CL. 3 Phosphate Coated Lubricant: Felpro N-5000 Gasket Material: .Flexitallic Type 304 SS and Asbestos,200 PPM Cl Maximum EXAMINATION PROCEDURES NDE 5.704 Rev. O Visual Examination of Nuclear Reactor Components NDE 5.100 Rev. 5 Magnetic Particle Examination of Ferromagnetic Boits or Studs EXAMINATION
SUMMARY
The 80 manway studs were removed for completion of the examinations. No indications of erosion or cracking were found. a
ENCLOSURE (1) REACTOR COOI. ANT PRESSURE BOUNDARY THREADED FASTENER EXAMINATION UNIT DATE COMPONENT Unit 1 November 1983 1-51-215; 12" Atwood & Morrill Swing Check Valve TECHNICAL DATA Bearing Cover Stud Dimensions: 7/8"- 9 UNC x 3"(Fully Threaded) Bearing Cover Stud Material. ASTM A-453 GR. 66 Chrome Plated Threads Lubricant Felpro N-5000 - Bearing Cover Gasket Materials. Flexitallic Type 304 SS and Asbestos,200 PPM Cl Maximum EXAMINATION PROCEDURES NDE 5.201 Rev. 3 Water washable liquid penetrant exa'mination of ferrous and nonferrous matsrlais NDE 5.701 Rev.4 Visual examination of valves -- EXAMINATION
SUMMARY
The. sixteen bearing cover studs were removed for the completion of the examinations. No indications of stud degradation viere found. y s 4 ) ,l$.
- /*
P x 4 l v 1-- J_. j ~, N _' o 4 ~ ", s. v ~. +) ' { 4 [II'7,
- g
, j _. e
- _y.
ENCLOSURE (1) REACTOR COOLANT PRESSURE BOUNDARY THREADED FASTENER EXAMINATION UNIT DATE COMPONENT Unit 1 October 1983 1-SI-225; 12" Atwood & Morrill Swing Check Valve TECHNICAL DATA Bearing Cover Stud Dimensions: 7/8"- 9 UNC x 3"(F ly Threaded) Bearing Cover Stud Material: ASTM A-453 GR. 6C Chrome Plated Threads Lubricant: Felpro N-5000 Bearing Cover Gasket Material: Flexitallic Type 304 SS and Asbestos,200 PPM Cl Maximum EXAMINATION PROCEDURES NDE 5.201 Rev. 3 Water washable liquid penetrant examination of ferrous and nonferrous materials NDE 5.701 Rev.4 Visual examination of valves E][ AMINATION
SUMMARY
The sixteen bearing cover studs were removed for the completion of the examinations. No indications of stud degradation were found.
~ ENCLOSURE (1) REACTOR COOLANT PRESSUIRE BOUNDARY THREADED FASTENER EXAMINATION UNIT DATE ' COMPONENT Unit i November 1983 1-S1-235; 12" Atwood & Morrill Swing Check Valve TECHNICAL DATA Bearing Cover Stud Dimensions: 7/8"- 9 UNC x 3" (Fully Threaded) Bearing Cover Stud Material: ASTM A-453 GR. 66 Chrome Plated Threads Lubricant: Felpro N-5000 Bearing Cover Gasket Material: Flexitallic Type 304 SS and Asbestos,200 PPM Cl Maximum EXAMINATION PROCEDURES s NDE 5.201 - Rev. 3 Water washable liquid penetraht" examination ~ of ferrous and nonferrous materials y NDE 5.701 Rev.4 Visual examination of valves - -A EXAMINATION
SUMMARY
The sixteen bearing cover studs were rernoved for the completion of the examinations. No indications of stud degradation were found. i'y n 5',
- n i
P b '( s 3, b s ?E 4 1 I . Q. u_ A m um
ENCLOSURE (!) REACTOR COOLANT PRESSURE BOUNDARY THREADED FASTENER EXAMINATION UNIT DATE COMPONENT Unit 1 October 1983 1-SI-245; 12" Atwood & Morrill Swing Check Valve TECHNICAL DATA Bearing Cover Stud Dimensions: 7/8"- 9 UNC x 3"(Fully Threaded) Bearing Cover Stud Material: ASTM A-453 GR. 66 Chrome Plated Threads Lubricant: Felpro N-5000 Bearing Cover Gasket Material: Flexitallic Type 304 SS and Asbestos,200 PPM Cl Maximum EXAMINATION PROCEDURES NDE 5.201 Rev. 3 Water washable liquid penetrant examination of ferrous and nonferrous materials NDE 5.701 Rev.4 Visual examination of valves EXAMINATION
SUMMARY
The sixteen bearing cover studs were removed for the completion of the examinations. - No indications of stud degradation were found. 4 k [ y A ~ s -A 1 + +* n en v + x s
