Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1991, Responds to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (15:18:18, 13 December 2024)
- ML20093K136 + (15:18:18, 13 December 2024)
- ML20093K133 + (15:18:19, 13 December 2024)
- RBG-18221, Interim Deficiency Rept DR-205 Re Lugs on Motor Leads of Motor Operated Valves Supplied by Limitorque.Next Rept Expected by 841011 + (15:18:22, 13 December 2024)
- ML20093K123 + (15:18:23, 13 December 2024)
- ML20093K126 + (15:18:23, 13 December 2024)
- ML20093K119 + (15:18:24, 13 December 2024)
- ML20093K116 + (15:18:25, 13 December 2024)
- RBG-18223, Interim Deficiency Rept DR-175 Re HPCS Diesel Batteries Supplied by Ge.Next Rept Expected by 841010 + (15:18:25, 13 December 2024)
- ML20093K109 + (15:18:26, 13 December 2024)
- BVY-95-107, Transmits 60 Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gates Valves + (15:18:27, 13 December 2024)
- ML20093K106 + (15:18:27, 13 December 2024)
- ML20093K105 + (15:18:28, 13 December 2024)
- RBG-18234, Final Deficiency Rept DR-159 Re Fuses in Explosive Valve Circuits of Standby Liquid Control Sys.Evaluation Indicated 2-ampere Fuse Correct.Item Not Reportable Per 10CFR50.55(e) + (15:18:28, 13 December 2024)
- ML20093K101 + (15:18:29, 13 December 2024)
- 05000255/LER-1984-020, :on 840906,review Determined Surveillance Testing Not Performed on Seven Valves in Hot Leg Injection Sys.Caused by Valves Not Being Included in Testing Program Due to Personnel Error.Valves Tested + (15:18:31, 13 December 2024)
- ML20093K095 + (15:18:32, 13 December 2024)
- ML20093K093 + (15:18:33, 13 December 2024)
- ML20093K090 + (15:18:33, 13 December 2024)
- 05000395/LER-1984-038, :on 840907,second Position Indication Channel for PORV Declared Inoperable.Caused by Procedural Inadequacies in Surveillance Test Procedures 135.001 & 506.010.Channel Calibr + (15:18:35, 13 December 2024)
- ML20093K083 + (15:18:37, 13 December 2024)
- ML20093K081 + (15:18:37, 13 December 2024)
- ML20093K075 + (15:18:39, 13 December 2024)
- ML20093K069 + (15:18:40, 13 December 2024)
- RBG-18235, Interim Deficiency Rept DR-123 Re HVAC Duct Work Supplied by Mccroskey Sheet Metal.Next Rept Expected by 840919 + (15:18:40, 13 December 2024)
- ML20093K062 + (15:18:41, 13 December 2024)
- ST-HL-AE-5180, Provides Schedule for Completion of Actions Requested in GL 95-07 for South Tx Project Units 1 & 2 + (15:18:42, 13 December 2024)
- ML20093K047 + (15:18:42, 13 December 2024)
- ML20093K035 + (15:18:43, 13 December 2024)
- ML20093K032 + (15:18:44, 13 December 2024)
- ML20093K020 + (15:18:44, 13 December 2024)
- ML20093K019 + (15:18:45, 13 December 2024)
- ML20093K002 + (15:18:46, 13 December 2024)
- ML20093J999 + (15:18:46, 13 December 2024)
- ML20093J991 + (15:18:47, 13 December 2024)
- ML20093J987 + (15:18:48, 13 December 2024)
- ML20093J978 + (15:18:49, 13 December 2024)
- 05000446/LER-1995-003-01, :on 950914,discovered Incomplete Surveillance to Confirm Turbine Driven AFW Pump Steam Admission Valves Open Stroke for Black Out Signal.Caused by Less than Adequate Procedures.Procedures Revised + (15:18:51, 13 December 2024)
- ML20093J958 + (15:18:52, 13 December 2024)
- 0CAN109509, Provides Sixty Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves + (15:18:53, 13 December 2024)
- ML20093J911 + (15:18:54, 13 December 2024)
- ML20093J945 + (15:18:54, 13 December 2024)
- ML20093J891 + (15:18:55, 13 December 2024)
- GO2-84-533, Advises of Plans to Restart Unit 3 in Jul 1985 & Unit 1 in Jul 1986,per 840925 Meeting Re Const Restart.Prior to Meeting,Bpa Released Draft Rept Requesting Addl 27-month Restart Delay.Program Developed for Activity Verification + (15:18:56, 13 December 2024)
- ST-HL-AE-1106, Responds to NRC Re Violations Noted in IE Insp Repts 50-498/84-07 & 50-499/84-07.Corrective Actions:Amend Recording Errors Corrected,Records Reviewed & Distribution Matrices Reviewed Against Station Files + (15:18:57, 13 December 2024)
- ML20093J862 + (15:18:57, 13 December 2024)
- NLS8400251, Application to Amend License DPR-46,changing Tech Specs to Incorporate Mods to Snubbers & 4-inch Recirculation Bypass Lines.Fee Paid + (15:18:58, 13 December 2024)
- ML20093J845 + (15:19:02, 13 December 2024)
- GO2-84-528, RO Re Use of Fan Motor W/O Performing Seismic Qualification. Caused by Motor Failure on Fan WWA-FN-53A.Motor to Be Reinstalled,Qualification Obtained & Spare Motor Ordered + (15:19:03, 13 December 2024)
- ML20093J834 + (15:19:04, 13 December 2024)
- ML20093J831 + (15:19:04, 13 December 2024)
- ML20093J829 + (15:19:05, 13 December 2024)