Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094N451 + (14:10:27, 13 December 2024)
- ML20094N443 + (14:10:29, 13 December 2024)
- ML20094N435 + (14:10:32, 13 December 2024)
- ML20094N432 + (14:10:33, 13 December 2024)
- ML20094N429 + (14:10:34, 13 December 2024)
- ML20094N430 + (14:10:34, 13 December 2024)
- ML20094N426 + (14:10:35, 13 December 2024)
- ML20094N421 + (14:10:36, 13 December 2024)
- ML20094N419 + (14:10:36, 13 December 2024)
- ML20094N417 + (14:10:37, 13 December 2024)
- ML20094N412 + (14:10:38, 13 December 2024)
- ML20094N414 + (14:10:38, 13 December 2024)
- ML20094N408 + (14:10:42, 13 December 2024)
- ML20094N407 + (14:10:43, 13 December 2024)
- ELV-02853, Requests Change to QA Program,Described in Encl FSAR Sections,Providing for Biennial QA Audits of Plant Procedural Development & Maint Program Utilizing Representative Sampling Process + (14:10:44, 13 December 2024)
- ML20094N405 + (14:10:44, 13 December 2024)
- TXX-4183, Responds to Re Plug Welds in Spread Room.Visual Insp Will Be Performed Using Methods Similar to Those Described in Addendum to 840424 Testimony.Program Requiring Repair Instructions & QC Insp Followed + (14:10:45, 13 December 2024)
- ML20094N402 + (14:10:46, 13 December 2024)
- 2CAN039203, Requests Extension from 920331 to 920501 to Respond to NRC Request for Addl Info Re First Ten Yr ISI Relief Requests Extension Needed Due to Competitive Projects Involving Safety or Outage Support + (14:10:47, 13 December 2024)
- ML20094N398 + (14:10:48, 13 December 2024)
- ML20094N397 + (14:10:49, 13 December 2024)
- ML20094N390 + (14:10:50, 13 December 2024)
- ML20094N389 + (14:10:51, 13 December 2024)
- RBG-18520, Interim Deficiency Rept DR-216 Re Electrical Penetrations Supplied by Conax Corp.Next Rept Will Be Provided by 841009 + (14:10:52, 13 December 2024)
- ML20094N383 + (14:10:52, 13 December 2024)
- ML20094N382 + (14:10:53, 13 December 2024)
- ML20094N380 + (14:10:54, 13 December 2024)
- ML20094N378 + (14:10:54, 13 December 2024)
- ML20094N377 + (14:10:55, 13 December 2024)
- ML20094N372 + (14:10:58, 13 December 2024)
- ML20094N367 + (14:10:59, 13 December 2024)
- ML20094N366 + (14:11:00, 13 December 2024)
- ML20094N363 + (14:11:01, 13 December 2024)
- ML20094N355 + (14:11:02, 13 December 2024)
- TXX-4250, Interim Deficiency Rept SDAR-140 Re Qualification of Main Steam Relief Valves for Actual Loading Conditions.Initially Reported on 840710.Evaluation in Progress & Should Be Completed by 840831 + (14:11:02, 13 December 2024)
- 05000289/LER-1984-004-02, :on 830602,tube A-135-72 Not Plugged & Tube A-134-74 Found in Tube A-135-72 Location.Correct Tube Plugged & All Other Tubes Verified + (14:11:04, 13 December 2024)
- ML20094N346 + (14:11:06, 13 December 2024)
- ML20094N343 + (14:11:07, 13 December 2024)
- ML20094N340 + (14:11:07, 13 December 2024)
- 05000483/LER-1984-015, :on 840716,pressure Transient Occurred in RCS as Result of Loss of Instrument Air.To Reduce Pressure,Porv Cycled Manually.Instrument Air Lost Again & PORV Actuated Automatically + (14:11:09, 13 December 2024)
- ML20094N335 + (14:11:11, 13 December 2024)
- ML20094N334 + (14:11:12, 13 December 2024)
- ML20094N329 + (14:11:15, 13 December 2024)
- ML20094N322 + (14:11:16, 13 December 2024)
- ML20094N327 + (14:11:16, 13 December 2024)
- ML20094N321 + (14:11:17, 13 December 2024)
- ML20094N316 + (14:11:21, 13 December 2024)
- 05000388/LER-1984-012-01, :840709,core Spray Logic Control Power Fuses Removed Since Fuses Thought to Be Possible Blocking Point for Personnel Protection.Removal Affected Listed Equipment. Fuses Reinstalled + (14:11:23, 13 December 2024)
- ML20094N314 + (14:11:24, 13 December 2024)
- ML20094N312 + (14:11:25, 13 December 2024)
- JPN-92-017, Summarizes Status of Action Items Agreed to in 920123 Telcon Re Engineering Insp 50-333/92-02.Review of 11 Mods W/Respect to Listed Programmatic Issues & QA Cat I Major Mods Installed During 1990 Refueling Outage Complete + (14:11:26, 13 December 2024)