Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095J256 + (13:23:06, 13 December 2024)
- ML20095J250 + (13:23:07, 13 December 2024)
- ML20095J247 + (13:23:08, 13 December 2024)
- ML20095J242 + (13:23:09, 13 December 2024)
- ML20095J239 + (13:23:10, 13 December 2024)
- NRC-95-0139, Responds to Informal Request for Info Re Use of Historical Plant Drift Data in Calculating Nominal Trip Setpoints for Extended Surveillance Intervals + (13:23:10, 13 December 2024)
- ML20095J237 + (13:23:11, 13 December 2024)
- ML20095J232 + (13:23:12, 13 December 2024)
- LD-92-056, Forwards Rev 0 to Design Alternatives for Sys 80+ Nuclear Power Plant, Per Commitment in + (13:23:13, 13 December 2024)
- ML20095J231 + (13:23:13, 13 December 2024)
- ML20095J227 + (13:23:14, 13 December 2024)
- ML20095J226 + (13:23:15, 13 December 2024)
- 05000282/LER-1992-006, :on 920326,design Deficiency Identified That Could Result in Loss of Pressurizer Level in Indicating Range in Event of Catastrophic Fire in Cr.Detailed Analysis Will Be Performed + (13:23:16, 13 December 2024)
- ML20095J220 + (13:23:17, 13 December 2024)
- ML20095J219 + (13:23:18, 13 December 2024)
- ML20095J211 + (13:23:19, 13 December 2024)
- ML20095J214 + (13:23:19, 13 December 2024)
- ML20095J204 + (13:23:20, 13 December 2024)
- ML20095J193 + (13:23:20, 13 December 2024)
- ML20095J192 + (13:23:21, 13 December 2024)
- ML20095J189 + (13:23:22, 13 December 2024)
- ML20095J185 + (13:23:23, 13 December 2024)
- ML20095J183 + (13:23:24, 13 December 2024)
- ML20095J175 + (13:23:24, 13 December 2024)
- 05000498/LER-1995-011, :on 951121,determined That Train B CR Makeup & Cleanup Filtration Sys Carbon Filters Had Not Met TS SRs for Period of 14 Days Between 951101-11 Due to Inadequate Design of Deluge Sys.Filters Replaced + (13:23:26, 13 December 2024)
- ML20095J173 + (13:23:27, 13 December 2024)
- 05000373/LER-1995-018-03, :on 951128,1B RPS M/G Set Tripped Resulting in Half Scram Due to Relay failure.1B RPS M/G Set 1C71-S001B-1K Relay Replaced & Normally Energized Model CR120A Relay in M/G Sets 1A,2A & 2B Will Be Replaced + (13:23:29, 13 December 2024)
- ML20095J161 + (13:23:30, 13 December 2024)
- ST-HL-AE-5259, Forwards mark-ups of Proposed Changes to TS 3.10.8,based on Discussions W/Nrc Re Util 950501 Proposed Amend Request to Include Special Test Exception for Allowed Outage of Up to 21 Days Per Cycle for Each Standby Diesel + (13:23:30, 13 December 2024)
- ML20095J154 + (13:23:31, 13 December 2024)
- ML20095J153 + (13:23:33, 13 December 2024)
- ML20095J138 + (13:23:34, 13 December 2024)
- ML20095J148 + (13:23:34, 13 December 2024)
- ML20095J135 + (13:23:35, 13 December 2024)
- ML20095J132 + (13:23:35, 13 December 2024)
- ML20095J130 + (13:23:36, 13 December 2024)
- ML20095J120 + (13:23:37, 13 December 2024)
- ML20095J125 + (13:23:37, 13 December 2024)
- ML20095J114 + (13:23:38, 13 December 2024)
- 05000282/LER-1992-005-01, :on 920326,design Basis Reconstitution Effort Identified Condition Outside 10CFR50,App R Requirements. Caused by Potential Circuit Failure Mode Not Recognized During Development.Procedure Revised + (13:23:40, 13 December 2024)
- ML20095J112 + (13:23:41, 13 December 2024)
- 05000306/LER-1992-003-03, :on 920326,auto Start of Motor Driven Auxiliary Feedwater Pump Occurred.Caused by Personnel Error.Procedures Changed to Specify Pump Numbers + (13:23:42, 13 December 2024)
- ML20095J107 + (13:23:43, 13 December 2024)
- RBG-42305, Interim Special Rept:On 951212,during Two Prestart Air Roll Attempts,Div I EDG Failed to Reach Satisfactory Rotational Speed.Suspected Cause of Unsuccessful Air Rolls Believed to Be Mechanical Malfunction of 4 Air Admission Valve + (13:23:44, 13 December 2024)
- ML20095J094 + (13:23:47, 13 December 2024)
- ML20095J099 + (13:23:47, 13 December 2024)
- ML20095J073 + (13:23:49, 13 December 2024)
- ML20095J067 + (13:23:49, 13 December 2024)
- RBG-42308, Forwards Summary Rept of NOUE Declared at Facility on 951219 Due to Unidentified Drywell Leakage Increase Above TS 3.4.5 Limit of 5.0 Gpm.Leak Secured & NOUE Terminated + (13:23:50, 13 December 2024)
- B15461, Application for Amend to License DPR-65 Re RT Setpoints + (13:23:51, 13 December 2024)
- ML20095J058 + (13:23:55, 13 December 2024)