ML20087K646

From kanterella
Jump to navigation Jump to search
Forwards Blind Analysis for Giraffe Helium Tests H1 - H4
ML20087K646
Person / Time
Site: 05200004
Issue date: 08/18/1995
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned)
Shared Package
ML20087K650 List:
References
MFN-159-95, NUDOCS 9508240065
Download: ML20087K646 (2)


Text

__-

(

l l G

GENuclearEnergy S'8 5C Avon ,Y165 San Jose,' CA 95125-1014 406 925-1005 (phone) 406 925-3991 (facsimile)

August 18,1995 MFN 159-95 1 Docket STN 52-004 Document Controi Desk q U. S. Nuclear Regulatory Commission j Washington DC 20555  !

l Attention: Theodore E. Quay, Director Standardization Project Directorate

Subject:

SBWR - Blind Analysig For GIRAFFE Helium Tests H1-H4

Reference:

1. Letter from J. E. Quinn (GE) to Theodore E. Quay (NRC), SBWR - Response to Requestfor AdditionalInformation (RAI) Regarding the Simplified Boiling i Water Reactor (SBWR) Design (Q900.102 - Q900.181), dated 6/29/95, MFN 136-95, July 28,1995 In Reference 1, the GE response to RAI Q900.159 committed to perform a blind analysis of i the GIRAFFE / Helium tests. The attached report completes this commitment.

Sincerely,

_ m/'

4V ,

,/

) ~ . _

a sE._QHmn, Projects Manager l-l

Attachment:

Blind Analysis For GIRAFFE Helium Tests H1-H4 cc: P. A. Boehnert (NRC/ACRS) (2 paper copies w/att. plus E-Mail w/o att.)

I. Catton (ACRS) (1 paper copy w/att, plus E-Mail w/o att.)

l S. Q. Ninh (NRC) (2 paper copies w/att. plus E-Mail w/o att.)

J. H. Wilson (NRC) (1 paper copy w/att. plus E-Mail w/o att.)

L 220080 ,

9508240065 950818 I j0v :

PDR ADOCK 05200004 A PDR .

A i

k

t h -

?

O GENuclearEnergy i

l MFN 159  ;

bec: (E-Mail w/o att. except as noted)  !

N. E. Barclay  !

J. A. Beard  !

!' P. F. Billig '  !

R. H. Buchholz T. Cook (doe) '(2 pap r copies w/att. plus E-Mail w/o att.)  !

J. D. Duncan A. R. Ehlers (1 paper copy w/o att. plus E-Mail w/o att.)

R. T. Fernandez (EPRI)

J. R. Fitch J. E.12atherman J. E. Quinn .

T. J. Mulford (EPRI) (2 paper copies w/att. plus E-Mail w/o att.) l P. E. Novak F. A. Ross (doe) ,

K. T. Schaefer (1 paper copy w/o att. plus E-Mail w/o att.) ,

B. Shiralkar . (1 paper copy w/att. plus E-Mail w/o att.)

R. Srinivasan (EPRI) (1 paper copy w/att, plus E-Mail w/o att.)- t J. E. Torbeck GE Master File M/C 747 (1 paper copy w/att. plus E-Mail w/o att.) l SBWR Project File (1 paper copy w/att. plus E-Mail w/o att.)  !

-h i

i I

i L

I L