Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099M085 + (11:14:29, 13 December 2024)
- ML20099M082 + (11:14:30, 13 December 2024)
- 05000413/LER-1984-018-02, :on 841023,in-core Thermocouple Tube Leakage Occurred.Caused by Separation of Stainless Steel Conduit from Swagelok Tube Fitting.Thermocouple Replaced + (11:14:31, 13 December 2024)
- ML20099M072 + (11:14:32, 13 December 2024)
- ML20099M063 + (11:14:33, 13 December 2024)
- SNRC-1113, Application for Amend to CPPR-95,extending Const Completion Date from 841231 to 850330,due to Litigation on Tdi Emergency Diesel Generator.Decision Expected in Early 1985 + (11:14:34, 13 December 2024)
- ML20099M060 + (11:14:35, 13 December 2024)
- ML20099M033 + (11:14:35, 13 December 2024)
- ML20099M031 + (11:14:36, 13 December 2024)
- ML20099M016 + (11:14:37, 13 December 2024)
- ML20099M015 + (11:14:38, 13 December 2024)
- ML20099M014 + (11:14:39, 13 December 2024)
- ML20099M012 + (11:14:39, 13 December 2024)
- ML20099M007 + (11:14:42, 13 December 2024)
- ML20099M005 + (11:14:44, 13 December 2024)
- ML20099L994 + (11:14:46, 13 December 2024)
- ML20099L993 + (11:14:47, 13 December 2024)
- ML20099L985 + (11:14:49, 13 December 2024)
- IR 05000282/1984015 + (11:14:50, 13 December 2024)
- ML20099L962 + (11:14:51, 13 December 2024)
- ML20099L958 + (11:14:52, 13 December 2024)
- ML20099L942 + (11:14:52, 13 December 2024)
- ML20099L924 + (11:14:53, 13 December 2024)
- ML20099L921 + (11:14:54, 13 December 2024)
- PY-CEI-NRR-0216, Forwards MDE-10-0185, Perry Plant Unique Encroachments Final Test Rept. Rept Addresses Outstanding Issue 8 in Sser 4.Updated Response Will Be Provided by 850501.Affidavit of R Artigas Encl.Rept Withheld + (11:14:54, 13 December 2024)
- 05000336/LER-1995-044, :on 951129,discovered Surveillance Period for Containment Air Lock Testing Exceeded 25% Extension.Caused by Unclear TS Surveillance Requirements.Changed Manual to Clarify When to Use 4.0.2 Requirement + (11:14:56, 13 December 2024)
- ML20099L906 + (11:14:57, 13 December 2024)
- ML20099L892 + (11:14:58, 13 December 2024)
- ML20099L891 + (11:15:02, 13 December 2024)
- ML20099L887 + (11:15:03, 13 December 2024)
- ML20099L886 + (11:15:04, 13 December 2024)
- BVY-95-140, Documents Revised Submittal Date for USI A-46 Effort from 951231 to 960331 + (11:15:05, 13 December 2024)
- ML20099L880 + (11:15:06, 13 December 2024)
- ML20099L877 + (11:15:07, 13 December 2024)
- ML20099L869 + (11:15:08, 13 December 2024)
- ML20099L861 + (11:15:09, 13 December 2024)
- ML20099L849 + (11:15:10, 13 December 2024)
- NG-95-2985, Application for Amend to License DPR-49,revising TS Section 3.7, Plant Containment Sys + (11:15:10, 13 December 2024)
- NG-95-3588, Advises That Due to Cost Associated W/Repairing Feature Resulting in Simulator Discrepancy Compared W/Low Training Value,Util Has Decided Not to Decertify & Not Repair Feature + (11:15:11, 13 December 2024)
- 05000354/LER-1995-036, :on 951129,as Found Values for Safety Relief Valve Lift Setpoints Exceeded TS Allowable Limit.Caused by Corrosion Bonding of Pilot Disc to Pilot Seat.Srvs Inspected & Refurbished + (11:15:13, 13 December 2024)
- 0CAN129503, Requests Approval,Per 10CFR50.55a(a)(3),for Use of ASME Code Case N-498-2, Alternative Requirements for 10-Yr Sys Hydrostatic Testing for Class 1,2 & 3 Sys,Section Xi,Div 1, by 960301 + (11:15:14, 13 December 2024)
- LIC-95-0242, Forwards Nelia Policy NF-207 & Maelu Policy MF-63 + (11:15:14, 13 December 2024)
- RBG-42322, Submits Addl Info Per Request Pertaining to LAR 95-04, Changes to Tech Specs Re Fuel Handling Accident Conditions + (11:15:15, 13 December 2024)
- ML20099L814 + (11:15:16, 13 December 2024)
- ML20099L816 + (11:15:16, 13 December 2024)
- BVY-95-144, Submits Response to Violations Noted in Insp Rept 50-271/95-23.Corrective Actions:Util Performed Radiography of Valves on 951105,verified Closure Capability & Compliance W/Requirements of Subsection 4.3.2.4(a) of OM-10 + (11:15:17, 13 December 2024)
- 05000265/LER-1984-010-07, :on 841025,reactor Scrammed Due to High Reactor Pressure While in Hot Standby.Caused by Procedural Inadequacy.Procedure Revised + (11:15:19, 13 December 2024)
- ML20099L802 + (11:15:20, 13 December 2024)
- 05000423/LER-1995-019-02, :on 951201,leaks Found in 3/4 Inch Socket Welds on C RCS Loop Flow Instrumentation Line & RCP Seal Injection Drain Line.Caused by Vibration Induced Fatigue at Stress Riser in Weld.Welds & Weld Bosses Removed + (11:15:22, 13 December 2024)
- 05000361/LER-1995-016, :on 951127,omission in High Energy Line Break Analysis Occurred.Caused by Original UFSAR Section 3.6A Hypothesized High Energy Line Break Analysis Completed by Plant.Interim Compensatory Review Initiated + (11:15:24, 13 December 2024)
- ML20099L780 + (11:15:25, 13 December 2024)