Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099H887 + (11:26:36, 13 December 2024)
- ML20099H881 + (11:26:37, 13 December 2024)
- ML20099H876 + (11:26:38, 13 December 2024)
- ML20099H877 + (11:26:38, 13 December 2024)
- ML20099H869 + (11:26:40, 13 December 2024)
- ML20099H870 + (11:26:40, 13 December 2024)
- AECM-83-0241, Annual Radiological Environ Operating Rept for 1982 + (11:26:43, 13 December 2024)
- BSEP-84-2511, RO 1-84-18:on 841018,wide Flange Support Beam of Hydraulic Snubber 1-E11-89SS491 Twisted Slightly at Snubber Attachment.Investigation & Evaluation of Event Incomplete. LER Will Be Submitted by 841221 + (11:26:43, 13 December 2024)
- 05000219/LER-1984-022, :on 841016,three Scram Discharge Vol Vents & Drain Valves Exceeded Max Closing Time.Caused by Improperly Installed Diaphragm in solenoid-operated Air Valve.Diaphragm Installed Correctly + (11:26:45, 13 December 2024)
- ML20099H848 + (11:26:46, 13 December 2024)
- B11480, Forwards Rev 1 to Physical Security Plan for Receipt of Nuclear Fuel. Plan Will Become Effective Upon Receipt of Nuclear Fuel.Plan Will Remain in Effect Until Implementation of Physical Security Plan.Withheld (Ref 10CFR73.67) + (11:26:47, 13 December 2024)
- ML20099H841 + (11:26:48, 13 December 2024)
- ML20099H844 + (11:26:48, 13 December 2024)
- ML20099H834 + (11:26:49, 13 December 2024)
- RBG-19388, Interim Deficiency Rept DR-197 Re Seismic Testing of Category I Leakage Control Sys Air Compressor Used for Penetration Valves.Next Rept Will Be Provided by 850117 + (11:26:49, 13 December 2024)
- DCL-84-343, Forwards Response to Remaining Allegations Identified in NRC 840828 & 1022 Ltrs.Evaluations & Investigations Resolve Allegations.Ack of Receipt of Matl Requested + (11:26:53, 13 December 2024)
- ML20099H824 + (11:26:54, 13 December 2024)
- 05000325/LER-1984-029, :on 841022,train a of Common Control Bldg Emergency Air Sys Automatically Started Due to Fire Alarm. Caused by Welding/Grinding Activities.Fire Detectors to Be Removed from Svc During Activities + (11:26:56, 13 December 2024)
- ML20099H816 + (11:26:57, 13 December 2024)
- SNRC-1153, Advises That Util Performing Leak Rate Test W/O Energizing Automatic Depressurization Sys Solenoid Valves & Avoiding Potential Degradation of Safety Relief Valve Pilot Seats,Per Requirements of NUREG-0737,TMI Item II.K.3.28 + (11:26:58, 13 December 2024)
- ML20099H811 + (11:26:59, 13 December 2024)
- ML20099H810 + (11:26:59, 13 December 2024)
- 05000416/LER-1984-047, :on 841018,bypass Switches of Leakage Detection Sys on Reactor Water Cleanup,Rhr & RCIC Placed in Bypass for Maint Troubleshooting,Violating Tech Specs + (11:27:01, 13 December 2024)
- LD-85-012, Forwards Revised CESSAR Interface Requirements Re Atmospheric Dump Block Valves to Be Included in Future CESSAR Amend,Resolving Confirmatory Issue 2 + (11:27:03, 13 December 2024)
- 05000416/LER-1984-046, :on 841017,reactor Water Cleanup Sys Containment Isolation Valves Isolated False Reactor Water Cleanup Room 2 High Differential Temp Signal.Cause Undetermined.Trip Signals Cleared + (11:27:04, 13 December 2024)
- ML20099H793 + (11:27:06, 13 December 2024)
- ML20099H790 + (11:27:07, 13 December 2024)
- ML20099H791 + (11:27:07, 13 December 2024)
- 05000388/LER-1984-024-01, :on 841016,total Amount of Boron in Sodium Pentaborate Solution of Standby Liquid Control Sys Found Below Tech Spec Requirements.Chemicals Added & Proper Boration Attained.Surveillance Test Revised + (11:27:09, 13 December 2024)
- AECM-84-0262, Annual Radiological Environ Operating Rept for 1983 + (11:27:10, 13 December 2024)
- ML20099H783 + (11:27:11, 13 December 2024)
- 05000387/LER-1984-045, :on 841018,failure to Perform 18-month Surveillance of Scram Discharge Vol Vent & Drain Valves Since 820113 Discovered.Caused by Personnel Error.Person Assigned to Review Surveillance Program + (11:27:13, 13 December 2024)
- 05000389/LER-1984-006-03, :on 841014,operators Could Not Obtain Reading of Auxiliary Feedwater (AFW) Flow to Steam Generator B from AFW Pump B.Caused by Stem Separating from Plug on AFW Valve. Investigation Continuing + (11:27:15, 13 December 2024)
- ML20099H775 + (11:27:17, 13 December 2024)
- ML20099H769 + (11:27:18, 13 December 2024)
- ML20099H764 + (11:27:19, 13 December 2024)
- ML20099H768 + (11:27:19, 13 December 2024)
- JAFP-92-0598, Ja Fitzpatrick Nuclear Power Plant,Annual Summary of Changes,Tests & Experiments for 1991 + (11:27:20, 13 December 2024)
- ML20099H754 + (11:27:21, 13 December 2024)
- ML20099H753 + (11:27:22, 13 December 2024)
- ML20099H752 + (11:27:23, 13 December 2024)
- ML20099H750 + (11:27:23, 13 December 2024)
- ML20099H746 + (11:27:24, 13 December 2024)
- ML20099H747 + (11:27:24, 13 December 2024)
- AECM-85-0062, Responds to NRC Re Violations Noted in Insp Rept 50-416/84-51.Corrective Actions:Procedure 10-5-06-3 Revised & Monthly Temporary Alteration Audit Form Added + (11:27:26, 13 December 2024)
- ML20099H744 + (11:27:26, 13 December 2024)
- ML20099H742 + (11:27:27, 13 December 2024)
- ML20099H737 + (11:27:28, 13 December 2024)
- ML20099H733 + (11:27:28, 13 December 2024)
- ML20099H732 + (11:27:29, 13 December 2024)
- ML20099H728 + (11:27:30, 13 December 2024)