a s. ENCLOSURE (1) REACTOR COOLANT PRESSURE BOUNDARY THREADED FASTENER 2XAMINATION UNIT DATE COMPONENT Unit - 1 November 1983 1-S1-227; 12" Velan Swing Check Valve TECHNICAL DATA Cover Stud Dimensions: 17/8"-8UN x 31/4" Cover Stud Material: ASTM A-193 GR.B7 Phosophaste Coated Lubricant: Felpro N-1000 Cover Gasket Material: Flexitallic Type 316 SS and Asbestos,200 PPM C1 anaximum EXAMINATION PROCEDURES NDE 5.701 Rev.4 Visual Examination of Valves NDE 5.100 -Rev.5 Magnetic Particle Examination of Ferromagnetic Bolts or Studs EXAMINATION
SUMMARY
The sixteen cover studs were removed for' the completion of the examinations. No indications of stud degradation were found. ~ f" 9 n
ENCLOSURE (1) REACTOR COOLANT PRESSURE BOUNDARY THREADED FASTENER EXAMINATION UNIT DATF. COMPONENT d Unit 1 November 1983 1-SI-118; 6" Velan Balanced Swing Check Valve TECHNICAL DATA Cover Stud Dimensions: 11/4"-8UNC x 4 3/4" Cover Stud Material: ASTM A-193 GR.B7 Phosophaste Coated Lubricant: Felpro N-1000 Cover Gasket Material: Flexitallic Type 316 SS and Asbestos,200 PPM Cl maximum Balance Arm Packing Material: John Crane 187-J; Inconel wire insert wrapped with asbestos yarn around a core of asbestos impregnated with graphite EXAMINATION PROCEDURES NDE' 5.701 - Rev.4 Visual Examination of Valves Rev.5 Magnetic Particle Examination of Ferromagnetic Bolts or Studs NDE 5.100 EXAMINATION
SUMMARY
The twelve cover studs were removed for the completion of the examinations. No - indications of stud degradation were found. I E '. 0 w c -+ + y y
ENCLOSURE (1) REACTOR COOLANT PRESSURE BOUNDARY THREADED FASTENER EXAMINATION UNIT DATE COMPONENT Unit 1 November 1983 1-51-128; 6" Velan Balanced Swing Check Valve TECHNICAL DATA Cover Stud Dimensions: 11/4"-8UNC x 4 3/4" Cover Stud Material: ASTM A-193 GR.B7 Phosophaste Coated Lubricant: Felpro N-1000 Cover Gasket Material: Flexitallic Type 316 SS and Asbestos,200 PPM Cl maximum Balance Arm Packing Material: John Crane 187-I; Inconel wire insert wrapped with asbestos yarn around a core of asbestos impregnated with graphite EXAMINATION PROCEDURES ' NDE 5.701 Rev.4 Visual Examination of Valves NDE 5.100 Rev.5 Magnetic Particle Examination of Ferromagnetic Bolts or Studs EXAMINATION
SUMMARY
The twelve cover studs were removed for the completion of the examinations. No indications of stud degradation were found. s
ENCLOSURE (1) REACTOR COOLANT PRESSURE BOUNDARY THREADED FASTENER EXAMINATION UNIT DATE COMPONENT Unit 1 October 1983 1-51-138; 6" Velan Balanced Swing Check Valve TECHNICAL DATA Cover Stud Dimensions: 11/4"-8UNC x 4 3/4" Cover Stud Material: ASTM A-193 GR.B7 Phosophaste Coated Lubricant:- Felpro N-1000 Cover Gasket Material: Flexitallic Type 316 SS and Asbestos,200 PPM Cl maximum Balance Arm Packing Material: John Crane 187-I; Inconel wire insert wrapped with asbestos yarn around a core of asbestos impregnated with graphite EXAMINATION PROCEDURES NDE 5.701 Rev.4 Visual Examination of Vaives NDE 5.100 Rev.5 Magnetic Particle Examination of Ferromagnetic Bolts or Studs EXAMINATION
SUMMARY
The twelve cover studs were removed for the completion of the examinations. No indications of stud degradation were found. F
ENCLOSURE (1) REACTOR COOLANT PRESSURE BOUNDARY THREADED FASTENER EXAMINATION UNIT _ DATE COMPONENT Unit i October 1983 1-51-148; 6" Velan Balanced Swing Check Valve TECHNICAL DATA Cover Stud Dimensions: 11/4"-8UNC x 4 3/4" Cover Stud Material: ASTM A-193 GR.B7 Phosophaste Coated Lubricant: Felpro N-1000 Cover Gasket Material: Flexitallic Type 316 SS and Asbestos,200 PPM Cl maximum Balance Arm Packing Material: John Crane 187-I; inconel wire insert wrapped with asbestos yarn around a core of asbestos impregnated with graphite EXAMINATION PROCEDURES NDE 5.701 Rev.4 Visual Examination of Valves NDE 5.100 Rev.5 Magnetic Particle Examination of Ferromagnetic Bolts or Studs ' EXAMINATION
SUMMARY
The twelve cover studs were. removed 'for the completion of the examinations. No ~ 1ndications of stud degradation were found.- =}}