ML20087K456
| ML20087K456 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick |
| Issue date: | 08/15/1995 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-92-01, GL-92-1, NUDOCS 9508230303 | |
| Download: ML20087K456 (2) | |
Text
b f.
(
^
Ctation Suppo,t DepartmeritI
[
_1 7,-4 1,j '
GL 92-01, R0v. 1, Sup.1 y
- PECD ENERGY /
2; J;si==.,,
965 Chesterbrook Boulevard Wayne, PA 19037-5691 August:15, 1995-Docket Nos. 50-277 50-278
.50-352 50-353 License Nos. DPR-44 DPR NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555'
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units l'and 2 Response to Generic Letter 92-01, Revision 1, Supplement 1,
" Reactor Vessel Structural Integrity"
Dear Sir:
The. following 'is our response to Generic Letter (GL) 92-01, Revision.1,. Supplement 1,
" Reactor Vessel Structural Integrity,"~
dated May 19, 1995.
In a letter dated August 10, 1995, the'BWR Vessel and Internals Project-(BWRVIP) providedLa response to the U. S.LNuclear" Regulatory Commission (USNRC)' request-for information contained in GL 92-01,. Revision 1, Supplement 1.
_The DWRVIP response is-applicable to the-Peach. Bottom Atomic-P_ower Station (PBAPS),. Units 2 and 3, and Limerick Generating Station (LGS),: Units 1 and 2.
PECO Energy Company is'an active
. participant'in the BWRVIP and endorses the'BWRVIP response ~as contained in the August 10, 1995 letter to the USNRC.
' If you have any questions, please contact us.
Very truly yours, f.0 l$} f
. G.LA. Hunger, Jr., Director Licensing cct. T; T. Martin,. Administrator, Region I, USNRC-W. L. Schmidt, USNRC Senior Resident ~ Inspector,1PBAPS N. S. Perry, 'USNRC Senior Resident' Inspector, ISS
.L
( d(Q 9508230303 950815
'PDR~ ADOCK 05000277-P PDR.
g
jb.~ l
- i a
. COMMONWEALTH OF PENNSYLVANIA
- ss.
COUNTY OF CHESTER -
W. H. Smith, Ill, being first duly sworn, deposes and says:
That he is Vice President of PECC Energy Company; that he has read the response to Generic Lettar 92-01, Revision 1, Supplement 1, for Peach Bottom Facility Operating Licenses DPR44 and DPR-56, and Umerick Generating Facility Operating Ucenses NPF-39 and NPF-85 and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, l
Information and belief.
k
-[
Vice PresidenV Subscribed and sworn to before me this ay of 1995.
h o
Notary Public D
he r c"8n$
My Comm.ssion Emires May 17.1999 Lbmber,Pennsyivan Ar.socuton of tbtarus