Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093K334 + (15:17:15, 13 December 2024)
- ML20093K330 + (15:17:16, 13 December 2024)
- HL-5041, Submits Clarification for NRC Review of USI A-46 Summary Rept + (15:17:17, 13 December 2024)
- ML20093K328 + (15:17:17, 13 December 2024)
- ML20093K319 + (15:17:18, 13 December 2024)
- ML20093K314 + (15:17:19, 13 December 2024)
- ML20093K311 + (15:17:20, 13 December 2024)
- BSEP-95-0537, Provides Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (15:17:21, 13 December 2024)
- 05000251/LER-1984-013-01, :on 840624,automatic Initiation of Auxiliary Feedwater Occurred.Caused by Steam Generator Feedwater Pump 4B Trip Due to Inadequate Suction Pressure.Unit Stabilized & Auxiliary Feedwater Secured & Reset + (15:17:22, 13 December 2024)
- ML20093K308 + (15:17:24, 13 December 2024)
- ML20093K302 + (15:17:24, 13 December 2024)
- ML20093K296 + (15:17:25, 13 December 2024)
- ML20093K293 + (15:17:26, 13 December 2024)
- ML20093K291 + (15:17:27, 13 December 2024)
- ML20093K288 + (15:17:28, 13 December 2024)
- ML20093K286 + (15:17:29, 13 December 2024)
- ML20093K283 + (15:17:32, 13 December 2024)
- ML20093K276 + (15:17:33, 13 December 2024)
- 05000388/LER-1984-018-01, :on 840908,turbine Control Valve Fast Closure Signal Generated from False Power Load Unbalance Signal. Caused by Zero Shift Pressure Transmitter PT-20107. Transmitter Recalibr + (15:17:35, 13 December 2024)
- JAFP-84-0946, Monthly Operating Rept for Sept 1984 + (15:17:36, 13 December 2024)
- ML20093K266 + (15:17:38, 13 December 2024)
- 05000271/LER-1984-020, :on 840908,failure of RCIC Inboard Steam Supply Valve Annunciation Relay Occurred.Caused by Shorting of Relay Resulting in Blown Central Power Fuse.Relay Replaced & Valve Returned to Operability + (15:17:40, 13 December 2024)
- ML20093K249 + (15:17:41, 13 December 2024)
- NRC-95-0106, Provides Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (15:17:41, 13 December 2024)
- ML20093K247 + (15:17:42, 13 December 2024)
- ML20093K242 + (15:17:43, 13 December 2024)
- ML20093K238 + (15:17:44, 13 December 2024)
- 05000348/LER-1984-020, :on 840907,control Room Fire Barrier Penetrations 01-155-02 & 06-155-03 Found Not to Be Sealed Per Tech Specs.Cause Not Stated.Penetrations Sealed & Declared Operable on 840912 + (15:17:46, 13 December 2024)
- ML20093K234 + (15:17:47, 13 December 2024)
- TXX-4235, Interim Deficiency Rept Re Installation of Curtain Fire Dampers W/O Proper Provisions for Thermal Expansion. Initially Reported on 840309.Evaluation in Progress.Next Rept Expected by 840813 + (15:17:48, 13 December 2024)
- ML20093K228 + (15:17:49, 13 December 2024)
- 05000395/LER-1984-039, :on 840907,board M Horizontal Fire Barrier Located Above Svc Water Booster Pump a Declared Inoperable Upon Discovery of Hole.Cause Not Stated.Barrier Replaced + (15:17:51, 13 December 2024)
- ML20093K222 + (15:17:52, 13 December 2024)
- ML20093K221 + (15:17:52, 13 December 2024)
- ML20093K218 + (15:17:53, 13 December 2024)
- ML20093K217 + (15:17:54, 13 December 2024)
- ML20093K215 + (15:17:54, 13 December 2024)
- RBG-18220, Interim Deficiency Rept DR-207 Re Trip Auxiliary Units for Neutron &/Or Process Radiation Supplied by Ge.Next Rept Expected by 841009 + (15:17:56, 13 December 2024)
- ML20093K213 + (15:17:56, 13 December 2024)
- NRC-84-0122, Informs That Operating Staffs Apprised of Revised Justification for Interim Operation Re Seismic Qualification of Operator Interface Modules ESE-12A + (15:17:57, 13 December 2024)
- 05000302/LER-1984-018, :on 840105,five Cells on Station Batteries Ej, Btry Failed to Meet Tech Spec Surveillance Requirement for Specific Gravity.Caused by Personnel Error + (15:17:59, 13 December 2024)
- ML20093K203 + (15:18:00, 13 December 2024)
- RBG-18224, Interim Deficiency Rept DR-206 Re Lubricant for Fuel Pool Cooling Pump & Motor.Next Rept Expected by 841009 + (15:18:01, 13 December 2024)
- ML20093K202 + (15:18:01, 13 December 2024)
- ML20093K196 + (15:18:03, 13 December 2024)
- ML20093K199 + (15:18:03, 13 December 2024)
- ML20093K194 + (15:18:04, 13 December 2024)
- RBG-18236, Interim Deficiency Rept DR-210 Re Model 510 DU Rosemount Card Files.Next Rept Expected by 841017 + (15:18:05, 13 December 2024)
- ML20093K190 + (15:18:08, 13 December 2024)
- RBG-18245, Interim Deficiency Rept DR-134 Re Four Lines Located at Outlet of Each RHR Sys HX Shell.Next Rept Expected by 840920 + (15:18:09, 13 December 2024)
- ML20093K182 + (15:18:10, 13 December 2024)