ML20092P643
| ML20092P643 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/29/1984 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20092P644 | List: |
| References | |
| ULNRC-851, NUDOCS 8407090203 | |
| Download: ML20092P643 (3) | |
Text
__
\\
UNION ELECTRIC COM PANY 1901 GRATIOT STREET ST. Louis, MISSOURI June 29, 1984
"^R'"*,^ox," "S**'
oo~.co,. Sc ~Seu ST. LOUIS, MISSOURI SSISS voet poet.ectos?
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ULNRC-851
Dear Mr. Denton:
DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1 FINAL SAFETY ANALYSIS REPORT, REVISION 8 Ref. 1) ULNRC-834 5/29/84
- 2) ULNRC-758 3/8/84 Furnished herewith are seventy-five copies of Revision 8 to the Callaway Plant Final Safety Analysis Report Site Addendum.
Seventy-five copies of Revision 15 to the SNUPPS Standard Plant Final Safety Analysis Report were transmitted by Mr. N. A. Petrick, Executive Director, SNUPPS by SLNRC 84-0095 dated June 26, 1984.
These revisions are hereby incorperated by reference into the Callaway Application.
Site Addendum Revision 8 includes portions of Sections 2.3, 9.2, 9.5, and 10.4 revised to reflect as-built conditions.
In addition, revised portions of Sections 13.1, 14.2, and 17.2 which address organizational changes are included.
Revision 8 also incorporates changes to Sections 2.3, 9.2, 9.5, and 13.4 to ensure c onsistency with the final Technical Specifications.
Site Addendum Revision 8 includes revised portions of Section 14.2 which incorporate NRC comments on information previously transmitted by Reference 1.
Also included is information clarifying the measurement and test equipment accuracy ratios previously transmitted by Reference 2.
If there are any questions, please contact us.
ry truly y urs,
\\e et Dona d F. Schnell KLM/caa l
6 rf[
8407090203 040629 PDR ADOCK 05000483 s
K PDR
~
s, s
STATE OF MISSOURI )
)
Robert J. Schukai, of lawful age, being first duly sworn upon oath says that he is General Manager-Engineering (Nuclear) for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
G \\ CL %
Rober t J. Schukai Gener anager-Engineering Nuclear SUBSCRIBED and sworn to before me thisR h d. day of 198 "
ft)LL
'LC v
M/RGARET S. HDDA NOTARY PUBLIC-STATE Of MISSOURI ST. LOUIS COUNTY MY COMMIS$10N EXPlRES JANUARY 2,1986
. =
~~
cc:
Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M. Street, N.W.
Washington, D.C.
20036 Nicholas A. Petrick Executive Director SNUPPS 5 Choke Cherry Road Rockville, Maryland 20850 John H. Neisler Callaway Resident Office U.S. Nuclear Regulatory Commission RRf1 Steedman, Missouri 65077 William Forney Division of Projects and Resident Programs, Chief, Section lA U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission RRil Steedman, Missouri 65077 a
i f
_ -