Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092C745 + (16:29:14, 13 December 2024)
- ML20092C737 + (16:29:15, 13 December 2024)
- ML20092C717 + (16:29:16, 13 December 2024)
- ML20092C733 + (16:29:16, 13 December 2024)
- ML20092C700 + (16:29:17, 13 December 2024)
- 05000282/LER-1995-010, :on 950804,discovered Deficiencies in Flow Testing of RHR Sys.Caused by Deficient Procedure Which Failed to Consider Effect of Recirculation Line Downstream of Flow Orifice.Procedure Changes Will Be Made + (16:29:19, 13 December 2024)
- ML20092C689 + (16:29:20, 13 December 2024)
- ML20092C681 + (16:29:21, 13 December 2024)
- ML20092C680 + (16:29:22, 13 December 2024)
- U-602493, Provides Revised Response to Unresolved Item Noted in Insp Rept 50-461/95-08.Correct USAR Page for Proposed USAR Rev Re Util Commitment to ANSI N45.2.6-1978, Qualifications of Insp,Exam & Testing Personnel for NPPs Encl + (16:29:22, 13 December 2024)
- ML20092C672 + (16:29:24, 13 December 2024)
- ML20092C676 + (16:29:24, 13 December 2024)
- ML20092C671 + (16:29:26, 13 December 2024)
- ML20092C667 + (16:29:27, 13 December 2024)
- ML20092C669 + (16:29:27, 13 December 2024)
- ML20092C661 + (16:29:28, 13 December 2024)
- ML20092C643 + (16:29:30, 13 December 2024)
- ML20092C659 + (16:29:30, 13 December 2024)
- ML20092C641 + (16:29:31, 13 December 2024)
- U-602491, Forwards Nucon Intl,Inc Rept Nucon 06IL902/01, Pyrolysis Gas Chromatography Analysis of 9 Thermo-Lag Fire Barrier Samples Re GL 92-08 + (16:29:32, 13 December 2024)
- ML20092C633 + (16:29:33, 13 December 2024)
- ML20092C630 + (16:29:35, 13 December 2024)
- ML20092C626 + (16:29:36, 13 December 2024)
- ML20092C622 + (16:29:37, 13 December 2024)
- ML20092C616 + (16:29:39, 13 December 2024)
- ML20092C614 + (16:29:40, 13 December 2024)
- ML20092C611 + (16:29:41, 13 December 2024)
- ML20092C609 + (16:29:42, 13 December 2024)
- ML20092C597 + (16:29:42, 13 December 2024)
- ML20092C592 + (16:29:44, 13 December 2024)
- ML20092C588 + (16:29:45, 13 December 2024)
- RBG-18-027, Interim Deficiency Rept DR-160 Re Transformer Cable Lead Lugs Supplied by Gould Brown-Boveri.Next Rept Expected by 840912 + (16:29:45, 13 December 2024)
- ML20092C574 + (16:29:47, 13 December 2024)
- ML20092C566 + (16:29:48, 13 December 2024)
- ML20092C571 + (16:29:48, 13 December 2024)
- ML20092C562 + (16:29:49, 13 December 2024)
- ML20092C560 + (16:29:50, 13 December 2024)
- 05000397/LER-1984-045, :on 840518,reactor High Pressure Trip Occurred as Result of Main Steam Bypass Valve Closure Due to Low Hydraulic Fluid Pressure,When Main Turbine Manually Tripped. Main Steam Bypass Valves Reopened + (16:29:51, 13 December 2024)
- RBG-18028, Interim Deficiency Rept DR-121 Re Motor Control Ctr Equipment Supplied by Ite Gould,Inc.Next Rept Will Be Provided by 840905 + (16:29:52, 13 December 2024)
- ML20092C548 + (16:29:53, 13 December 2024)
- 05000397/LER-1984-043, :on 840519,during Pressurization of Monitor a, Isolation Signal & Load Shedding Logic Initiated Resulting in Loss of Control Power to Reactor Feedwater Level Control Sys.Caused by Monitors B & D Not Reset + (16:29:55, 13 December 2024)
- ML20092C544 + (16:29:56, 13 December 2024)
- ML20092C532 + (16:29:57, 13 December 2024)
- ML20092C531 + (16:29:58, 13 December 2024)
- ML20092C524 + (16:29:59, 13 December 2024)
- NRC-95-0098, Submits Addl Justification to Withhold Selected Proprietary Info from Public Disclosure as Requested by NRC Re FOIA-95-A-2 (95-507) + (16:29:59, 13 December 2024)
- ML20092C509 + (16:30:00, 13 December 2024)
- AECM-84-0327, Notifies of Changes in Correspondence Distribution List Addresses for Lf Dale & JB Richard.Revs Due to Organizational Changes + (16:30:01, 13 December 2024)
- ML20092C507 + (16:30:01, 13 December 2024)
- ML20092C500 + (16:30:02, 13 December 2024)
- ML20092C488 + (16:30:03, 13 December 2024)