Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12032A059 + (01:40:13, 13 January 2025)
- ML12032A056 + (01:40:15, 13 January 2025)
- ML12032A055 + (01:40:16, 13 January 2025)
- ML12032A054 + (01:40:18, 13 January 2025)
- ML12032A051 + (01:40:21, 13 January 2025)
- ML12032A048 + (01:40:23, 13 January 2025)
- 05000331/LER-2012-001, Regarding Inoperability of Low Pressure Coolant Injection Due to Discharge Line Voiding + (01:40:58, 13 January 2025)
- ML12032A035 + (01:41:02, 13 January 2025)
- ML12032A027 + (01:41:03, 13 January 2025)
- ML12032A020 + (01:41:04, 13 January 2025)
- Press Release-I-12-003, NRC Completes Review of Fire Protection Exemption Requests at Indian Point; Requests Information from Entergy + (01:41:06, 13 January 2025)
- Press Release-12-011, NRC Seeks Comment on Reactor Accident Consequence Research; Public Meetings Feb. 21, 22 in Virginia, Pennsylvania + (01:41:09, 13 January 2025)
- TAC:ME7207 + (01:41:10, 13 January 2025)
- ML120320381 + (01:41:13, 13 January 2025)
- ML120320377 + (01:41:16, 13 January 2025)
- ML120320222 + (01:41:18, 13 January 2025)
- ML120320214 + (01:41:20, 13 January 2025)
- ML120320193 + (01:41:22, 13 January 2025)
- ML120320192 + (01:41:24, 13 January 2025)
- ML120320028 + (01:41:26, 13 January 2025)
- ML12031A292 + (01:41:27, 13 January 2025)
- ML12031A265 + (01:41:29, 13 January 2025)
- L-12-029, Closure of Perry Nuclear Power Plant NOV Incident Number 1110-43-3373 + (01:41:33, 13 January 2025)
- ML12031A252 + (01:41:35, 13 January 2025)
- NLS2012002, Enclosure 2 to NLS2012002, Core Plant Bolt Stress Analysis Report (Non-Proprietary) + (01:41:36, 13 January 2025)
- ML12031A248 + (01:41:38, 13 January 2025)
- PLA-6774, Request in Accordance with 10 CFR 50.55A(f)(4)(iv) for IST Components to Use Subsequent ASME Om Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval PLA-6774 + (01:41:39, 13 January 2025)
- 05000255/LER-2011-004-01, For Palisades, Regarding Turbine-Driven Auxiliary Feedwater Pump Inoperable in Excess of Technical Specification Requirements Due to Unexpected Trip + (01:42:12, 13 January 2025)
- PNP 2012-007, Special Report for Inoperability RIA-2327 of High Range Noble Gas Monitor + (01:42:15, 13 January 2025)
- ML12031A224 + (01:42:18, 13 January 2025)
- ML12031A223 + (01:42:19, 13 January 2025)
- ML12031A222 + (01:42:20, 13 January 2025)
- ML12031A207 + (01:42:22, 13 January 2025)
- 05000397/LER-2012-001, Regarding DG-3 Inoperable for Longer than Allowed by TS Due to Failed Governor + (01:43:58, 13 January 2025)
- LIC-12-0009, CFR 72.48 Evaluation Summary Report for July 23, 2010 Through December 31, 2011 + (01:45:29, 13 January 2025)
- ML12031A183 + (01:45:31, 13 January 2025)
- IR 05000254/2011005 + (01:45:42, 13 January 2025)
- ML12031A180 + (01:45:44, 13 January 2025)
- ML12031A178 + (01:45:46, 13 January 2025)
- ML12031A176 + (01:45:48, 13 January 2025)
- ML12031A170 + (01:45:50, 13 January 2025)
- BSEP 12-0003, 2011 Sea Turtle Annual Report + (01:45:51, 13 January 2025)
- ML12031A168 + (01:45:54, 13 January 2025)
- 05000324/LER-2011-002, For Brunswick, Unit 2, Regarding Unanalyzed Condition Due to Reactor Pressure Vessel (RPV) Head Detensioned During Startup + (01:46:15, 13 January 2025)
- WM 12-0003, Response to NRC Request for Additional Information Regarding 60-day Response to NRC Bulletin 2011-01,Mitigating Strategies + (01:46:18, 13 January 2025)
- ML12031A149 + (01:46:21, 13 January 2025)
- ML12031A147 + (01:46:22, 13 January 2025)
- 05000461/LER-2011-004, Regarding Automatic Reactor Scram During Removal of Main Generator + (01:46:42, 13 January 2025)
- ML12031A138 + (01:46:45, 13 January 2025)
- 05000482/LER-2011-009-01, Regarding Inadequate Oil Analysis Causes Inoperable Auxiliary Feedwater Pump Longer than Allowed Outage Time + (01:46:49, 13 January 2025)
- ML12031A125 + (01:46:51, 13 January 2025)