Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-0133, Forwards Info Clarifying SER Outstanding Issue 4 Re Environ Qualification Program at Facility.Info Relates to Topics Reviewed During Jan Audit & 840507 Response to NRC on Rev 1 to GE Rept NEDE-24326 + (11:51:52, 13 December 2024)
- ML20098H013 + (11:51:53, 13 December 2024)
- LD-84-055, Advises That Requested Addl Info Re SER Confirmatory Issue 4 Listed in Suppl 2 to NUREG-0852 Concerning Inadequate Core Cooling Instrumentation Will Be Submitted by Dec 1984 + (11:51:54, 13 December 2024)
- ML20098H011 + (11:51:55, 13 December 2024)
- ML20098H009 + (11:51:56, 13 December 2024)
- PY-CEI-NRR-0144, Responds to 840319 Request for Addl Info on NRC Question 210.15 Re Use of Stiff Piping Clamps in ASME Piping Sys. Listing of Stiff Pipe Clamp Applications & Evaluation of Effects Encl + (11:51:57, 13 December 2024)
- W3P84-2840, Forwards Executed DOE Contract Re Disposal of Spent Fuel &/Or High Level Waste + (11:51:57, 13 December 2024)
- ML20098G994 + (11:51:58, 13 December 2024)
- ML20098G992 + (11:51:59, 13 December 2024)
- FVY-84-118, Forwards Procedure AP 0154, Post-Trip Review, Inadvertently Omitted from 840925 Submittal + (11:52:00, 13 December 2024)
- PLA-2320, Responds to NRC Re Violations Noted in Insp Repts 50-387/84-31 & 50-388/84-37.Corrective Actions:Bracing Failure Incident Included in Radwaste Worker Training to Enhance Importance of Bracing in Radwaste Shipments + (11:52:00, 13 December 2024)
- ML20098G965 + (11:52:01, 13 December 2024)
- ML20098G937 + (11:52:02, 13 December 2024)
- ML20098G918 + (11:52:03, 13 December 2024)
- 05000413/LER-1984-008-02, :840822,various ESF Valves Repositioned to Safety Positions.Caused by Inadvertent Actuation of Relay K603 of Train a Solid State Protection Sys + (11:52:05, 13 December 2024)
- 05000374/LER-1984-056, :on 840827,inboard Isolation Valve 2G33-F001 Closed & Reactor Water Cleanup Pumps Tripped.Caused by Spurious High Differential Temp Reading from Riley Leak Detection Isolation Sys + (11:52:07, 13 December 2024)
- ML20098G890 + (11:52:11, 13 December 2024)
- 05000374/LER-1984-060, :on 840828,during Functional Test of Reactor Protection Sys Relays K101A & K101D,time Delay Found to Be in Excess of 10 S.Caused by Testing Method & Relay Inactivity.Relay Returned to Proper Time Delay + (11:52:13, 13 December 2024)
- ML20098G888 + (11:52:14, 13 December 2024)
- ML20098G887 + (11:52:14, 13 December 2024)
- ML20098G885 + (11:52:15, 13 December 2024)
- ML20098G883 + (11:52:16, 13 December 2024)
- ML20098G884 + (11:52:16, 13 December 2024)
- ML20098G882 + (11:52:17, 13 December 2024)
- ML20098G879 + (11:52:21, 13 December 2024)
- ML20098G878 + (11:52:22, 13 December 2024)
- ML20098G874 + (11:52:23, 13 December 2024)
- ML20098G865 + (11:52:24, 13 December 2024)
- ML20098G868 + (11:52:24, 13 December 2024)
- 05000254/LER-1984-015-05, :on 840825,turbine Bypass Valves Cycled Opened & Closed,Creating Pressure Spike Which Collapsed Voids in Vessel.Reactor Protection Sys Tripped Due to High Neutron Flux.Caused by Dirty Contacts + (11:52:26, 13 December 2024)
- ML20098G860 + (11:52:27, 13 December 2024)
- ML20098G856 + (11:52:28, 13 December 2024)
- ML20098G855 + (11:52:29, 13 December 2024)
- ML20098G849 + (11:52:29, 13 December 2024)
- 05000374/LER-1984-062, :on 840827,Div II Hi Suction Flow Trip Closed RHR Shutdown Cooling Pump Suction Inboard Valve,Causing RHR Pump to Trip.Caused by Momentary Spike During Start of RHR Pump.Pump Restarted + (11:52:31, 13 December 2024)
- ML20098G835 + (11:52:32, 13 December 2024)
- ML20098G834 + (11:52:33, 13 December 2024)
- ML20098G829 + (11:52:33, 13 December 2024)
- ML20098G826 + (11:52:34, 13 December 2024)
- ML20098G824 + (11:52:35, 13 December 2024)
- ML20098G797 + (11:52:35, 13 December 2024)
- 05000374/LER-1984-059, :on 840828,discovered Attachment B of CRD Scram Discharge Level Functional Test Signed Off as Attachment B. Caused by Erroneous Data Sheets + (11:52:37, 13 December 2024)
- 05000374/LER-1984-058, :on 840826,reactor Water Cleanup Sys Isolated. Caused by High Differential Temp in Pump a Room,Resulting from Lack of Air Flow.Caused by Repairs to Ventilation Sys + (11:52:39, 13 December 2024)
- 05000325/LER-1984-003, :on 840219,discovered HPCI Turbine Speed Control Erratic During Operability Test.Caused by Woodard Speed Controller 9903-14 Malfunction.Cause Unknown + (11:52:41, 13 December 2024)
- 05000364/LER-1984-009-01, :on 840908,two Tubes in Steam Generator 2B Identified W/Tube Wall Degradation Exceeding Pluggable Limit.Unit Shut Down on 840831 to Plug Tubes + (11:52:43, 13 December 2024)
- 05000362/LER-1984-037-01, :on 840823,unit Shut Down Due to High Chlorine Conductivity in Hot Wells & Condensate Sys.Caused by Iodine Spiking + (11:52:45, 13 December 2024)
- 05000335/LER-1984-007-02, :on 840823,reactor Trip Occurred During Weekly Logic Matrix Test.Caused by Opening of Two Trip Circuit Breakers.Trip Selector Switch & Logic Matrix Relay Replaced + (11:52:48, 13 December 2024)
- ML20098G739 + (11:52:49, 13 December 2024)
- 05000361/LER-1984-048, :on 840822,electrical Power Sys 18-month Surveillance Not Performed Per Tech Specs.Caused by Lack of Procedural Control.Requirement Will Be Proceduralized & Incorporated Into Tech Specs + (11:52:50, 13 December 2024)
- ML20098G736 + (11:52:51, 13 December 2024)
- ML20098G734 + (11:52:52, 13 December 2024)