Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094H563 + (14:29:53, 13 December 2024)
- ML20094H560 + (14:29:54, 13 December 2024)
- NRC-95-4589, Provides Comparison Between Wgothic Containment Integrity Analysis Model & More Traditional Few Node Style, Analysis During Initial Blowdown Portion of Containment Response Analysis + (14:29:54, 13 December 2024)
- ML20094H552 + (14:29:58, 13 December 2024)
- ML20094H553 + (14:29:58, 13 December 2024)
- ML20094H550 + (14:29:59, 13 December 2024)
- ST-HL-AE-4024, Requests Temporary Waiver of Compliance from TS 3.7.4 & 3.7.14 to Permit Outage Time for One Train of Essential Cooling Water Sys & Essential Chilled Water Sys to Be Extended for Addl 24 H to 96 H + (14:30:00, 13 December 2024)
- ML20094H547 + (14:30:00, 13 December 2024)
- ML20094H544 + (14:30:01, 13 December 2024)
- ML20094H536 + (14:30:02, 13 December 2024)
- ML20094H537 + (14:30:02, 13 December 2024)
- ML20094H529 + (14:30:03, 13 December 2024)
- ML20094H524 + (14:30:04, 13 December 2024)
- ML20094H522 + (14:30:05, 13 December 2024)
- NRC-95-0122, Transmits Proprietary re-issued GE Rept, Enrico Fermi-2 Detroit Edison Co Calibr Interval Extension Analysis for Addl Instruments. Rept Previously Submitted as Part of 930729 TS Change Request.Proprietary GE Rept Withheld + (14:30:05, 13 December 2024)
- ML20094H518 + (14:30:06, 13 December 2024)
- ML20094H512 + (14:30:06, 13 December 2024)
- ML20094H509 + (14:30:08, 13 December 2024)
- ML20094H503 + (14:30:09, 13 December 2024)
- ML20094H501 + (14:30:10, 13 December 2024)
- ML20094H500 + (14:30:11, 13 December 2024)
- ML20094H498 + (14:30:11, 13 December 2024)
- 3F1195-14, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/95-16.Corrective Actions:Placed DC Cooling to MUP-1A Under Administrative Control + (14:30:12, 13 December 2024)
- ML20094H493 + (14:30:13, 13 December 2024)
- ML20094H491 + (14:30:13, 13 December 2024)
- ML20094H490 + (14:30:14, 13 December 2024)
- ML20094H488 + (14:30:15, 13 December 2024)
- ML20094H489 + (14:30:15, 13 December 2024)
- ML20094H485 + (14:30:16, 13 December 2024)
- ML20094H483 + (14:30:17, 13 December 2024)
- ML20094H480 + (14:30:18, 13 December 2024)
- ML20094H481 + (14:30:18, 13 December 2024)
- ML20094H478 + (14:30:19, 13 December 2024)
- ML20094H477 + (14:30:20, 13 December 2024)
- ML20094H475 + (14:30:21, 13 December 2024)
- ML20094H472 + (14:30:21, 13 December 2024)
- ML20094H468 + (14:30:22, 13 December 2024)
- GL-728143-25, GLTS: Past Due General License Device Annual Registration: Kosmos Energy Gulf of Mexico Operations, LLC: RM-728143-25 + (14:30:23, 13 December 2024)
- ML20094H467 + (14:30:23, 13 December 2024)
- ML20094H465 + (14:30:25, 13 December 2024)
- ML20094H464 + (14:30:27, 13 December 2024)
- ML20094H462 + (14:30:27, 13 December 2024)
- ML20094H453 + (14:30:29, 13 December 2024)
- 05000423/LER-1995-017-02, :on 951012,TS Surveillance Was Missed Due to Programmatic Weakness & Personnel Error.Counseled Individuals Involved + (14:30:31, 13 December 2024)
- 05000277/LER-1984-011, :on 840608,acetylene Leak Occurred During Drywell Preheat Welding.Caused by Leak Where Hose Crimped to Std Screw Connection.Personnel Evacuated & Addl Ventilation Used to Expel Gas + (14:30:33, 13 December 2024)
- ML20094H428 + (14:30:34, 13 December 2024)
- ML20094H421 + (14:30:35, 13 December 2024)
- ML20094H414 + (14:30:36, 13 December 2024)
- 05000325/LER-1995-019, :on 951012,improper Matl Configuration Resulted in Inoperable RHR SW Valves.Repaired Valves & Returned to Svc + (14:30:37, 13 December 2024)
- ML20094H403 + (14:30:38, 13 December 2024)
- ML20094H402 + (14:30:39, 13 December 2024)