Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094H636 + (14:29:42, 13 December 2024)
- ML20094H619 + (14:29:44, 13 December 2024)
- ML20094H611 + (14:29:44, 13 December 2024)
- ML20094H610 + (14:29:45, 13 December 2024)
- ML20094H603 + (14:29:46, 13 December 2024)
- 3F0292-13, Forwards Rev 3 to Cycle 8 Core Operating Limits Rept, Per Generic Ltr 88-16.Clarifies Timing of Reporting Requirements in NRC SER for Amend 125 & TS 6.9.1.7 + (14:29:47, 13 December 2024)
- ML20094H593 + (14:29:48, 13 December 2024)
- ML20094H592 + (14:29:48, 13 December 2024)
- ML20094H586 + (14:29:50, 13 December 2024)
- ML20094H583 + (14:29:50, 13 December 2024)
- RBG-36585, Forwards Notification of Unusual Event.On 920305,high Winds Damaged Turbine Bldg Due to Tornado.Plant Access Limited to Essential Personnel as Precautionary Measure & Sitewide Surveys Performed for Possible Contamination + (14:29:51, 13 December 2024)
- ML20094H578 + (14:29:52, 13 December 2024)
- ML20094H580 + (14:29:52, 13 December 2024)
- ML20094H563 + (14:29:53, 13 December 2024)
- ML20094H560 + (14:29:54, 13 December 2024)
- NRC-95-4589, Provides Comparison Between Wgothic Containment Integrity Analysis Model & More Traditional Few Node Style, Analysis During Initial Blowdown Portion of Containment Response Analysis + (14:29:54, 13 December 2024)
- ML20094H552 + (14:29:58, 13 December 2024)
- ML20094H553 + (14:29:58, 13 December 2024)
- ML20094H550 + (14:29:59, 13 December 2024)
- ST-HL-AE-4024, Requests Temporary Waiver of Compliance from TS 3.7.4 & 3.7.14 to Permit Outage Time for One Train of Essential Cooling Water Sys & Essential Chilled Water Sys to Be Extended for Addl 24 H to 96 H + (14:30:00, 13 December 2024)
- ML20094H547 + (14:30:00, 13 December 2024)
- ML20094H544 + (14:30:01, 13 December 2024)
- ML20094H536 + (14:30:02, 13 December 2024)
- ML20094H537 + (14:30:02, 13 December 2024)
- ML20094H529 + (14:30:03, 13 December 2024)
- ML20094H524 + (14:30:04, 13 December 2024)
- ML20094H522 + (14:30:05, 13 December 2024)
- NRC-95-0122, Transmits Proprietary re-issued GE Rept, Enrico Fermi-2 Detroit Edison Co Calibr Interval Extension Analysis for Addl Instruments. Rept Previously Submitted as Part of 930729 TS Change Request.Proprietary GE Rept Withheld + (14:30:05, 13 December 2024)
- ML20094H518 + (14:30:06, 13 December 2024)
- ML20094H512 + (14:30:06, 13 December 2024)
- ML20094H509 + (14:30:08, 13 December 2024)
- ML20094H503 + (14:30:09, 13 December 2024)
- ML20094H501 + (14:30:10, 13 December 2024)
- ML20094H500 + (14:30:11, 13 December 2024)
- ML20094H498 + (14:30:11, 13 December 2024)
- 3F1195-14, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/95-16.Corrective Actions:Placed DC Cooling to MUP-1A Under Administrative Control + (14:30:12, 13 December 2024)
- ML20094H493 + (14:30:13, 13 December 2024)
- ML20094H491 + (14:30:13, 13 December 2024)
- ML20094H490 + (14:30:14, 13 December 2024)
- ML20094H488 + (14:30:15, 13 December 2024)
- ML20094H489 + (14:30:15, 13 December 2024)
- ML20094H485 + (14:30:16, 13 December 2024)
- ML20094H483 + (14:30:17, 13 December 2024)
- ML20094H480 + (14:30:18, 13 December 2024)
- ML20094H481 + (14:30:18, 13 December 2024)
- ML20094H478 + (14:30:19, 13 December 2024)
- ML20094H477 + (14:30:20, 13 December 2024)
- ML20094H475 + (14:30:21, 13 December 2024)
- ML20094H472 + (14:30:21, 13 December 2024)
- ML20094H468 + (14:30:22, 13 December 2024)
- GL-728143-25, GLTS: Past Due General License Device Annual Registration: Kosmos Energy Gulf of Mexico Operations, LLC: RM-728143-25 + (14:30:23, 13 December 2024)
- ML20094H467 + (14:30:23, 13 December 2024)