Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1477, Forwards Cleveland Electric Illuminating Co 1991 Annual Rept, Centerior Energy 1991 Annual Rept & Toledo Edison Co 1991 Annual Rept. Sec Form 10-K Also Encl + (13:32:34, 13 December 2024)
- ML20095F886 + (13:32:35, 13 December 2024)
- ML20095F881 + (13:32:36, 13 December 2024)
- ML20095F871 + (13:32:37, 13 December 2024)
- ML20095F874 + (13:32:37, 13 December 2024)
- ML20095F845 + (13:32:38, 13 December 2024)
- L-84-213, Forwards Responses to Notice of Violation & Proposed Imposition of Civil Penalty.Corrective Actions Include Implementation of Performance Enhancement Program to Address Concerns Re Mgt Control of Operation.Penalty Paid + (13:32:39, 13 December 2024)
- ML20095F840 + (13:32:39, 13 December 2024)
- ELV-03576, Application for Amends to Licenses NPF-68 & NPF-81 to Revise TS 4.3.4.2.d Re Periodic Disassembly & Exam of Valves Associated W/Turbine Overspeed Protection Sys + (13:32:40, 13 December 2024)
- ML20095F795 + (13:32:48, 13 December 2024)
- ML20095F812 + (13:32:48, 13 December 2024)
- ML20095F792 + (13:32:50, 13 December 2024)
- ML20095F787 + (13:32:51, 13 December 2024)
- ML20095F781 + (13:32:59, 13 December 2024)
- ML20095F774 + (13:33:06, 13 December 2024)
- TXX-4274, Forwards marked-up Proposed Tech Spec Changes Re Remote Shutdown Instrumentation,Fire Detection Instrumentation,Fire Suppression Sys & Liquid Effluents + (13:33:07, 13 December 2024)
- ML20095F761 + (13:33:15, 13 December 2024)
- ML20095F754 + (13:33:16, 13 December 2024)
- ML20095F752 + (13:33:17, 13 December 2024)
- ML20095F751 + (13:33:18, 13 December 2024)
- ML20095F750 + (13:33:18, 13 December 2024)
- ML20095F742 + (13:33:19, 13 December 2024)
- ML20095F735 + (13:33:20, 13 December 2024)
- ST-HL-AE-1115, Opposes Requirement Re Designing for Arbitrary Intermediate Breaks.Approval for Listed Alternative Pipe Break Criteria Requested,Excluding RCS Primary Loop.Addl Info Supporting Request Encl + (13:33:21, 13 December 2024)
- ML20095F724 + (13:33:22, 13 December 2024)
- ML20095F709 + (13:33:23, 13 December 2024)
- 3F1295-14, Conveys Acceptance of Results NRC Presented at 951031 Meeting of SALP Evaluation for Facility & Util Commitment to Address Issues Noted + (13:33:24, 13 December 2024)
- ML20095F705 + (13:33:24, 13 December 2024)
- JPN-95-053, Forwards Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code + (13:33:25, 13 December 2024)
- ML20095F690 + (13:33:26, 13 December 2024)
- ML20095F660 + (13:33:40, 13 December 2024)
- ML20095F655 + (13:33:41, 13 December 2024)
- ML20095F618 + (13:34:06, 13 December 2024)
- AECM-84-0364, Responds to NRC Re Violations Noted in Insp Rept 50-416/84-16.Corrective Actions:Safety & Environ Evaluation Performed,Procedures for Work Control to Be Revised & Site QA Audit Rept Reviewed + (13:34:07, 13 December 2024)
- PY-CEI-NRR-0135, Forwards Addl Clarifications to Rev 3 to Emergency Plan OM-15A Submitted on 840428.Clarifications Include Changes to Plan Per Sser 4 & Will Be Incorporated Into Rev 4 + (13:34:08, 13 December 2024)
- ML20095F607 + (13:34:08, 13 December 2024)
- ML20095F602 + (13:34:09, 13 December 2024)
- ML20095F597 + (13:34:10, 13 December 2024)
- L-84-178, Responds to NRC Re Violations Noted in Insp Repts 50-250/84-14 & 50-251/84-14.Corrective Actions:Tracking Sys Developed to Ensure That All License Amend Requirements Will Be Met During Implementation Process + (13:34:11, 13 December 2024)
- ML20095F589 + (13:34:12, 13 December 2024)
- ML20095F586 + (13:34:19, 13 December 2024)
- ML20095F576 + (13:34:20, 13 December 2024)
- ML20095F544 + (13:34:26, 13 December 2024)
- ML20095F538 + (13:34:27, 13 December 2024)
- BVY-95-139, Forwards Rev 3 of Cycle 18,COLR, for VT Yankee Power Station + (13:34:28, 13 December 2024)
- L-84-173, Responds to NRC Re Violations Noted in Insp Repts 50-335/84-18 & 50-389/84-19.Corrective Actions: Installed Detectors Will Be Replaced & Two Spare Detectors Properly Calibr + (13:34:28, 13 December 2024)
- PY-CEI-NRR-2010, Monthly Operating Rept for Nov 1995 for Perry Nuclear Power Plant Unit 1 + (13:34:29, 13 December 2024)
- LIC-95-0233, Monthly Operating Rept for Nov 1995 for FCS Unit 1 + (13:34:30, 13 December 2024)
- ML20095F520 + (13:34:31, 13 December 2024)
- ML20095F511 + (13:34:31, 13 December 2024)
- ML20095F501 + (13:34:36, 13 December 2024)