ML20099L877

From kanterella
Jump to navigation Jump to search
Amends 140 & 134 to Licenses NPF-35 & NPF-52,respectively, Changing Updated Final Safety Analysis Rept
ML20099L877
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/29/1995
From: Wiens L
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20099L878 List:
References
NUDOCS 9601030024
Download: ML20099L877 (4)


Text

_._ _ _..._ _ _

. /**%

f.

4 UNITED STATES NUCLEAR REGULATORY COMMISSION f

WASHINGTON, D.C. 20566-0001

          • ,o DUKE POWER COMPANY NORTH CAROLINA ELECTRIC MEMBERSHIP CORPORATION SALUDA RIVER ELECTRIC COOPERATIVE. INC.

DOCKET NO. 50-413 CATAWBA NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

140 License No. NPF-35 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-35 filed by the Duke Power Company, acting for itself, North Carolina Electric Membership Corporation and Saluda River Electric Cooperative, Inc. (licensees), dated September 5, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9601030024 951229 PDR ADOCK 05000413 P

PDR

. 2.

Accordingly, by Amendment No.140, the license is amended to authorize revision of the Updated Final Safety Analysis Report (UFSAR) as set forth in the application for amendment by the licensee dated September 5, 1995. The licensee shall update the UFSAR to reflect that the containment air particulate monitors are not required to meet seismic Category I design requirements, as authorized by this amendment, in accordance with 10 CFR 50.71(e).

3.

This license amendment is effective as of its date of issuance ar.d shall be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

(

OL223 Leonard A. Wiens, Acting Director Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Date of Issuance:

December 29, 1995

ye 4

UNITED STATES E

NUCLEAR REGULATORY COMMISSION f

WASHINGTON, D.C. 20666 4 001

\\...../

DUKE POWER COMPANY NORTH CAROLINA MUNICIPAL POWER AGENCY NO. 1 PIEDMONT MUNICIPAL POWER AGENCY DOCKET NO. 50-414 CATAWBA NUCLEAR STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.134 License No. NPF-52 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Catawba Nuclear Station, Unit 2 (the facility) Facility Operating License No. NPF-52 filed by the Duke Power Company, acting for itself, North Carolina Municipal Power Agency No. I and Piedmont Municipal Power Agency (licensees), dated September 5, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;

)

C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

--. -- - ~

_ - - ~.

. 2.

Accordingly, by Amendment No. 134, the license is amended to authorize revision of the Updated Final Safety Analysis Report (UFSAR) as set forth in the application for amendment by the licensee dated September 5, 1995. The licensee shall update the UFSAR to reflect that the containment air particulate monitors are not required to meet seismic Category I design requirements, as authorized by this amendment, in accordance with 10 CFR 50.71(e).

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMISSION l

L L

LL eonard A. W ens, Acting Director Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Date of Issuance:

December 29, 1995 1

r m

- -