Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000271/LER-1976-037-03, /3L:on 761013,UPS-1B Trouble Alarm Received.Caused by Low Voltage of Teledynamics,Brute Iii,Series 400002B, Control Power Battery Due to Inoperative Voltage Regulator Circuit.Spare Power Supply Wired + (07:53:33, 14 December 2024)
- 05000271/LER-1976-038-03, /3L:on 761019,HPCI/condensate Storage Tank Level Switches 23-74 & 23-75 & Torus Water Level Switch 23-91A Would Not Actuate at Tech Spec Setpoint.Caused by Stuck Pivot Plate & Float,Respectively + (07:53:35, 14 December 2024)
- 05000499/LER-1991-005, :on 910411,automatic ESF Actuation of Control Room Envelope HVAC Trains B & C to Emergency Mode Occurred. Cause Not Determined.Plant Records Reviewed & Root Cause Analysis Performed + (07:53:37, 14 December 2024)
- 05000271/LER-1976-039-03, /3L:on 761012,discovered That No Charcoal Cartridge Samples Obtained for 761004-12 at Station 1.0 in Hinsdale, Nh.Caused by Failure to Turn Sample Switch to on Position + (07:53:39, 14 December 2024)
- 05000271/LER-1976-040-03, /3L:on 761019,UPS-1B Tripped During RHR Operability Testing on Motor Operated Valve RHR-27B.Caused by UPS-1B Logic Failure.Valve RHR-27B Manually Opened & Shut.Valves RHR-25B & RHR-27B Cycled W/O Tripping Unit + (07:53:41, 14 December 2024)
- 05000321/LER-1991-023, :on 911014,reactor Cavity Flooded & Train B of Standby Gas Treatment Sys Started But Sys Could Not Be Tripped.Caused by Blow Fuse in Control Room Panel.Fuse Replaced & Sys Secured + (07:53:43, 14 December 2024)
- 05000271/LER-1976-041-03, /3L:on 751025,low Ph/High Conductivity in Reactor Coolant Water Discovered During Normal Startup Following Shutdown for Control Pattern Rod Exchange.Caused by Failed Resin Trap & Loss of Water Sample Points + (07:53:44, 14 December 2024)
- ML20086A174 + (07:53:45, 14 December 2024)
- 05000271/LER-1976-042-03, /3L:on 761028,differential Pressure Switch DPIS 13-83 Discovered Actuated Above Water Limit During Surveillance Testing of RCIC High Steam Line Switches. Caused by Barton Model 288 Setpoint Drift + (07:53:47, 14 December 2024)
- ML20086A166 + (07:53:48, 14 December 2024)
- ML20086A163 + (07:53:49, 14 December 2024)
- ML20086A155 + (07:53:50, 14 December 2024)
- 05000321/LER-1991-024, :on 911016,determined That Procedure Re Surveillance Checks of Torus Oxygen Concentration Not Performed Once Per Day.Caused by Misinterpretation of Ts. Procedure Revised to Require Daily Check + (07:53:51, 14 December 2024)
- ML20086A143 + (07:53:52, 14 December 2024)
- ML20086A142 + (07:53:53, 14 December 2024)
- BSEP-95-0305, Two Inoperable Control Rod Accumulators Result in Entry Into TS 3.0.3 + (07:53:57, 14 December 2024)
- ML20086A132 + (07:53:57, 14 December 2024)
- ML20086A126 + (07:54:00, 14 December 2024)
- ML20086A118 + (07:54:01, 14 December 2024)
- ML20086A121 + (07:54:01, 14 December 2024)
- HL-4868, Forwards Response to NRC 950606 RAI Re Core Shroud Mod Installed at Facility,To Clarify Methodology in Suppl a to Rev 1 to GENE-771-34-0794.GE Proprietary Rept, Finite Element Analysis... Also Encl.Ge Proprietary Rept Withheld + (07:54:02, 14 December 2024)
- ML20086A114 + (07:54:03, 14 December 2024)
- ML20086A112 + (07:54:03, 14 December 2024)
- ML20086A104 + (07:54:04, 14 December 2024)
- NRC-91-0150, Submits Formal Commitments Re Control Room Emergency Filtration Sys,Per NRC 911021-25 Visit to Facility.Ts Change Proposal,To Incorporate New Charcoal Lab Analysis Std,Will Be Submitted by 920131 + (07:54:04, 14 December 2024)
- 05000352/LER-1995-002-01, :on 950221,dual Unit Scram Occurred Due to Offsite Electrical Transmission Disturbance.Changed Ground Fault Detection Relay Setttings for LGS Units 1 & 2 Main Transformers to Provide Better Coordination W/Sys Equipment + (07:54:06, 14 December 2024)
- ML20086A091 + (07:54:12, 14 December 2024)
- ML20086A088 + (07:54:18, 14 December 2024)
- ML20086A087 + (07:54:19, 14 December 2024)
- ML20086A082 + (07:54:22, 14 December 2024)
- ML20086A081 + (07:54:22, 14 December 2024)
- ML20086A078 + (07:54:23, 14 December 2024)
- ML20086A077 + (07:54:23, 14 December 2024)
- ML20086A075 + (07:54:25, 14 December 2024)
- 0CAN119104, Proposes Listed Changes in Communication Channels for performance-related Issues & Trends,Per 910924 Performance Meeting.Initial Objectives of Performance Meetings Satisfied & Further Performance Meetings Unnecessary + (07:54:28, 14 December 2024)
- ML20086A069 + (07:54:29, 14 December 2024)
- ML20086A067 + (07:54:29, 14 December 2024)
- ML20086A065 + (07:54:30, 14 December 2024)
- ML20086A061 + (07:54:31, 14 December 2024)
- ML20086A063 + (07:54:31, 14 December 2024)
- ML20086A056 + (07:54:34, 14 December 2024)
- 05000267/LER-1976-012, Circulator 1B Tripped. Caused by Buffer Seal Malfunction.Sys Operating Procedure for Reset Following Trip Will Be Revised + (07:54:36, 14 December 2024)
- ELV-03196, Application for Amends to Licenses NPF-68 & NPF-81,revising Loop Design Flow in TS Table 2.2-1 from 95,700 Gpm to 93,600 Gpm & RCS Sys Flow in TS 3.2.5.c from 393,136 Gpm to 384,509 Gpm + (07:54:37, 14 December 2024)
- ML20086A048 + (07:54:38, 14 December 2024)
- ML20086A044 + (07:54:39, 14 December 2024)
- ML20086A042 + (07:54:39, 14 December 2024)
- ML20086A040 + (07:54:41, 14 December 2024)
- ML20086A031 + (07:54:42, 14 December 2024)
- ML20086A033 + (07:54:42, 14 December 2024)
- ML20086A021 + (07:54:44, 14 December 2024)
- ML20086A029 + (07:54:44, 14 December 2024)