ML20095J247

From kanterella
Jump to navigation Jump to search
Forwards Revised TS Page to 951016 Application for Amend, Allowing Use of Option B of 10CFR50,App J for Type B & C Testing
ML20095J247
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/22/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095J248 List:
References
LCV-0679-A, LCV-679-A, NUDOCS 9512270019
Download: ML20095J247 (2)


Text

.

Georgia Power Company

[

i ~

0' 40 inverness Center Parkway Post Offce Box 1295 Birmingham, Alabama 35201

' Te'ephone 205 877-7122 A

C. K. McCoy Georgia Power

&'P$oj ~" '

tre souttuxn etecuc system December 22, 1995 4

Docket Nos. 50-424 LCV-0679-A i

50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ALLOW TYPE B AND C TESTS FOR REFUELING OUTAGE 1R6 TO BE CONDUCTED IN ACCORDANCE WITH 10 CFR 50 APPENDIX J OPTION B Gentlemen:

By letter dated October 16,1995, Georgia Power Company (GPC) proposed to revise the Vogtle Electric Generating Plant Unit 1 Technical Specifications (TS) to allow use of Option B of 10 CFR 50 Appendix J for Type B and C testing. The proposed change added a footnote to TS 4.6.1.2.d stating that the Type B and C tests scheduled for refueling outage IR6 will be conducted in accordance with Option B of 10 CFR 50, Appendix J, and using the guidance of Regulatory Guide 1.163, Revision O. However, the current version of Regulatory Guide 1.163 is not identified as Revision 0. The current version of Regulatory Guide 1.163 is identified by date, i. e., September 1995. Therefore, at the request of the NRC staff, GPC will revise our proposed footnote to TS 4.6.1.2.d to reference Regulatory Guide 1.163, September 1995. A revised marked-up page is attached for your use.

C. K. McCoy CKM/NJS E'700 58

~9512270019 951222' g

PDR ADOCK 05000424 P_,,,__,_ _ _PDR

- - =.

l j

c.

~

U. S. Nuclear Regulatory Commission LCV-0679-A Page 2 i

l Attachment

. xc: Georgia Power Comnany Mr. J. B. Beasley, Jr.