Revised Emergency Plan Implementing Procedures SQN-IPD Implementing Procedures Index & SQN IP-5 General Emergency
ML20087K691
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/16/1984
From: Crawley D, Mills L, Nobles L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
PROC-840316, NUDOCS 8403260277
Download: ML20087K691 (6)


Text

.

~

):

RADIOLOGICAL EMERGENCY PLAN

+

_ Revision Date:

IP-5 PORC 3/6/84 (Issued MAR 16 m)

This_ log sheet must be retained as the last page of the Sequoyah Implementing

,. Procedures Document.

Reason for revision:

Commitment to NRC in response to IE Notice 83-28.

4-Inserted by:

Date Insert.ed:

~

-Pages to be Removed New Pages to be Inserted O

Pa rt -

Page Number Revision Part Page Number Revision iTable of Contents 1 of 1 1/31/84 Table of Contents 1 of 1 3/6/84 IP-5 Cover Sheet 7

IP-5 Cover Sheet 8-2 of 3 7

2 of'3~

8 Attachment 1 of 1

'8 l-l l

l l

.1 l'..

l(

'b/ j l

8403260277 840316 l

PDR ADOCK 05000327 p

PDR I

'L

"6 SQNP SQN-IPD TABLE OF CONTENTS

(

Page 1 of 1 4

IMPLEMENTING PROCEDURES INDEX

' Instr.

Revision' Title SQN-IP-1.

5-Emergency Plan Class'ification Logic SQN-IP-2

-5

- Notification of Unusual Event SQN-IP-3 7

Alert SQNoIP-4 7

Site Emergency J(;SQN-IP-5

-8

' Emergency - General Emergency

,SQN-IP-6 8

Activiation of the Technical Support Center

.SQN-IP-7

'l

. Activation of the Operations Support Center SQN-IP 8-Personnel Accountability and Evacuation SQN-IP-9 O

Accountability and Evacuation of the Power Operation Training Center

(

)

SQN-IP-10 6

Medical Emergency Procedure SQN-IP-11 5

Security and Access. Control SQN-IP-13 5

Call Lists SQN-IP-14 8

Health Physics Procedure h

SQN-IP-15 2

Emergency. Exposure Guidelines i -

SQN-IP-16

0

~ Recovery Procedure SQN-IP-17

~7.

Emergency Equipment and Supplies SQN-IP-183 4

Plant Ealease Rate Calculations (Cancelled)

-SQN-IP-19

.1 Radiological Emergency Plan Training i

.SQN-IP 1-Environmental Monitoring During A Radiological Emergency

[.

Revised- 03/06/84 l.

't s '.

h

'b W=

=

. Sequoyah Nuclear Plant DISTRIBUTION r 's.

1C 81 Plant Master File

(

)-

IC 83 Asst. Power Plant Supt. (Oper.)

IC 84 Asst. Power Plant Supt. (Maint.)

-SQN REP - IMPLEMENTING 1C 86 Maintenance Supervisor (M)

PROCEDURES DOCUMENT IC 87 Maintenance Supervisor (E)

IC 88 Maintenance Supervisor (I)

SQN, IP-5 1C 89 Results Supervisor IC 90 Operations Supervisor-IC 92 Health Physics Director GENERAL EMERGENCY IC 93 Public Safety Services Supv.

1C 95 Outage Director 1C 96 Emergency Cabinet Control Room IC 97 Emergency Cabinet Communications Room IC 98 Emergency Van 1C 102 Shift Engineer's Office IC 103 Unit Control Room Prepared By:

J.R. Walker 1C 105 Health Physics Lab.aratory IC 106 Medical Office Revised By:

D. E Crawley 1C 107 Resident NRC Inspector - SNP IC 108 Technical Support Center Submit'ted Byi DR IC 109 Assistant HP Supervisor Supervisor (j '

.1C EP&P - Eric Sliger, 1470 CST 2-C

-1C Records Manual Control Unit.1570 CST 2-C PORC Review:

4 ((

IC Technical Support Date

[]

Approved By:

M.

\\ __e Pwr Plt Superintendent Date Approved:

3 MM[

r I

t s

Rev. No.

Date Revised Pages Rev..No.

Date Revised Pages 0

8/5/80 All 4

10/26/82 2

1

_10/21/80 2

5 12/29/82 All 2-1,2f2/El 1

6 2/9/83 1

3 3/11/82 1

7 03/10/83 All h!AR~ G 1984 2,Added' 4 8

The last page of this instruction is Number 4

,-m

~

w

s

= ^ *

.s i s.

