Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087K695 + (19:09:07, 13 December 2024)
- ML20087K692 + (19:09:08, 13 December 2024)
- ML20087K691 + (19:09:09, 13 December 2024)
- ML20087K688 + (19:09:10, 13 December 2024)
- ML20087K690 + (19:09:10, 13 December 2024)
- ML20087K687 + (19:09:11, 13 December 2024)
- ML20087K684 + (19:09:12, 13 December 2024)
- 3F0895-14, Forwards Revised Relief Request V-129 Re one-time Change to Approved Frequency in Relief Request V-129 for Inservice Testing Program + (19:09:13, 13 December 2024)
- ML20087K676 + (19:09:14, 13 December 2024)
- 3F0895-19, Advises That Info Submitted by B&W Owners Group Satisfies Util Response to GL 92-01,rev 1,suppl 1 + (19:09:15, 13 December 2024)
- ML20087K674 + (19:09:15, 13 December 2024)
- JPN-95-038, Forwards Response to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity + (19:09:16, 13 December 2024)
- ML20087K657 + (19:09:17, 13 December 2024)
- ML20087K661 + (19:09:17, 13 December 2024)
- 05000237/LER-1984-003-05, :on 840221,core Spray Valve MO2-1402-25A Failed to Operate from Control Room.Caused by Cracked Bearing Race & Gear Housing.Work Requests Written to Modify Existing Circuitry + (19:09:19, 13 December 2024)
- ML20087K651 + (19:09:20, 13 December 2024)
- 05000286/LER-1984-006-01, :on 840309,during Monthly Reactor Protection Sys Testing,Turbine Tripped.Caused by Inadvertent Closure of Cell Switch Associated W/Reactor Trip Bypass Breaker 52/BYB.Catch Realigned + (19:09:22, 13 December 2024)
- ML20087K646 + (19:09:23, 13 December 2024)
- ML20087K638 + (19:09:24, 13 December 2024)
- ML20087K636 + (19:09:25, 13 December 2024)
- ML20087K609 + (19:09:27, 13 December 2024)
- ML20087K607 + (19:09:28, 13 December 2024)
- ML20087K594 + (19:09:32, 13 December 2024)
- ML20087K579 + (19:09:33, 13 December 2024)
- ML20087K576 + (19:09:33, 13 December 2024)
- ML20087K569 + (19:09:35, 13 December 2024)
- ML20087K554 + (19:09:36, 13 December 2024)
- ML20087K553 + (19:09:36, 13 December 2024)
- ML20087K544 + (19:09:37, 13 December 2024)
- 05000387/LER-1984-009, :on 840221,during Restart,Hpci Steam Supply Line Pressure Indicator Did Not Respond to Warm Up & Reactor Pressure Exceeded 150 Psig.Checkoff List & Operating Procedure Revised + (19:09:39, 13 December 2024)
- ML20087K542 + (19:09:41, 13 December 2024)
- 05000237/LER-1984-004-05, :on 840222,during Core Spray Valve Operability Test DOS 1400-2,core Spray Suction Valve MO-2-1402-3A Failed to Close from Control Room.Caused by Faulty Auxiliary Breaker Contact.Contacts Replaced + (19:09:42, 13 December 2024)
- ML20087K534 + (19:09:43, 13 December 2024)
- U-602483, Responds to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity + (19:09:44, 13 December 2024)
- ML20087K515 + (19:09:45, 13 December 2024)
- ML20087K514 + (19:09:45, 13 December 2024)
- ML20087K491 + (19:09:46, 13 December 2024)
- ML20087K489 + (19:09:47, 13 December 2024)
- ML20087K485 + (19:09:48, 13 December 2024)
- ML20087K487 + (19:09:48, 13 December 2024)
- ML20087K482 + (19:09:49, 13 December 2024)
- 05000366/LER-1984-002, :on 840220,five Main Steam Safety Relief Valves Failed to Lift in 1% Tolerance Range Required by Tech Specs. Caused by Corrosion Buildup on Pilot Assembly.Safety Relief Valves Calibr + (19:09:51, 13 December 2024)
- ML20087K477 + (19:09:52, 13 December 2024)
- ML20087K473 + (19:09:53, 13 December 2024)
- ML20087K471 + (19:09:54, 13 December 2024)
- NRC-95-4532, Forwards Proposed Draft/Markup of SSAR Section 18.9.8 + (19:09:55, 13 December 2024)
- ML20087K463 + (19:09:58, 13 December 2024)
- ML20087K457 + (19:09:59, 13 December 2024)
- ML20087K460 + (19:09:59, 13 December 2024)
- ML20087K456 + (19:10:00, 13 December 2024)
- ML20087K450 + (19:10:01, 13 December 2024)