ML20099H811
| ML20099H811 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/31/1992 |
| From: | Baron R, Ratliff S TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9208190223 | |
| Download: ML20099H811 (13) | |
Text
.
nn s.,,_
o.,.m u r-o*..w n%
m,... -.
' :AllG 14190 U.S. Nuclear Regulatory Commission ATTH: Document Control Desk Washington, D.C.
20555 Gentlement In the Matter of
)
Docket Hos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONT!!LY OPERATING REPORT FOR TIIE MONTl!
0F JULY 1992 In accordance with the requirements of the BFN Technical Specifications section 6.9.1.3, the Monthly Operating Report for the month of July 1992 is provided in the enclosure.
If-you have any questions, please telephone me at (205) 729-7566.
3incerely,.
g2w h
R. Baron, Manager of Sit.e Licensing Enclosures I
cc See page 2 l
p-L I
I, l
92001902239Eo"7$30' h<
l'
-gDR ADOCK 05000259
/
^
PDR-3
l g
' U.S. Nuclear Regulatory Commission gua o im Enclosures cc (Enclosures):
INPO Records Center Institute of Nuc.1 car Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30389 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Frederick J. Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II Office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C.
20555 Mr. Ted Martson, Director Electric Power Research Institute P.O. Box 10412 Palo Alto, California 94304 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Mr. Fred Yost, Director of Research Services, Utility Data Institute, Inc.,
1700 K Street, NW, Suite 400 Washington, D.C.
20006
1-MONTHLY OPERATING REPORT BROWNS FERRY NUCLEAR PIANT TENNESSEE VALLEY AUTHORITY JULY 1992 DOCKET NUMBERS 50-259, 50-260, AND 50-296 LICENSE NUMBERS DPR-33, DPR-52, AND DPR-68 I
f4 OPERATIONAL SUtt!ARY JULY 1992 LE11_1 Unit remains on administrative hold to resolve various WA and NRC concerns.
UNIT 2 Unit 2 generated 731,240 MWHs (gross) electrical power and was on line 96 percent of the reporting period.
011I. 3 Unit remains on administrative hold to resolve various WA and NRC concerns.
c1 y
-,er-y-
1 6*
a AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-259 Unit one PREPARED BY S. A. Rett 111L TELEPHONE 1295) 721-1931 MONTH J.ULY 1992 DAY AVERAGE DAILY. POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
- 10 0
26 0
11' O
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
PLLIC207/449/8
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-260 Unit Two PREPARED BY LA&tlifL TELEP110NE 1205) 729-2937 MONTil JULL122L__
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA7LY POWER LEVEL (MWe-Net)
(fNo-Ne t )
1 1065 17
_10]S_
2 10_69 18
,__1Q60 3
1067_ _
19 1018 4
1040 20 1013 5
1070 21
_1015 6
1.01 2 22 1013 7
1065 23 1063 8
1%0 24 1068 3
1Q65 25 103.Z_
10 1012 26 10h3 11 65L 27
_1066 12 857 28 860 13 856 29 0
14 1010 30 280 15 1065 31 2H2 16 1067 NOTE: Net generation values are based on manual readings from an integrating watt hour meter.
Small differences in the time of day of manual recording may cause the values to vary slightly.
PLLIC207/449/9 l
1 l :.
- .a L Ji AVERAGE DAILY UNIT POWER. LEVEL DOCKET NO.
50-296-UNIT Three PREPARED BY S. A. Ratliff TELEPHONE (205) 729-2937 MONTil JULY 1992 DAY AVERAGE !a!.s.
10WER LEVEL DAY AVERAGE DAILY POWER LEVEL QLe-Net)-
(MWe-Net) 1 0
17 0-2 0
18 0
-3 0-19 0
-4 0
20 0
5 0
21 0
6 Q
22 0
-7 0
23 0 '
O 24 0
9 0
25 0
.10-0 26 0
11 0
27 0
'll t 0
28 0
-13.
0 29 0
14 0
30 0
15
'O 31' O
16 0
.PLLIC207/449/10 L
l
,.f_
r OPERATYNG DATA REPORT DOCKET NO.
50-259-3 PREPARED BY' S.- A. Ratliff TELEPHONE. (205) 729-2937
' OPERATING STATUS-Notes 1.
Unit Name: ___f-awns' Ferry Unit One 2.-
Reporting Period:-
July 1992' 3.
Liceried Thermal'. Power (Wt): 3293 4.
Nameplate Rating? (Gross We):. 1152 5.
Design Electrical Rating (Net MWe): _1065 6.
Maximum Dependable Capacity (Gross MWe):
1098.4 7.- Maximum Dependable Capacity (Net MWe): 1065
'8.