SQNP REP-IPD SQN, IP-5

(.;

s Page 2 of 3 t

Rev. 8 g.

Emergency Situation:

(1) Does cut involve a radiation release from the plant.

__ (2) Involves a radiation release from the plant.

(3) Radiation release information is not known.

.h.

Radiation Release Is:

(1)' Ground Level - Airborne (2) Elevated - Airborne (3) Water Borne (4) Other i.

Wind Direction Is From:

f(degrees) j.

Wind Speed (miles /hr) k.

Recommend Protective Action:

(Determine recommended protective action from Attachment 1.)

Recommendation 1 jr-b Recommendation.2 Recommendation 3 Recommendation 4 (Initials)-

Notif'y,the hgalth physics laboratory.

3.

4.

Notify Plant Duty. Supervisor and provide the same information given to Operations Duty Specialist (see duty list for telephone number).

.5.

During off shif ts the Shift Engineer Clerk will contact one individual in each section of the call list in IP-6.

e (5

v iipi igg i -

a

4 SQNP d

REP-IDP e

.a SQN-IP-5 ATTACllMENT y

Page 1 of I Rev. 8 g

\\

PLANT CtWERAL i

EMt3C4WCT U

NO sussiamtiAL Ccet Damact YES IN PROCRIS$ 08 Pe0JECit3 (180f8 l)

~

('

o SCC 0rt3DA*te!! le $ntligt CF s LAact Ft$510N FR00CCT 2-MILE RADICS Ute S ItILEs guvtstost is costAthntsf YES NO DOWVt yp (Nott 2) t e

if 4

NO en0Jtetts

?E$

d.

Courat> Mast FAILest 1

(MOTE 3) i 1r f

REComt2Af tCM 2e e.

Comelder evaevetten to e esi.e.

.,,i...Do,.

.nt b.

Ceesidet evsevatten la c

... ~.

actual sad ptejected down-

- ~ ~

oted setters to $ ellee.

e.

Cor. sider sheltestas la Sloft is for essep:e. toedegwate e,ee seeltas entste.

seestader of plume 81071 f Fee essaole, elselflemas amesseee la Crees Falleo ewel Detectore RM-90-106 lever sentainerna sumiter er as-90.llt wp;et eestale=nt eoalter taeresse obeve 3 e 805 sea olthta 10-30 etantes.

ut.CCTtt%D4flos 4 revrt 3r Fee esemple e leese gorgees, ge testatament

e.. Shelterlat aetwal and pre.

poetsure. breach of aestanceae. er bel 84.p SECO*NLWTf tM ):

J eted dated pop,geg g,.

et hedresen.

a.

Evaevat tes actual end se le ellee.

b.

Iveseatles othee aestore B"

PfeJetted dewawlad pervlattees to le estes.

to gg ettee.

E NO c.

Plaantag f eg g,,,,g,ee late,, e,se=,=

t.

Eve <wat tag othee sectore

-t

,,,,g, to 3 elles, c.

Fisantaa f*f feedesof f to 80 ellee p g,,,g e, g,,. g,,,,,,,,

3, eentrole up to 30 attes d**** I "O '

enseate op u W en dewee t ed.

cam 0 8 Oei, m.-en e.d. tie. :.' :. 3. et.i e s..e,,,e.

to the Operettoes Dutt Spectellet. The one chosee se depose.

g.

.e the,ee ite og geigog,, age 3,ge g

. diesese.

1

.(j

~

4

. s

c TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II March 20, 1984 U.S. Nuclear Regulatory Countission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 - RADIOLOGICAL EMERGENCY PLAN IMPLEMENTING PROCEDURES DoctNENT REVISION - DATED MARCH 16, 1994 In acooadance with the requirements of 10 CFR 50.54(q), enclosed is a revision to the Sequoyah Nuclear Plant Radiological Emergency Plan Implementing Procedums Document <tated March 16, 1984.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY i

L. M. Mills, Manager Nuclear Licensing Enclosum co: Office of Nuclear Reactor Regulation (Enclosure 2)

Attn: Document Control Desk U.S. Nuclear Regulatory Cosmtission Washington, D.C.

20555

/ <

g3%g g3 go4S fl 1983-TVA SOTH ANNIVERSARY An Equal Opportunity Employer p

-v-,.--vyv-y v

.,,m-

,9y4.,

,m y.gy

,y.w.