Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-3942, Partially Deleted Ltr Re Phase II Security Measures During Remodeling of Maint Operations Facility to Begin on 911215 + (13:12:03, 13 December 2024)
- LD-92-003, Discusses Eh Kennedy 920110 Response to NRC Questions on 80+ Electrical Distribution Sys.Supports EPRI Effort to Reach Agreement W/Nrc on cost-effective Design That Meets Needs of Util & NRC Requirements + (13:12:04, 13 December 2024)
- ST-HL-AE-4089, Informs That Encl Ltrs & 13,respectively Re Security Measures Associated W/Temporary Const & Util Response to Notice of Violation 91-21,determined to Contain Safeguards Info Per 10CFR73.21(b) + (13:12:04, 13 December 2024)
- ML20096A712 + (13:12:05, 13 December 2024)
- 05000366/LER-1995-010, :on 951206,partial Group 1 PCIS Isolation Signal on MSL High Radiation Received Due to Component Failure.Flow Rate Monitor Replaced & New Monitor & FCV Controller Verified to Be Functioning Properly + (13:12:07, 13 December 2024)
- ML20096A696 + (13:12:08, 13 December 2024)
- ML20096A697 + (13:12:08, 13 December 2024)
- ML20096A695 + (13:12:09, 13 December 2024)
- ML20096A691 + (13:12:10, 13 December 2024)
- ML20096A683 + (13:12:12, 13 December 2024)
- ML20096A688 + (13:12:12, 13 December 2024)
- ML20096A682 + (13:12:13, 13 December 2024)
- 05000423/LER-1995-020-02, :on 951202,discovered Leak on Valve Stem leak-off Pipe for RHR Supply from RCS Loop a Inboard Isolation Valve.Caused by Mechanical Damage Resulting from Tensile Overboard.Removed Pipe & Valve Weld + (13:12:17, 13 December 2024)
- ML20096A669 + (13:12:19, 13 December 2024)
- 05000298/LER-1992-006, :on 920407,250-volt Battery Charger 1B Input Breaker Tripped.On 920408,250-volt Battery Charger 1A Tripped.Charger 1A Trip Due to Inadequate Preventive Maint. Relay K-3 Replaced & Calibr + (13:12:21, 13 December 2024)
- ML20096A659 + (13:12:25, 13 December 2024)
- ML20096A661 + (13:12:25, 13 December 2024)
- ML20096A655 + (13:12:26, 13 December 2024)
- ML20096A654 + (13:12:27, 13 December 2024)
- ML20096A653 + (13:12:28, 13 December 2024)
- ML20096A652 + (13:12:29, 13 December 2024)
- ML20096A651 + (13:12:30, 13 December 2024)
- NRC-95-4609, Forwards Nonproprietary & Proprietary Presentation Matls from 951206 Meeting on AP600 Containment Test & Analysis Program Activities.Proprietary Presentation Matls Withheld Per 10CFR2.790 + (13:12:31, 13 December 2024)
- ML20096A646 + (13:12:32, 13 December 2024)
- ML20096A644 + (13:12:32, 13 December 2024)
- ML20096A639 + (13:12:33, 13 December 2024)
- ML20096A637 + (13:12:34, 13 December 2024)
- 05000277/LER-1992-006, :on 920407,reactor Scram Initiated When Weld Leak Discovered on 1-inch Vent Line & Line Could Not Be Isolated.Caused by High Frequency Vibration on Line.Scram & Isolation Logics Reset & Weld Repaired + (13:12:35, 13 December 2024)
- ML20096A628 + (13:12:38, 13 December 2024)
- ML20096A626 + (13:12:39, 13 December 2024)
- 05000277/LER-1992-007, :on 920407,determined That Monthly Samples of Reactor Bldg Ventilation Stack & Main Stack Sys Particulate Filters Not Analyzed for Alpha/Beta Activity.Caused by Loss of Samples by Teledyne.Storage Revised + (13:12:41, 13 December 2024)
- ML20096A619 + (13:12:42, 13 December 2024)
- ML20096A612 + (13:12:42, 13 December 2024)
- 05000456/LER-1995-018-04, :on 951207,manual Reactor Trip Inserted During Rod Control Sys Testing Following Failure of Shutdown Rod D-2 to Withdraw on Demand.Fuse Holders Cleaned & Fuses Replaced + (13:12:44, 13 December 2024)
- ML20096A604 + (13:12:45, 13 December 2024)
- ML20096A598 + (13:12:46, 13 December 2024)
- ML20096A592 + (13:12:46, 13 December 2024)
- RBG-18-659, Forwards Responses to SER Outstanding Issue 18 & Confirmatory Item 59 & Re Emergency Action Levels & Emergency Medical Assistance Program + (13:12:47, 13 December 2024)
- ML20096A570 + (13:12:47, 13 December 2024)
- ML20096A552 + (13:12:48, 13 December 2024)
- ML20096A546 + (13:12:49, 13 December 2024)
- ML20096A544 + (13:12:49, 13 December 2024)
- 05000456/LER-1995-017-04, :on 951207,manual Reactor Trip Inserted During Rod Control Sys Testing Following Receipt of Urgent Failure Alarm on S/D Bank E.Suspect Failure Detector Card Replaced in Power Cabinet for S/D Banks C,D & E + (13:12:51, 13 December 2024)
- A04114, Informs of Util Intention to Submit Revised Tech Specs by 841031 Delineating Surveillance Requirements for Auxiliary Feedwater Automatic Initiation & Changes Re Review of Generic Ltr 83-37,per NRC 840613 Request + (13:12:52, 13 December 2024)
- ML20096A535 + (13:12:53, 13 December 2024)
- ML20096A531 + (13:12:54, 13 December 2024)
- ML20096A529 + (13:12:54, 13 December 2024)
- CY-84-024, FOIA Request That SECY-84-29 & Encl of Pl William Re Functional Description of Safety Parameter Display Sys Be Placed in PDR + (13:12:55, 13 December 2024)
- ML20096A514 + (13:12:56, 13 December 2024)
- ML20096A518 + (13:12:56, 13 December 2024)
- ML20096A512 + (13:12:57, 13 December 2024)