JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS SEPTEMBER There were no unit shutdowns or significant power reductions during the month of September.

The following major ~ safety-related maintenance was performed in_ the month of September:

1.

Performed-miscellaneous corrective and preventive maintenance on diesel generators.

2.

Continued removing old fuel storage racks from the spent fuel pool.

They will be replaced by high density storage racks to increase the capacity to 1407 fuel assemblies.

t I

i l

84101 O 8

0 PDR ADOC PDR

}6 \\\\\\

DOCKET NO. 50-348 UNIT 1 DATE.10-4-84 J.D.Woodaid COMPLETED BY TELEPHONE

'(205)899-5156 SiO M I September, 19 84 DAY AVERAGE DAILY POWER LEVEL DAY' VERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) g, 812 ' _.

g7 820 2

811 13 R21

.3 m

19 820 4

813 20 871 3

niy 21 318 6

819 22 757 820 23 815 7

g 818 24 R15 819 817-9 3

10 816 26 817 RI1 27, A17

[2 811 3

819 808 13 29-819 808 822 14 30 Is 808 3g 16 816.

ELSTRUCTIONS On this form:r. list the 2versge dsdy unit power levelin MWe Net for ::ch d y in the reporting month. Compute to j

, the neare:t whole mes: watt.

(9(77) i

J O

OPERATING DATA REPORT -

V DOCKETNO. 50-348 DATE 10-4-84 COMPLETED BY T.n unnaard TELEPHONE (?n5) 00-5156)

OPERATING STATUS

1. Unit Name: J seph M. Farley - Unit 1 No n

~

(l) Cumulative data aince'

2. Reporting Period: Sep tember, 1984 12-1-77, date..of commer-
3. Licensed Thermal Power (MWt): 2652 cial operation.

860

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

829 841.8

6. Maximum Dependable Capscity (Gross MWe):

797.1

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A i

9. Power Level To Which Restricted,if Any (Net MWe): N/A

' ' ~

10. Reasons For Restrictions.If Any:

N/A 1

(-

This Mo' nth Yr..to.Date Cumulative

11. Hours In Reporting Period 720 6.575 59.903
12. Number Of Hours Reactor Was Critical 720.0 4,796.8 39,920.0
13. Reactor Reserve Shutdown Hours 0.0-0.0.

3,650.0 l

14. Hours Generator On.Line 720.0 4.712.0 38.815.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gr ss The-mal Energy G-nerated (MWH) 1,904,651 12,052,119 98,'153,645

'17. Gross Electrical Energy Generated (MWH) 617.636 3.882.190 31.225.200

18. Net Electrical Energy Generated (MWH) 585,910 3,655,732 29,356,794-
19. Unit Service Factor 100.0 71.7 64.8
20. Unit Availability Factor 100.0 71.-7 64.8
21. Unit Capacity Factor (Using MDC Net) -

102.I 69.8 61.5

22. Unit Capacity Factor (Using DER Net) 98.2 67.1 59.1
23. Unit Forced Outage Rate 0.0 1.7 c1 t 9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

M I

25. If Shut Down At End Of Repcrt Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved 08-06-77 08-09-77 INITIAL CRITICALITY INITIAL ELECTRICITY 08-20-77 08-IB-77 COMMERCIAL OPERATION 12-01-77 12-01-7-7 tu'~-)

W DOCKET NO. 50-348 UNIT SIIU1 DOWNS AND POWER REDUCTIONS UNIT N AnlE L M. Fa rl ev-Ifni t ], -

DATE oc r nha n 't toga C0&fPLET ED IIY T _ n tinn a,, a REPORT h10NTil September, 1984 TEl.EPil0NE (? n5) 999_515A -

"i

~.

.3 e 8

g5g Licensee E't.

e"1, e

r, zw=

c Cause & Curreceive No.

Date g

3g

,3 g a:

Event u?

E.1 Actionto s

'$ 0 U

Pacvent Recurrence

$b

($

N5 NCpDet #

6 TilERE WERE NO U? IT Silt TDOWN i 0 t SIGNIFICAN']

Pi )WER REDUCTIONS DURING THE MONTH OF SEPTEMBER.

/

t 2

3 4

1 F: Forced Reason:

hiethod:

Exhibit G - Instrnciions S: Scheduled A Equipinent Failure (Explain) 1 Elanual for Preparation of Data ll. Maintenance of Test 2-hfanual Scrain.

Entry Sheets fi.: 1.icensee C Refueling 3 Automatic Sciam.

Event Report (i.ER) File INUREG-1).Regulatmy Restriction 4-Oiher (lixplain!

0161)

E. Operator Training A license Exanunation F Administrative 5

G Operational Es vor (lixplain)

Exhibis I-Same Source (9/77) ll 0:hes (Explain) f


--m

~-

~

y UNITSIIU1 DOWNS ANDPOWER REDUCTIONS DOCKETNO. _50-348 UNIT NAhlE J.r._M_.Jarlev-Unit 1 I) ATE 7-84 REPORT htONill August C0hfrLETEI) IlY.J.D.Woodard TEl.EPil0NE (205)899-5156 "t.

h'8

.E E "g

E Licensee 5-r.

4 Cause & Corrective -

No.

Date g

3g 2gm Event p

gu Action to 1

t-fE gjg Report

  • g Prevent Recurrence en u 6

1

'nIERE WERE NO UN LT SHU'rDOWNS OR SIGNIFICANT POWEF REDUCTIO fS DURING DIE MONTH OF AUGUST.

i E'

j I

2 3

4 F: Forced Reason:

klethod:

Exhibit G. instructions

{

S: Scheduled A-Eqelpment Failure (Explain) 1 Ilanual fiir Preparallon of I).isa Il41aintenance of Test 241 mual Scram.

Entry Sheets for I.icensee i

C. Refueling 3 Automatic Scram.

Event Report (I.ER) Eile(NilREG-D Ilegulatory Restriction 4-Onlier (Explain) 0161)

E-Operator Training & license Examination F Administrative 5

G Operaliemal Error (Explain) thhibis I Same Source (9/77) 11 Olher (E xplain) i

M;1 ting Address Alabima Power Company 3

600 North 18th Street Post Office Box 2641 Birmingham, Alatama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building Alabar11a Powei-t'v sourvn e ectn.'

October 8, 1984 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commlssion Washington, D.C.

20555

Dear Sir:

RE: Joseph H. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the September 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a "Harrative Summary of Operating Experience" is included in the attached report. Also attached is a corrected copy of the Unit 1 Shutdowns and Powers Reductions for the month of August.

If you have any questions, please advise.

Yours very tr ll R. P. Mcdonald RPM /KVM: sam Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) a

. 1

'O l

bct Mr. 3.~M. Farley Mr. W. O. Whitt Mr. R. P. Mcdonald Mr. H. O. Thrash

' Mr. W. G. Hairston, III Mr. L. S. Williams Mr.-3. D. Woodard Mr. A. E. Hammett.

Mr. M. L.' Stoltz i

- Ms.

S.' N. Knight Mr. 3. M. Elliott Mr. 3. R. Crane Mr. B. E. Hunt Mr. L. B. Long Hr.' N. M. Horsley Ms. Sylvia Schoel tir. 3.' C. Miller Mr. Jim Brantley Mr. Mike Galley.

INPO Records Center ANI Library File: Binder Copy A-?. 1

+

1 i

i 4

y w

-e e,

w y

-r yr mus

-mm

.*-e

--ww ewa-

-,,-w.--<we-

+ ww

,,w--%$p w

e.,--w--