Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-1109, Responds to NRC Re Violations Noted in IE Insp Repts 50-498/84-04 & 50-499/84-04.Corrective Actions:Site Std for Nonconformance Reporting Revised + (13:58:09, 13 December 2024)
- ML20094R863 + (13:58:10, 13 December 2024)
- 05000458/LER-1995-009-02, :on 951101,surveillance Was Missed Due to Error in Change of Surveillance Test Interval Scheduling.Caused by Human Error & Inadequate Review.Discussed Inappropriate Schedule Frequency Change + (13:58:12, 13 December 2024)
- ML20094R832 + (13:58:14, 13 December 2024)
- ML20094R854 + (13:58:14, 13 December 2024)
- ML20094R831 + (13:58:15, 13 December 2024)
- 05000325/LER-1992-007, :on 920310,12 H Noble Gas Grab Sample for Reactor Bldg Radioactive Gaseous Effluent Monitoring Instrumentation Overdue.Caused by Chemistry Technician Error.Use of Nonroutine Log Enhanced + (13:58:17, 13 December 2024)
- ML20094R790 + (13:58:18, 13 December 2024)
- ML20094R824 + (13:58:18, 13 December 2024)
- ML20094R777 + (13:58:20, 13 December 2024)
- 05000331/LER-1995-011, :on 951019,during Surveillance Test Procedure, a Sdg Outboard Bearing Temp Reached 205 F.Caused by Incorrectly Installed Room Temp Controller.Controller Reconfigured + (13:58:21, 13 December 2024)
- 0CAN119505, Forwards Response to NRC Ltr Re Violations Noted in Insp Repts 50-313/95-07 & 50-368/95-07 on 950806-0916.Corrective Actions:Mgt Relayed Expectations of Event as Well as Overall Procedure Compliance to Individual Involved in Event + (13:58:22, 13 December 2024)
- TAC:48490 + (13:58:23, 13 December 2024)
- 05000443/LER-1995-006, :on 951030,unit Operated Above Maximum Thermal Power Level.Caused by Inadequate Procedure That Did Not Ensure That re-normalization Was Considered After Transmitter Recalibration.Revised Procedures + (13:58:25, 13 December 2024)
- ML20094R747 + (13:58:27, 13 December 2024)
- ML20094R739 + (13:58:28, 13 December 2024)
- ML20094R740 + (13:58:28, 13 December 2024)
- 05000301/LER-1995-005-01, :on 951025,plugged 46 Tubes Due to Degradation in Roll Transition,Tubesheet Crevice & Tube Support Plate Regions.Performed Closeout Insps Following Maint of Each Sg + (13:58:31, 13 December 2024)
- 05000366/LER-1995-008, :on 951102,RV Inventory Loss Resulted in Unplanned ESF Sys Actuations.Revised Procedures & Drawings, Corrected Label,Reset LS-14,checked Limit Switches & Tested Valve Interlock Logic + (13:58:33, 13 December 2024)
- 3F1195-25, Submits Discussion in Response to Concerns Re Proposed TS Change Request to Extend Most Refueling Interval Surveillances to 24 Months.Revised Copies of Instrument Drift Studies Included in Original Submittal Attached Also + (13:58:35, 13 December 2024)
- 05000366/LER-1995-006-02, :on 951030,personnel Error Resulted in Automatic Start of EDG 1B.Labeled PT Compartment Doors & Training Test Engineers on Event + (13:58:36, 13 December 2024)
- 05000339/LER-1995-003-03, :on 951106,containment Personnel Air Lock Outer Door Was Open & Uncapped.Caused by Failure of Individuals to Adhere to Set of Performance Stds for Implementing Work at Power Station.Disqualified Personnel Involved + (13:58:38, 13 December 2024)
- 05000271/LER-1995-018, :on 950929,discovered Inadequate IST Surveillance & RG 1.97 Submittal Info on Recirculation Loop Sample Line Isolation Valves Due to Misinterpretation of Existing Design Configuration.Tagged Switches + (13:58:41, 13 December 2024)
- 05000458/LER-1992-005, :on 920305,reactor Trip Occurred on Turbine Control Valve Fast Closure.Caused by High Winds During Thunderstorm,Resulting in phase-to-ground Fault.Damaged Transformer Reworked + (13:58:43, 13 December 2024)
- ML20094R710 + (13:58:44, 13 December 2024)
- ML20094R700 + (13:58:45, 13 December 2024)
- ML20094R698 + (13:58:46, 13 December 2024)
- JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles + (13:58:47, 13 December 2024)
- ML20094R672 + (13:58:48, 13 December 2024)
- BSEP-95-0536, Informs NRC of Util Intent to Convert Current TS of Plant to Format Contained in NUREG-1433, Sts,Ge Plants,BWR/4, Rev 1 + (13:58:49, 13 December 2024)
- ML20094R639 + (13:58:50, 13 December 2024)
- ML20094R634 + (13:58:51, 13 December 2024)
- 05000334/LER-1984-007, :on 840704,containment Recirculation Cooling Coils Chilled Water Sys Outlet Isolation Valve Failed Shut, Causing Containment Temp to Reach 105.08 F.Caused by Failed Pneumatic Valve Diaphragm + (13:58:53, 13 December 2024)
- 05000334/LER-1984-008, :on 840706,reactor Shutdown Bank Rods Tripped on Pressurizer Low Pressure Trip Signal.Caused by Surveillance Test Performed W/Reactor Trip Breakers Closed. Personnel Counseled.Procedure to Be Revised + (13:58:55, 13 December 2024)
- BVY-95-126, Documents Actions Taken by Util to Evaluate Small Leak in Svc Water Piping & Request Relief from Requirement to Perform Immediate Code Repair,Per GL 95-05 + (13:58:57, 13 December 2024)
- ML20094R596 + (13:58:58, 13 December 2024)
- ML20094R593 + (13:58:58, 13 December 2024)
- ML20094R592 + (13:59:00, 13 December 2024)
- B15462, Provides Revised Repair Plan Re Check Valve 3RCS*V146 + (13:59:01, 13 December 2024)
- ML20094R572 + (13:59:02, 13 December 2024)
- ML20094R573 + (13:59:02, 13 December 2024)
- PY-CEI-NRR-2005, Advises That Investigation Has Been Conducted Into Denial of Site Access Concerns at Facility + (13:59:03, 13 December 2024)
- ML20094R567 + (13:59:04, 13 December 2024)
- ML20094R553 + (13:59:05, 13 December 2024)
- ML20094R563 + (13:59:05, 13 December 2024)
- ML20094R535 + (13:59:06, 13 December 2024)
- ML20094R532 + (13:59:07, 13 December 2024)
- HL-5079, Forwards Rev 2 to Ei Hatch Nuclear Plant Unit 1,Cycle 16 COLR & Rev 0 to Ei Hatch Nuclear Plant Unit 2,Cycle 13 Colr + (13:59:08, 13 December 2024)
- 05000271/LER-1995-017, :on 950922,TS 4.6.E Was Not Met Due to Components Not Included in IST Program Scope.Performed Comprehensive Review of IST Program Scope to Verify Compliance W/Asme/Ansi OMa-1988 Parts 1,6 & 10 + (13:59:13, 13 December 2024)
- 05000336/LER-1995-041, :on 951030,SI & Containment Spray Sys Valves Operational Readiness Test Identified Potential for Placing EDG in Overloaded Condition.Caused by Deficient Procedure. Implemented Procedure Change to Sp 21136 + (13:59:15, 13 December 2024)
- ML20094R513 + (13:59:16, 13 December 2024)