Interim Deficiency Rept 84-04 Re Radiographic Film Densities Out of Tolerance.Welds in Process of Being Repaired or Reradiographed as Applicable.Next Rept Will Be Submitted by 851101
ML20100F869
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/21/1985
From: Danni Smith
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
84-04, 84-4, 9902N, NUDOCS 8504050307
Download: ML20100F869 (2)


Text

T i * '

EN Commonwealth Edison

) One First National Plaz'. Chicago, Illinois

[O

\ ~ Address Reply to: Post Office Box 767 Chicago lilinois 60690 March 21, 1985 Mr. James-G. Keppler Regional Administrator U. S. Nuclear Regulatory Commission Region III -

799 Roosevelt Road Glen Ellyn, IL 60137s 4

SUBJECT:

Braidwood Station Units 1 and 2 10 CFR 50.55(e) No. 84-04 Interim Report Radiograph Film Density NRC Docket Nos.- 50-456/457 1

References (a): E. D. Swartz letter to J. G. Keppler dated April 6, 1984 ,

(b): E. D. Swartz letter to J. G. Keppler dated August 16, 1984 (c): D. H. Smith letter to J. G. Keppler dated December 21, 1984 Depr Mr. Keppler:

References (a), (b)'and (c) provided'information concerning a deficiency reportable pursuant to 10 CFR 50.55(e) regarding out of tolerance radiographic film densities ~at our Braidwood Station. The purpose of,this letter is to provide an

~

updated status of the corrective actions taken to resolve this issue. This letter is considered to be an Interim Report.

Status,of Corrective Actions -

Since the last Interim Report, Reference (c), corrective actions have continued on the balance of Phillips, Getschow production radiographs with identified concerns. To achieve full code compliance, these actions included repair and/or re-radiography as applicable. An additional 24 welds have been completed and four, partially complete d.

'The current status reflects 59 of the 104 complete and a balance of 45 still requiring attention. It should be noted that 18 of the remaining 45 welds will not be accessible for repair and/or re-radiography any sooner than January 2, 1986.

These welds are associated with the Unit 2 Containment Spray System. )b.

< /

g4050g{ 85

. s

AR 27 E65 l . _ i

o,_

e- .

S' g J.G. Keppler, March 21, 1985 Of the nine production radiographs which could not be located, five have been re-radiographed and are. completed, one has been cut-out and no longer requires any action, with a balance of

. three remaining. Correc'tive action on the'se three is currently

{ ,

underway.

,Regarding the welder qualifications of both Phillips, Getschow and Power Systems Inc., the procedures needed to address

~l concerns are still being developed. As indicated in Reference (c), when these programs are developed, they will be described in a subsequent Interim Report.

Reference (c) addressed resolution and completion of G.K.

Newberg and Universal Power Piping welder qualifications, so no further action is required.

A completion date for the above corrective actions depends on gaining access to.the 18 Unit II Containment Spray welds previously mentioned. A status report will be submitted when significant additional progress is made which we expect by November 1,.1985.

Please address any questions that you or your. staff may have concerning this matter to this office. , ,

br{trulyyors, Y~

David H. Smith-

Nuclear Licensing Administrator klj cc
NRC Resident Inspector - Braidwood Director of-Inspection and Enforcement.