Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092P721 + (15:48:34, 13 December 2024)
- ML20092P717 + (15:48:35, 13 December 2024)
- ML20092P716 + (15:48:35, 13 December 2024)
- ML20092P715 + (15:48:36, 13 December 2024)
- ML20092P714 + (15:48:37, 13 December 2024)
- ML20092P711 + (15:48:38, 13 December 2024)
- 05000395/LER-1984-025, :on 840425,reactor Tripped from 100% Indicated Power as Result of Main Turbine Trip.Caused by Personnel Error.Importance of Fully Understanding Job Emphasized + (15:48:39, 13 December 2024)
- ML20092P708 + (15:48:40, 13 December 2024)
- ML20092P707 + (15:48:41, 13 December 2024)
- ML20092P698 + (15:48:42, 13 December 2024)
- 05000251/LER-1984-009-01, :on 840527,28 & 30,low Discharge Flow Observed from Reactor Coolant Drain Tank Pumps.Caused by Damaged O-rings in Stem Guide to Valve Actuator.Damaged Diaphragms Replaced & Valve Stroke Adjusted + (15:48:44, 13 December 2024)
- TXX-4212, Interim Significant Deficiency Rept SDAR-136 Re Temp Envelope Requirements on Environ Qualifications of Equipment Outside Containment for High Energy Line Breaks.Initially Reported on 840604.Next Rept by 840831 + (15:48:45, 13 December 2024)
- 05000374/LER-1984-025-01, :on 840606,reactor Water Level Switches Actuated When Indicating Transmitter Switch Vented.Switches Initiated RCIC Injection Resulting in Full Reactor Scram. Caused by Personnel Error.Personnel Counseled + (15:48:46, 13 December 2024)
- 05000267/LER-1984-007, :on 840529,Loop 1 Shutdown Occurred When Rapid Rise Relay on 4,160/480-volt Transformer N-9274 Actuated. Caused by Spurious Actuation of Rapid Rise Relay Contact Circuitry + (15:48:48, 13 December 2024)
- BECO-84-095, Responds to Open Items 4-11 of Inservice Insp Program Identified in 840502 Telcon + (15:48:49, 13 December 2024)
- ML20092P678 + (15:48:50, 13 December 2024)
- ML20092P676 + (15:48:51, 13 December 2024)
- ML20092P677 + (15:48:51, 13 December 2024)
- ML20092P674 + (15:48:52, 13 December 2024)
- 05000374/LER-1984-027-01, :on 840604,test Switches Removed from Test Position W/O Direction from Technical Staff Engineer.Caused by Poor Communication.Coaching Interview Conducted to Emphasize Good Communications + (15:48:54, 13 December 2024)
- ML20092P670 + (15:48:55, 13 December 2024)
- ML20092P662 + (15:48:56, 13 December 2024)
- ML20092P669 + (15:48:56, 13 December 2024)
- ML20092P660 + (15:48:57, 13 December 2024)
- 05000251/LER-1984-008-01, :on 840601,reactor Trip Occurred.Caused by Personnel Error Resulting in Reactor Power Reaching 10% W/ Turbine in Tripped Condition.Equipment Functioned as Designed on Initiation of ESF Actuation Signal + (15:48:59, 13 December 2024)
- 05000361/LER-1984-032, :on 840528,30,31,0603,07,14,18,19 & 23, Spurious Toxic Gas Isolation Sys Actuated.Caused by Conservative Alarm Setpoints.Tech Spec Amend to Permit More Appropriate Setpoints Proposed + (15:49:01, 13 December 2024)
- ML20092P647 + (15:49:03, 13 December 2024)
- ML20092P650 + (15:49:03, 13 December 2024)
- 05000267/LER-1984-006, :on 840504,automatic Actuation of Plant Protective Sys Loop 1 Shutdown & Reactor Scram Circuitry Occurred.Caused by Detection of High Moisture Levels in Helium Primary Coolant + (15:49:05, 13 December 2024)
- ML20092P643 + (15:49:06, 13 December 2024)
- 05000316/LER-1984-015, :on 840602,w/RCS in Mode 5,shutdown Margin Determination Surveillance Grace Period Exceeded.Caused by Personnel Error.Personnel Reinstructed.Sample Frequency Increased + (15:49:08, 13 December 2024)
- TXX-4213, Interim Significant Deficiency Rept SDAR-137 Re Inconsistency in Draft Tech Spec & FSAR Accident Analysis. Initially Reported on 840604.Based on Investigation,Matter Not Reportable Per 10CFR50.55(e) + (15:49:09, 13 December 2024)
- 0CAN068416, Responds to 840523 Request for Info on Radiation Effect on Boron & Chloride Analyzers & Solution Used in Analyzers Re NUREG-0737,Item II.B.3, Post-Accident Sampling Sys + (15:49:13, 13 December 2024)
- ML20092P639 + (15:49:13, 13 December 2024)
- ML20092P636 + (15:49:14, 13 December 2024)
- BECO-84-092, Responds to Generic Ltr 84-09.Plant-specific Exam of Data Initiated Through BWR Owners Group Will Ensure Applicability of Generic Studies Submitted by Mark I Owners Group to Plant + (15:49:15, 13 December 2024)
- TXX-4203, Interim Significant Deficiency Rept SDAR-123 Re Calibr Technique of Pressure Transmitters.Corrective Action Will Be Completed by 841231 + (15:49:16, 13 December 2024)
- ML20092P632 + (15:49:16, 13 December 2024)
- ML20092P629 + (15:49:17, 13 December 2024)
- TXX-4214, Final Significant Deficiency Rept SDAR-138 Re Possible Insulation Damage in Certain Reels of Rockbestos Class IE multi-conductor Cable.Initially Reported on 840606.Matter Not Reportable Under 10CFR50.55(e) + (15:49:18, 13 December 2024)
- ML20092P626 + (15:49:18, 13 December 2024)
- ML20092P622 + (15:49:19, 13 December 2024)
- ML20092P617 + (15:49:20, 13 December 2024)
- 05000362/LER-1984-022-01, :on 840601,failure in Turbine Control Sys Caused High Pressure Turbine Stop Valves to Close,Resulting in Loss of Load Reactor Trip.Cause Undetermined.Module Replaced + (15:49:22, 13 December 2024)
- ML20092P614 + (15:49:23, 13 December 2024)
- 05000366/LER-1984-011, :on 840602,required Monthly Surveillance Not Performed on Fire Hose Station HC-30.Caused by Misinterpretation of Tech Spec Surveillance Program Procedure HNP-831.Procedure Revised + (15:49:25, 13 December 2024)
- ML20092P605 + (15:49:26, 13 December 2024)
- RBG-18107, Interim Deficiency Rept DR-126 Re Standby 480-volt Load Ctrs Supplied by Powell Electric.Next Rept Will Be Submitted by 840815 + (15:49:26, 13 December 2024)
- B11248, Forwards Summary of 840613 Meeting W/S&W & NRC Geotechnical Engineering Branch Re Status & Resolution of Remaining Open & Confirmatory Geotechnical Items Identified in FSAR & Draft Ser.Addl Info,Defining Items as Confirmatory,To Be Provided + (15:49:27, 13 December 2024)
- ML20092P600 + (15:49:28, 13 December 2024)
- 05000219/LER-1984-014, :on 840530,during Review of Surveillances within Maint Organization,Discovered That Test of Reactor Low Level Instrumentation Not Performed within Required Time Period.Caused by Personnel Error + (15:49:30, 13 December 2024)
- ML20092P598 + (15:49:31, 13 December 2024)