If Changes'0ccur-in Capacity Ratings (Iteme, Number 3 Through 7) Since Last Report, Give' Reasons:
N/A'
'9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744 5111 157855
- 12. Number of Hours Reactor Was Critical 0
0 59521
- 13. Reactor Reserve Shutdown. Hours 3
0 6997
- 14. Hours Generator'On-Line 0
0 58267
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
168066787
- 17. Gross Electrical Energy Generated (MWH) 0 0
55398130
- 18. Net Electrical Energy Generated (MWH)
-21,25
-15104 53520386
- 19. Unit Service Factor 0
0 36.9
- 20. Unit Availability' Factor 0
0 36.9
- 21. Unit Capacity Factor (Using MDC Net) 0 0
3 L 8___
- 22. Unit Capacity' Factor (Using DER Net) 0 0
31.8
- 23. Unit Forced Outage Rate 100 100 5 &.1..
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:.To be determined PLLIC207/449/11
OPERATING DATA REPORT i
460
? _Ratliff il 729-2937 OPERATING STATUS N
1.
Unit Name:
Browns Ferry Unit Two 2.
Reporting Period:
July 1992 3.
Licensed Thermal Power (MWt): _3293 4.
Nameplate Rating (Gross MWe):
1152 5.
Design Electrical Rating (Net MWe):
1065 6.
Maximum Dependable Capacity (Gross MWe):
1098.4 7.
Maximum Dependable Capacity (Net MWe):
1065 8.
If Changes Occur in Capacity Ratings (Items Nu6ber 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Curnlative
- 11. Hours in Reporting Period 744.0 5111.0 152742
- 12. Number of Hours Reactor Was Critical 717.3 4896.2 65403___
- 13. Reactor Reserve Shutdown Hours 0
0 14200
- 14. Hours Generator On-Line 710.7 4833.6 63300
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2211477.6
_1.5266092.9 180341948
- 17. Gross Electrical Energy Generated (MWH) 731240.0 5144370.0 5981h178 l
- 18. Het Electrical Energy Generated (MWH) 71283D.0 501974Q,0 57829999
- 19. Unit Service Factor 95.5 94.6 41.4
- 20. Unit Availability Factor 95.5 94.6 41.4
- 21. Unit Capacity Factor (Using MDC Net) 90.0 92.2 35.6
- 22. Unit Capacity Factor (Using DER Net) 90.0 92.2 35.6 l
- 23. Unit Forced Outage Rate 4.5 1.5 51.6 l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A I
PLLIC207/449/12 l
a.
OPERATING DATA REPORT DOCKET NO.
50-295 PREPARED BY
& Ealliff TELEPHONE
_2 5I 729-293Z OPERATING STATUS Notes 1.
Unit Name: __lrawns Ferry Unit Three 2.
Reporting Period:
July 1992 3.
Licensed Thermal. Power (MWt):
3293 4.
Nameplate Rating (Gross MWe): 1152 5.
Design Electrical Rating (Net MWe): _lD55 6.
Maximum Dependable Capacity (Gross MWe):
1098.4 7.
Maximum Dependable Capacity (Net MWe):
1065 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A I
9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A
~~
i This Month Yr-to-Date Cumulative
- 11. Hours in ReportinF Period 744.0 5111.0 135167
- 12. Number of Hours Reactor Was Critical 0
0 45306
- 13. Reactor Reserve Shutdown Hours 0
0 5150
- 14. Hours Generator On-Line 0
0 44195
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
131863267
- 17. Gross Electrical Energy Generated (MWH) 0 0
43473760
- 18. Net Electrical Energy Generated (MWH)
-1979.0
-11915.0 41940894
- 19. Unit Service Factor 0
0 32.7
- 20. Unit Availability Factor 0
0 32.7
- 21. Unit Capacity Factor (Using MDC Net) 0 0
29.1__
- 22. Unit Capacity Factor (Using DER Net) 0 0
29.1
- 23. Unit Forced Outage Rate 100.0 100.0 62 1.
- 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: To be determined l
PLLIC207/449/13
~
. -. e ---
.s.-
DOCKFT NO:
50-259
[ UNIT SHUTDOWNS APO, POWER REDUCTIONS t%IT NAME:
One
~
PREPARED BY:5. A.' Ratliff 7
REPORT M0rtTH:
July 1992 TELEPHONE:(205) 729 2937
'l l
l l
[~
=1 Method'of l Licensee-l l
l. Cause and Corrective i
.l l
l-l Duration!
.lShuttingDown l Event i System l Component l Action to l
l 2
3 5
- lNo.
l Date l Type l (Hours) 'l Reason l Reactor lReportNo; l Code #
l Code
-l
. Prevent Recurrence 1
-l l
l' I
-1 I
I I
I I
l 1
1 l
I l-I l-1 I
i 1.
I315 l06/01/85 l.F I 744
.l F
l 4
l l
l lAdministrativeholdto-l l
l' I
I l
l 1
'l' I
I resolve various TVA and l l
l l
l
.l l
l l
l
'lNRCconcerns.
l 1
I I
I i
l I
i l
i i
I i
i i
I i
l 1
-1 I
l' l
l I
I I
l l
I I
I I
I I
I
'l l
I I
l' I
I I
I I
l' I
I I
I I
I I
I I
I I
I I
i l-1 I
I
-1 I
I 1-1-
1 I
I I
I I
I I
I I
I I
l i
I I
I I
I I
-l 1
l i
1.
