./ e I

m JOSEPH H. FARLEY NUCLEAR PLANT UNIT.2

- NARRATIVE

SUMMARY

OF OPERATIONS

- SEPTEMBER The unit was shut down on August 31, 1984 due to re-analysis.of 4

Cycle II-III eddy current test results which showed significant tube wall degradation in two tubes exceeding the tube plugging limit of-Technical Specification 3/4.4.6. This outage continued into the month of September. The unit.was returned to service on September 15. Other-wise, there were no unit shutdowns or significant power reductions during the month of September.

The following major safety-related maintenance wa's performed.in the month of September:

1. Plugged one tube in steam generator'2A and two tubes in steam generator 2B.

i

2. Performed miscellaneous corrective and preventive maintenance on diesel generators.
3. Replaced loop 2 downstream MSIV disk assembly due to loose

, fastener studs and tightened one loose fastener nut on loop 3 downstream MSIV.

i i

i t

Y e41017o177 840930 1 PDR ADOCK 05000364 R l pop l e --

--y e. ,.y- w w- - -w y-- -

e- ,w-- v. e -,-e-y e- w - a-e---+- y w---

l 50-364  !

Em NO.

2 UNIT _ _ _

DATE 10-4-84

.D.Woodard I COMPLETED BY .

TELEPHONE (205)899-5156 310MI September, 1984 DAY AVERAGE DAILY POWER LEVEL ' DAY' VERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) g, O g7 825-2 0 13 825 3 0 g9 829 4 0 20 831 0 21 831 5

6 0 22 818 7

0 h '

815 8

0 24 811 9 0 25- 814' 10 0 26 818 it n 77 gi9 0 816 12 23 13 0 29 815 14 0 30 822 15 40 3g 16 s74 -

INSTRUCDONS j On this form:r. list the 2verste dsily un:t power Icvelin MWe. Net for c:ch d:y in the reporting month. Compute to

, the neare:t whole me;: wast.

)

- (9(77) l

- . - - . . .- . - - -_.. -__..-_-_-_. . - _ . - . - , _ ----1

/ .

4 OPERATING DATA REPORT -

DOCKET NO. 50-364 DATE 10-4-84 COMPLETED BY -T n unadard TELEPHONE -(205)899-5156 OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 2' pt(-

. 2. Reporting Period: Sep tembe r. 1984 7-30-81, date. of, commercia:.

3. Licensed Thermal Pewer (MWt): 2652 operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829- -
6. Maximum Dependable Capacity (Gross MWe): 852.5
7. Maximum Dependable Capacity (Net MWe):

809.1 A 8.' If Changes Occur in Capacity Ratings (Items Number 3 Through 1) Since Last Report, Give Reasons: 1 N/A i '

9. Power Level To Which Restricted,if Any (Net MWe): N/A
10. Reasons For Restrictions.If Any: N/A .,

w.-

This Month Yr to.Date 'Cu'$1ulative

11. Hours In Reporting Period 720 6,575 27,816
12. Number Of Hours Reactor Was Critical - _ _

387.6 6,190.8 24,733.6

13. Reactor Reserve Shutdown Hours 0.0 . 0.0 -

138.0

14. Hours Generator On-Line 367.8 6,122.5 24,421.3 O.0 j 15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Thermal Energy Gener:=ted (MWH) 944,645 16,022,773 61,360',617 . ,

$ 17. Gross Electrical Energy Generated (MWH) 305,148 5,172,828 20,159,704 l 18. Net Electrical Energy Generated (MWH) 285.208 *

'4,919,270 '19,119,296-

19. Unit Service Factor .51.1 93.1 87.8
20. Unit Availability Factor 51.1 93.I 87.8
21. Unit Capacity Factor (Using MDC Net) 49.0 92.5 85.0
22. Unit Capacity Factor (Using DER Net) 47.8 90.3 82.9

. 23. Unit Forced Outage Rate 48.9 6.9 5.7

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and. Duration of Each n l- Refueline/ maintenance outaste, 1/4/85, approximately 'S weeks I
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Opention): Forecast Achieved j' INITIAL CRITICALITY 05-06-81 05-08-81

( 05-24-81 05-25-81 INITIAL ELECTRICITY .

COMMERCIAL OPERATION 08-01-81 07-30-81 i

go,--)

. . - _ . . _ . _ _ _ .i , . . - --, . - - ~ , . _ _ . - _ . _ . , . , . _ . . . - . ~ , _ - - . . - - ,-, - - . -

UNIT SilulDOWNS AND POWER REDUC 110NS DOCK ET NO. 50-364 UNIT NAhlE J.M.Farley-Unit 2*

DATE 10-4-84 COMPLETED lly J.D.Woodard REPORT MONiil September. 1984 TELEPilONE (2051899-5156 e.

- E E

, . ,. 5E };; j.3 E} Licensee E-r, h3 Cause & Cuisective -

No. Date g 3g g a: Event gg gu Action to -

H fE $ j ;f3 g Report # ,

in v p,,yeng g ee,,,en,,, .

0 006 840901 F 352.2 H 1 84-008-00 AB SG Unit was shut down on 8-31-84 due to re-analysis of Cycle II-III eddy cur-rent test results which showed signi-ficant tube wall degradation in two tubes exceeding the tube plugging limit of Technical Specification 3/4.4.6. This outage continued until 9-15-84.

I 2 3 4 F: Forced Reason: hlethod: Exhibit G . instructions S: Scheduled A. Equipment Failure (Explain) 1 -Alanual for Preparation of Data ll Maintenance o(Test 2 hfannal Scram. Entry Sheets for 1.icensee C Itefueling 3 Automatic Scram. Event Repost (1.Elt) File INUllEG-D.Hegulato y Restriction 4 Osher (Explain) 0161)

E Operator Training & license Examination F Administrative 5 G Operational Esror (lixplain) lish, ibis I - Same Source (9/77) ll 01hes (Explain)

~

C:l!ing Addtr*

Allbtma Powtr Comptny 600 North 18th Strzet '4 Post Office Box 2641

- Birmingham, Alabama 35291

- Telephone 205 7834090 R. P. McDor.ald Senior Vice President Flintridge Building AlabamaPower tre utrwrn e. ectr c system October 8, 1984 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the September 1984 Honthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, -

a "Harrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

1 Yours very t ly, R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) i.fi i

' ~

c: Mr. 3. M'. Farl'ey Mr. W. O. Whitt Mr. R. P. Mcdonald Mr. H. O. Thrash Mr. W. G. Hairston, III Mr. L. S. Williams Mr. 3. D. Woodard Mr. A. E. Hammett

-Mr. M. L'. Stoltz Ms. S.'N. Knight Mr. 3. M. Elliott Mr. 3. R. Crane Mr. B. E. Hunt Mr. L. B. Long ,

Mr. N. M. Horsley

Ms. Sylvia Schoel Mr. 3. C. Miller Mr. Jim Brantley Mr. Mike Calley INPO Records Center ANI Library File: Binder Copy A-2.1 e

f I

f

,,. - _ - . , , __ .,.---._r . - . .- .,- . . . . _ . . . . - . ~ . , - . , .~- ,