Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HL-5110, Discusses Resolution of Issue of Conformance Re Core Shroud Stabilizer Design + (10:47:52, 13 December 2024)
- ML20100H325 + (10:47:53, 13 December 2024)
- 05000259/LER-1996-001-01, :on 960121,Unit 1/2 B DG Auto Started During Local Panel Testing.Caused by Failure of Blocking Diode in Start Failure Circuitry.Failed Diode Replaced & Panel Alarm Pushbutton Annuciation Circuitry Checked + (10:47:55, 13 December 2024)
- W3P85-0785, Interim Deficiency Rept 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Addl Time to Evaluate Safety Significance Required. Submittal of Written Rept Rescheduled for 850430 + (10:47:58, 13 December 2024)
- ML20100H297 + (10:48:00, 13 December 2024)
- ML20100H296 + (10:48:01, 13 December 2024)
- 05000388/LER-1984-023, :on 841206,fire Watch Required for Two Independent Work Activities.Caused by Fire Watch Log Not Referencing Activities.Addl Guidelines for Tracking Fire Protection Activities & Separate Log Developed + (10:48:04, 13 December 2024)
- ML20100H283 + (10:48:06, 13 December 2024)
- ML20100H279 + (10:48:07, 13 December 2024)
- ML20100H262 + (10:48:08, 13 December 2024)
- ML20100H261 + (10:48:09, 13 December 2024)
- ML20100H251 + (10:48:10, 13 December 2024)
- ML20100H247 + (10:48:11, 13 December 2024)
- BECO-85-067, Application for Amend to License DPR-35,adding Footnote to Tech Spec Section 3.7.D.2,granting Temporary Relief to Allow Hydrogen Injection Testing + (10:48:12, 13 December 2024)
- ML20100H236 + (10:48:13, 13 December 2024)
- ML20100H225 + (10:48:14, 13 December 2024)
- ML20100H219 + (10:48:15, 13 December 2024)
- ML20100H214 + (10:48:16, 13 December 2024)
- ML20100H213 + (10:48:17, 13 December 2024)
- ML20100H212 + (10:48:18, 13 December 2024)
- ML20100H209 + (10:48:19, 13 December 2024)
- ML20100H198 + (10:48:21, 13 December 2024)
- ML20100H200 + (10:48:21, 13 December 2024)
- ML20100H192 + (10:48:22, 13 December 2024)
- ST-HL-AE-5302, Forwards Rev 3 to EPIP 0ERP01-ZV-TS08, Security Manager Which Was Inadvertenly Omitted in ST-HL-AE-5292 + (10:48:23, 13 December 2024)
- 05000483/LER-1985-015, :on 850228,failure to Perform 850225 Tritium Sampling Discovered.Sample Collected,Analyzed & Found within Tech Spec Limit.Tracking Sys for Tech Spec Surveillance Requirements Modified + (10:48:25, 13 December 2024)
- 05000483/LER-1985-014, :on 850227,control Room Ventilation Isolation Signal Occurred.Cause Undetermined.Incident Considered Isolated Event W/No Further Corrective Action Required + (10:48:27, 13 December 2024)
- 05000483/LER-1985-013, :on 850226,mini-purge Commenced W/Containment Atmosphere Monitors in Bypass.Caused by Inadequate procedure.Mini-purge Terminated.Procedures Re Backup Monitor Operability During mini-purge Revised + (10:48:30, 13 December 2024)
- ML20100H164 + (10:48:31, 13 December 2024)
- ML20100H158 + (10:48:33, 13 December 2024)
- RC-96-0048, 1995 Annual Operating Rept VC Summer Nuclear Station. W/ + (10:48:34, 13 December 2024)
- ML20100H156 + (10:48:34, 13 December 2024)
- ML20100H148 + (10:48:35, 13 December 2024)
- ML20100H147 + (10:48:36, 13 December 2024)
- ML20100H142 + (10:48:38, 13 December 2024)
- ML20100H141 + (10:48:38, 13 December 2024)
- ML20100H138 + (10:48:40, 13 December 2024)
- ML20100H137 + (10:48:41, 13 December 2024)
- 05000259/LER-1985-005-03, :on 850227,during HPCI Sys Surveillance Testing,Time to Reach Rated Flow 2 Longer than Surveillance Instruction Spec of 25 S.Caused by Inadvertent Closing of Ball Valve on Turbine Hydraulic Sys + (10:48:43, 13 December 2024)
- 05000296/LER-1985-004, :on 850122,Surveillance Instruction 4.3.A.2 Performed 1 Day Later than Allowed by Tech Specs.Caused by Personnel Error in Interpreting Frequency Requirements. Procedures Re Performance Dates Revised + (10:48:46, 13 December 2024)
- ML20100H132 + (10:48:48, 13 December 2024)
- 05000260/LER-1985-003-04, :on 850227,automatic Scram Occurred When Fuses Removed from Reactor Protection Sys Circuitry During Mod. Caused by Deficient Work Plan.Plan Revised + (10:48:49, 13 December 2024)
- ML20100H127 + (10:48:54, 13 December 2024)
- 05000259/LER-1985-001-01, :on 850121,drywell Leakage Rate in Excess of Tech Specs Noted.Caused by Leak in Temporary Hose Used to Test Check Valve & Small Weld Crack Inside Drywell.Crack Repaired.Procedures Revised + (10:48:56, 13 December 2024)
- ML20100H121 + (10:48:58, 13 December 2024)
- PY-CEI-NRR-2022, Provides Operating Licensing National Exam Schedule,Which Reflects Anticipated Exam Dates for FY96-99 + (10:48:59, 13 December 2024)
- ML20100H112 + (10:49:00, 13 December 2024)
- HL-5116, Forwards Proposed Operator Licensing Schedule for FY96-99. Informs That 1996 Dates for Licensed Operator Requalification Exams Scheduled for Wks of 960812,26,0909, 23 & 1007 + (10:49:01, 13 December 2024)
- 05000251/LER-1985-021, :on 840920,turbine Runback & Reactor Trip Occurred Upon Nis Rod Drop Signal.Caused by Failure of Inverter 4A to Provide Power to Vital 120-volt Instrument Bus,Panel 4P07,due to Blown Fuse + (10:49:03, 13 December 2024)
- 3F0296-16, Forwards Completed NRC Form 536, Operator Licensing Exam Data for Facility as Requested in Administrative Ltr 96-01, Including Info Re Estimated Number of Candidates to Be Examined During Visits to Site + (10:49:04, 13 December 2024)
- U-602556, Forwards Initial Operator Exam Schedule Requested in NRC Administrative Ltr 96-01.Next Operator Requalification Exam as Listed + (10:49:05, 13 December 2024)