I I
I I
I I
i 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
1 I
I I
I I
I I
I I
I l
'l 1
l I
I I
I I
I I
I I
i 1
I I
I I
I I
l l
l l
l l
l l
1 l
l I: Forced Reason:
3 2
F Method:
Exhibit G-Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance.or Test 2-Hanual Scram Entry sheets for Licensee C-Refueling 3-Autoe.atic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061)
E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain) 5Exhibit I-Same Source H-Other (Explain)
PLLIC207/449/14
N
- J*-
DOCKET NO:
50-250' UNIT-SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:
Tw COMPLETED BY:5. A. Ratlif f 7
' REPORT NONTH
- July 1992 TELEPHONE:(2051 729-2937 l
l l
l l
lMe d of l Licensee
'l l
l CauseandCorrective.]
l l
l l~ Duration l
-lShu ang Down l Event
'] System lComponenti Action-to l
l 2
3-4 0
lNo,'
l Date
-l Type
.l(Hours) l Reason l Reactor lReportNo.' l Code l Cede l
Prevent Recurrence l
l 1
l l
l l
l 1
I 1
l l.
I I
I I
i 1
I I
I I
l10 l7/12/92 ~ l. S'
.l 0
l B
l 5
l
-l l
l Power Reduction to 757. i l l
l l
Il l
l l
.l
.l
-lforrodadjustment'and
-l l
l
'l
'l l
l l
.l
.l maintenance.
j' i
1 I
I I
I I
I I
I I
'l l
I I
I I
I l
i I
I I
I I
I I
I I
I I
'l I
l 11 l7/28/92 l T l.33.0'
'l A
l 3
l
-l l
1 Scram due to a spurious l l
l l.
l l
l l
l l
lhigh water level trip, l
l l
l l
l' l
l l
l lcausedbyafalse' signal l l
l l'
l l
l l
l l
lfromanewelectrical.
l 1
l l
l l
l l
l l
l switch.
l 1
I I
'l I
i l
I i
l i
i l
i l
i I
I I
I I
I I
I I
I
.I I
l-1 I
I i
l i
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
1 1
I I
I I
I I
I I
I
'l i
I I
I I
I I
I I
i 1.
I I
I I
I I
I I
I I
i l
l l
l l
l l
l l _
1 1
I i
1 1
1 i
_1 I: forced Reason:
3 2
F Method:
Exhibit G-Instructions 5: Scheduled A-Equipmen't failure (Explain) 1-Manual for Preparation of Data B-Haintenance or Test 2-Hanual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Contintration of Exist. : Outage (NUREG-061)
E-Operator Training and License Examination 5-Reduction F-Admini st rati ve 9-Other G-Operational Error (Explain) 5Exhibit I-Same Source H-Other (Explain)-
PLLIC207/449/15
J'
-- 1 DOCKE7 N05 50-2 %
' UNIT. SHUTDOWNS AND POWER RED'JCTIONS.
- UNIT NAME:
Three' COMPLETED BY:5. A. Rat'liff
, REPORT HONTH:
Julv 199jL '
TELEPHONE:(205) 729-2937.
l-IMethodof l Licensee; l
l
. l Cause and Corrective l
-l' l
l l~
lShuttingDown. l' Event'
~l. System
-l Component ]'
Action to' l
l
-].
l-
'l Duration-l~
I 2-3 4
5
'lNo.
l Date l Type
..l(Hours)-l Reason l Reactor lReportNo.-jCode
'l Code l
Prevent Recurrence l
l 1-l I
'l i
'l I
l' I
l 1
1 l-ll 1:
1-1 I
I I
I i157 l03/03/85 l' : F -
l1744 l
F l
4'
'l l
l lAdministrativeholdto. l l
l
-I
. l..
l l
l l
<l l resolve various TVA and l
'l-l' l
~l l
1.
l.
l l
lNRCcorcerns.
l l'
-l l-l I
'l I
I I
'I l'
I I
i-
.I I
I l'
'I.
I i
1.
.l.
~l.
l-I l-1 I
I I
I i
i I
I
.I I
I I
I
~1 i
i l
i I
I I
I I
I I
i
'l I
'l-1 l
.I I
i i
i i
l i
1.
l I
l-1 I
I i
I i
i l
1 l
i I
l l
I I
i i
i i
l l'
I I
I l-1 I
I I
l-I l
I i
i i
I I
I I
I I
I I
i i
i I
I
'l l
I l'
I I
I I
i i
i l
i I
I l
I I
I I
I I
I I
I I
1 I
I I
I i
1 1
I I
I I
I I
I I
I I
I I
I i
l I
i l
i I
i i
l i
I
'l l
I I
I l
l I
I I
i 1
I I
I I
I i
2 3
I: Forced Reason:
Method:
Exhibit G-Instructions F
5: Scheduled A-Equipment failure (Explain) 1-Manual
'or Preparation of Data B-Hain mance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File -
0-Regulatory Restriction 4-Continuation of. Existing Outage
- (NUREG-061 )
E-Operator Training and License Examination 5-Reduction F-Administrati ve 9-Other 5Exhibit I-Same Source G-Operational' Error (Explain)
' H-Other (Explain)
PLLIC207/449/16 g-
,