Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099G298 + (11:32:52, 13 December 2024)
- ML20099G294 + (11:32:53, 13 December 2024)
- ML20099G292 + (11:32:54, 13 December 2024)
- ML20099G288 + (11:32:54, 13 December 2024)
- 05000275/LER-1985-007, :on 850204 & 05,control Room Ventilation Sys Automatically Transferred from Normal Mode to Pressurization Mode.Caused by Contractor Technician Performing Startup Testing on Unit 2 Solid State Protection Sys + (11:32:56, 13 December 2024)
- 05000261/LER-1985-008, :on 850203,short Circuit on Terminal Board for Radiation Monitor R-21 Vacuum Pump Occurred.Caused by Decontamination Activities Using Pressurized Water.Faulty Circuit Isolated & Feeder Breaker Replaced + (11:32:58, 13 December 2024)
- ML20099G282 + (11:32:59, 13 December 2024)
- ML20099G279 + (11:33:00, 13 December 2024)
- GO2-92-189, Forwards Rev 12 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) + (11:33:01, 13 December 2024)
- 05000259/LER-1985-003-03, :on 850205,diesel Generators C & D Inadvertently Started.Caused by Voltage Spike Trip Causing Cooling Tower Transformer Overpressurization Relays to Operate.Caution Signs Posted + (11:33:02, 13 December 2024)
- ML20099G274 + (11:33:03, 13 December 2024)
- GO2-92-188, Forwards Rev 23 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (11:33:07, 13 December 2024)
- ML20099G267 + (11:33:08, 13 December 2024)
- ML20099G265 + (11:33:09, 13 December 2024)
- 05000237/LER-1985-001, :on 850104,4-kV Breaker 2329 Failed to Trip Open During Relay Testing.Caused by Four Disconnected Wires in Trip Logic.Wires Reconnected + (11:33:10, 13 December 2024)
- ML20099G258 + (11:33:12, 13 December 2024)
- ML20099G255 + (11:33:12, 13 December 2024)
- ML20099G251 + (11:33:13, 13 December 2024)
- ML20099G246 + (11:33:14, 13 December 2024)
- ML20099G249 + (11:33:14, 13 December 2024)
- ML20099G242 + (11:33:15, 13 December 2024)
- 05000331/LER-1984-028, :on 840714,degraded Voltage Condition on Offsite Power Grid Resulted in Automatic Switching of Buses to Onsite Power Initiating Scram.Caused by Spurious Isolation Upon Reenergizing from Temp Switches + (11:33:18, 13 December 2024)
- ML20099G238 + (11:33:19, 13 December 2024)
- ML20099G234 + (11:33:20, 13 December 2024)
- ML20099G226 + (11:33:21, 13 December 2024)
- 05000373/LER-1985-012-01, :on 850208,reactor Water Cleanup Sys Isolated on High Differential Flow.Caused by Sys Blowing Down to Main Condenser.Sys Restarted.Flow Elements Will Be Recalibr + (11:33:22, 13 December 2024)
- ML20099G213 + (11:33:24, 13 December 2024)
- ML20099G211 + (11:33:24, 13 December 2024)
- ML20099G206 + (11:33:25, 13 December 2024)
- 05000278/LER-1992-005-03, :on 920714,offgas Recombiner Low Flow Condition Caused Main Condenser Vacuum to Begin Decreasing & Small Scram Initiated.Caused by Loose Pressure Control Valve Feedback Linkage.Linkages Replaced + (11:33:27, 13 December 2024)
- 05000305/LER-1985-003, :on 850208,reactor Tripped.Caused by Decrease in Steam Generator Vol to Low Level Alarm Setpoints. Corrective Action Being Investigated + (11:33:29, 13 December 2024)
- ML20099G182 + (11:33:31, 13 December 2024)
- ML20099G193 + (11:33:31, 13 December 2024)
- BSEP-92-0005, Special Rept 2-SR-92-005:on 920706,fire Barrier Penetration Seal in Reactor Bldg ECCS Piping Room Declared Inoperable. LCO Expected to Expire Before Repairs Completed.Fire Watch Established & Remains in Place Pending Replacement of Seal + (11:33:32, 13 December 2024)
- ML20099G169 + (11:33:33, 13 December 2024)
- ML20099G177 + (11:33:33, 13 December 2024)
- PY-CEI-NRR-1535, Responds to NRC Re Violations Noted in Insp Rept 50-440/92-04 on 920326-0623.Corrective Actions:Previously Deferred MSIV Upgrade Mod to Be Implemented & LLRT Instructions for MSL Penetrations Will Be Revised + (11:33:34, 13 December 2024)
- ML20099G158 + (11:33:35, 13 December 2024)
- ML20099G162 + (11:33:35, 13 December 2024)
- ML20099G157 + (11:33:36, 13 December 2024)
- AECM-83-0562, 1982 Tritium Concentration in Surface Water (Quarterly Composites) + (11:33:37, 13 December 2024)
- ML20099G147 + (11:33:37, 13 December 2024)
- ML20099G140 + (11:33:38, 13 December 2024)
- ML20099G117 + (11:33:39, 13 December 2024)
- ML20099G126 + (11:33:39, 13 December 2024)
- ML20099G114 + (11:33:40, 13 December 2024)
- ML20099G108 + (11:33:41, 13 December 2024)
- ML20099G106 + (11:33:41, 13 December 2024)
- PY-CEI-NRR-0155, Advises That Info from NEDE-24988-P Re Generic BWR Safety/Relief Valve Operability Test Results Should Resolve SER Confirmatory Issue 7 + (11:33:43, 13 December 2024)
- ML20099G098 + (11:33:43, 13 December 2024)
- ML20099G077 + (11:33:45, 13 December 2024)
- ML20099G072 + (11:33:46, 13 December 2024)