Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100F913 + (10:54:10, 13 December 2024)
- ML20100F911 + (10:54:11, 13 December 2024)
- ML20100F909 + (10:54:13, 13 December 2024)
- ML20100F908 + (10:54:15, 13 December 2024)
- JAFP-96-0064, Submits Evaluation Results for GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (10:54:16, 13 December 2024)
- ML20100F905 + (10:54:18, 13 December 2024)
- ML20100F900 + (10:54:20, 13 December 2024)
- W3P84-3226, Third Revised Final Significant Const Deficiency Rept 60 Re Ebasco,Util & Tompkins-Beckwith,Inc Turnover Documentation & Inadequate Hanger Weld Problems.Corrective Actions Verified Through Surveillances & Audits + (10:54:21, 13 December 2024)
- ML20100F893 + (10:54:22, 13 December 2024)
- 05000416/LER-1985-011, :on 850226,QA Audit Revealed Two Occasions Where Halon Tank Pressures Incorrectly Determined to Be within Acceptance Criteria During Halon Tank Pressure Checks.Caused by Mechanic Errors + (10:54:24, 13 December 2024)
- 05000374/LER-1985-009-06, :on 850301,reactor Water Cleanup Sys Isolated on High Differential Flow.Caused by Pressure Transient Created by Opening Vessel Head Vent Valves.High Differential Flow Isolation Signal Reset + (10:54:26, 13 December 2024)
- 05000370/LER-1985-004-02, :on 850204,small Hole Discovered in Metal Plate Covering Fire Barrier Penetration in Floor of Control Room. Cause Unknown.Fire Watch Established,Pending Repair of Hole + (10:54:31, 13 December 2024)
- ML20100F881 + (10:54:33, 13 December 2024)
- ML20100F879 + (10:54:34, 13 December 2024)
- ML20100F877 + (10:54:35, 13 December 2024)
- ML20100F872 + (10:54:38, 13 December 2024)
- ML20100F869 + (10:54:39, 13 December 2024)
- 05000364/LER-1985-007, :on 850301,while Reviewing Limiting Condition for Operation Forms During Shift Turnover,Fire Watch Requirements for Inoperable Fire Barrier Incorrectly Determined.Caused by Personnel Error + (10:54:40, 13 December 2024)
- ML20100F856 + (10:54:43, 13 December 2024)
- ML20100F854 + (10:54:44, 13 December 2024)
- ML20100F853 + (10:54:44, 13 December 2024)
- ML20100F842 + (10:54:46, 13 December 2024)
- ML20100F840 + (10:54:47, 13 December 2024)
- ML20100F831 + (10:54:48, 13 December 2024)
- ML20100F836 + (10:54:48, 13 December 2024)
- RBG-19522, Final Deficiency Rept DR-167 Re Wiring Discrepancies in HPCS Diesel Generator Control Panel.Condition Not Reportable Under 10CFR50.55(e).Request LD1-1246 Issued to Correct Identified Discrepancies + (10:54:49, 13 December 2024)
- ML20100F826 + (10:54:50, 13 December 2024)
- ML20100F825 + (10:54:51, 13 December 2024)
- ML20100F810 + (10:54:52, 13 December 2024)
- ML20100F809 + (10:54:53, 13 December 2024)
- 05000483/LER-1985-010, :on 850331,ESFs Actuated Due to Low Steam Generator Levels.Caused by nonsafety-related 120-volt Ac Instrument Bus Deenergized Due to Faulty Transformers. Transformers Replaced + (10:54:55, 13 December 2024)
- RBG-19496, Interim Deficiency Rept DR-206 Re Lubricant in Two Fuel Pool Cooling Pumps & Motors.Next Rept Will Be Provided by 850124 + (10:54:57, 13 December 2024)
- ML20100F806 + (10:54:57, 13 December 2024)
- ML20100F775 + (10:54:59, 13 December 2024)
- ML20100F769 + (10:55:00, 13 December 2024)
- ML20100F758 + (10:55:01, 13 December 2024)
- ML20100F755 + (10:55:01, 13 December 2024)
- LIC-96-0016, Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 1 + (10:55:02, 13 December 2024)
- ML20100F733 + (10:55:02, 13 December 2024)
- ST-HL-AE-1150, Interim Deficiency Rept Re Trapeze Type Support Assemblies. Initially Reported on 841022.Pipe Support Designs Will Be Reviewed to Identify Number of Supports Subj to Deficiency. Personnel Given Addl Training.Next Rept by 850322 + (10:55:03, 13 December 2024)
- 05000315/LER-1985-007-01, :on 850222,controlled Shutdown Initiated. Caused by Inoperable Control Room Emergency Ventilation Sys. Analysis of Potential Radiological Consequences of Operation at Higher Flow Rates Performed.Room Balanced + (10:55:05, 13 December 2024)
- ML20100F724 + (10:55:09, 13 December 2024)
- ML20100F716 + (10:55:12, 13 December 2024)
- ML20100F714 + (10:55:12, 13 December 2024)
- 05000269/LER-1985-003-02, :on 850222,emergency Safeguard Features Actuation Sys Setpoint Adjusted to 1,600 Psig.Caused by B&W Reanalysis of Small Break LOCA Transients,Per NUREG-0737. Setpoint Changes Initiated + (10:55:14, 13 December 2024)
- ML20100F708 + (10:55:15, 13 December 2024)
- ML20100F705 + (10:55:16, 13 December 2024)
- RBG-19480, Interim Deficiency/Part 21 Rept Re Topaz Inverters Supplied by Ge.Initially Reported on 841019.Discussions W/Ge Currently Underway to Determine Appropriate Corrective Action.Next Rept Expected by 850122 + (10:55:17, 13 December 2024)
- 05000322/LER-1985-008, :on 850227,emergency Diesel Generator 103 Automatically Started.Caused by Technician Error Coincident W/Reset of Ground Alarm Relay Tripping During Surveillance Procedure + (10:55:19, 13 December 2024)
- 05000528/LER-1985-010, :on 850222,automatic Actuation of balance-of- Plant ESF Actuation Sys Occurred When Placing Train a Sequencer in Manual from Automatic Mode.Caused by Unique Circumstances Involving flip-flop U-14 + (10:55:21, 13 December 2024)
- ML20100F695 + (10:55:22, 13 December 2024)