Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093N045 + (15:07:25, 13 December 2024)
- ML20093N040 + (15:07:26, 13 December 2024)
- ML20093N035 + (15:07:27, 13 December 2024)
- 05000397/LER-1984-104, :on 841004,reactor Tripped.Caused by Four Turbine Bypass Valves Fully Opening & Closing Due to Vendor Representative Removing & Replacing Circuit Card from Digital Electrohydraulic Control Cabinet + (15:07:28, 13 December 2024)
- ML20093N030 + (15:07:30, 13 December 2024)
- ML20093N028 + (15:07:31, 13 December 2024)
- NRC-95-4580, Forwards WCAP-14293,rev 1, AP600 Low Pressure Integral Sys Test at Oregon State Univ Test Analysis Rept, non- Proprietary + (15:07:33, 13 December 2024)
- ML20093N027 + (15:07:33, 13 December 2024)
- ML20093N024 + (15:07:34, 13 December 2024)
- ML20093N019 + (15:07:35, 13 December 2024)
- ML20093N018 + (15:07:37, 13 December 2024)
- ML20093N015 + (15:07:37, 13 December 2024)
- ML20093N013 + (15:07:38, 13 December 2024)
- ML20093N008 + (15:07:39, 13 December 2024)
- ML20093N005 + (15:07:40, 13 December 2024)
- ML20093M998 + (15:07:41, 13 December 2024)
- ML20093M992 + (15:07:43, 13 December 2024)
- ML20093M994 + (15:07:43, 13 December 2024)
- ML20093M990 + (15:07:44, 13 December 2024)
- ML20093M985 + (15:07:44, 13 December 2024)
- ML20093M984 + (15:07:45, 13 December 2024)
- ML20093M972 + (15:07:46, 13 December 2024)
- ML20093M968 + (15:07:47, 13 December 2024)
- ML20093M970 + (15:07:47, 13 December 2024)
- ML20093M961 + (15:07:48, 13 December 2024)
- ML20093M954 + (15:07:49, 13 December 2024)
- 05000259/LER-1984-030-01, :on 840928,block Walls in Control Bay & Reactor Bldg Identified to Have Higher Load Requirements than Calculated,Based on New Tornado Depressurization Analysis.Procedures Revised + (15:07:51, 13 December 2024)
- ML20093M915 + (15:07:58, 13 December 2024)
- ML20093M941 + (15:07:58, 13 December 2024)
- ML20093M905 + (15:07:59, 13 December 2024)
- ML20093M891 + (15:08:01, 13 December 2024)
- ML20093M884 + (15:08:02, 13 December 2024)
- ML20093M881 + (15:08:03, 13 December 2024)
- 05000280/LER-1984-016, :on 840619,automatic Reactor Trip Resulted from Exceeding 10% Power on Two of Four Nuclear Power Channels, Ni 44 & Ni 41,w/turbine Unlatched.Caused by Isolation Valve Malfunction Due to Broken Gear Pin + (15:08:05, 13 December 2024)
- ML20093M876 + (15:08:06, 13 December 2024)
- PLA-2328, Special Rept:On 840705 & 08,during Initiation Startup Test, RCS Received Six Injections of Water.Caused by RCIC Sys Actuations + (15:08:06, 13 December 2024)
- ML20093M873 + (15:08:07, 13 December 2024)
- ML20093M869 + (15:08:08, 13 December 2024)
- ML20093M870 + (15:08:08, 13 December 2024)
- 05000293/LER-1984-013, :on 840920,indications of Cracking in Area of Weld Connecting Reactor Vessel Jet Pump Instrumentation Nozzle to Jet Pump Instrumentation Identified.Caused by Band of 304SS Matl in Weld Assembly.Weld Grinded + (15:08:10, 13 December 2024)
- ML20093M864 + (15:08:11, 13 December 2024)
- ML20093M850 + (15:08:12, 13 December 2024)
- ML20093M861 + (15:08:12, 13 December 2024)
- 05000388/LER-1984-019-01, :on 840919,RHR Pump D Declared Inoperable Due to Failure to Start on Manual Initiation Signal on 840918. HPCI Sys Inoperable Due to Lube Oil Changeout.Rhr Problem Due to Misoperation of Relay Contacts + (15:08:14, 13 December 2024)
- ML20093M838 + (15:08:15, 13 December 2024)
- ML20093M827 + (15:08:16, 13 December 2024)
- ML20093M823 + (15:08:17, 13 December 2024)
- ML20093M825 + (15:08:17, 13 December 2024)
- ML20093M820 + (15:08:18, 13 December 2024)
- ML20093M814 + (15:08:19, 13 December 2024)
- ML20093M815 + (15:08:19, 13 December 2024)