ML20087K646
| ML20087K646 | |
| Person / Time | |
|---|---|
| Site: | 05200004 |
| Issue date: | 08/18/1995 |
| From: | Quinn J GENERAL ELECTRIC CO. |
| To: | Quay T NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML20087K650 | List: |
| References | |
| MFN-159-95, NUDOCS 9508240065 | |
| Download: ML20087K646 (2) | |
Text
__-
(
l l G
GENuclearEnergy
,Y165 San Jose,' CA 95125-1014 S'8 5C Avon 406 925-1005 (phone) 406 925-3991 (facsimile)
August 18,1995 MFN 159-95 1
Docket STN 52-004 Document Controi Desk q
U. S. Nuclear Regulatory Commission j
Washington DC 20555 l
Attention: Theodore E. Quay, Director Standardization Project Directorate
Subject:
SBWR - Blind Analysig For GIRAFFE Helium Tests H1-H4
Reference:
1.
Letter from J. E. Quinn (GE) to Theodore E. Quay (NRC), SBWR - Response to Requestfor AdditionalInformation (RAI) Regarding the Simplified Boiling i
Water Reactor (SBWR) Design (Q900.102 - Q900.181), dated 6/29/95, MFN 136-95, July 28,1995 In Reference 1, the GE response to RAI Q900.159 committed to perform a blind analysis of i
the GIRAFFE / Helium tests. The attached report completes this commitment.
Sincerely,
_ m/'
)
,/
~. _
sE._QHmn, a
Projects Manager l-l
Attachment:
Blind Analysis For GIRAFFE Helium Tests H1-H4 cc:
P. A. Boehnert (NRC/ACRS) (2 paper copies w/att. plus E-Mail w/o att.)
I. Catton (ACRS)
(1 paper copy w/att, plus E-Mail w/o att.)
l S. Q. Ninh (NRC)
(2 paper copies w/att. plus E-Mail w/o att.)
J. H. Wilson (NRC)
(1 paper copy w/att. plus E-Mail w/o att.)
L 220080 9508240065 950818 j0 :
PDR ADOCK 05200004 I
v A
PDR A
i k
h
?
t O
GENuclearEnergy l
MFN 159 ;
bec: (E-Mail w/o att. except as noted)
N. E. Barclay J. A. Beard P. F. Billig '
R. H. Buchholz T. Cook (doe)
'(2 pap r copies w/att. plus E-Mail w/o att.)
J. D. Duncan A. R. Ehlers (1 paper copy w/o att. plus E-Mail w/o att.)
R. T. Fernandez (EPRI)
J. R. Fitch J. E.12atherman J. E. Quinn T. J. Mulford (EPRI)
(2 paper copies w/att. plus E-Mail w/o att.)
l P. E. Novak F. A. Ross (doe)
K. T. Schaefer (1 paper copy w/o att. plus E-Mail w/o att.)
B. Shiralkar.
(1 paper copy w/att. plus E-Mail w/o att.)
R. Srinivasan (EPRI)
(1 paper copy w/att, plus E-Mail w/o att.)-
t J. E. Torbeck GE Master File M/C 747 (1 paper copy w/att. plus E-Mail w/o att.)
l SBWR Project File (1 paper copy w/att. plus E-Mail w/o att.)
-h i
i I
i L
I L
.